Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 13 pages
Exam (elaborations)

Unrestricted CSL Practice Questions And All Correct Answers.

Document preview thumbnail
Preview 2 out of 13 pages

Who is authorized to enforce the provisions of 780 CMR, review/issue permit applications, issue noticed/orders, and make required inspections? - Answer Building official IRC Amendments R104.1 General Who shall receive and issue permits? - Answer Building official IRC Amendments R104.2 Application and Permits Who shall issue notices and orders? - Answer Building official IRC Amendments R104.3 who shall make the required inspections? - Answer Building official IRC Amendments R104.4 A permit is required for work including but not limited to repairs for substantial cutting of walls - Answer IRC Amendments R105.2.2 Repairs The building official shall issue or deny a permit within ___ days of filing - Answer 30 days IRC Amendments R105.3.1 Action on Application How many days does a building inspector have to act on a permit application a.) 180 days b.) 90 days c.) 30 days d.) 60 days - Answer c.) 30 days IRC Amendments R105.3.1 Action on Application

Content preview

Unrestricted CSL Practice Questions
And All Correct Answers.
Who is authorized to enforce the provisions of 780 CMR, review/issue permit applications, issue
noticed/orders, and make required inspections? - Answer Building official

IRC Amendments R104.1 General



Who shall receive and issue permits? - Answer Building official

IRC Amendments R104.2 Application and Permits



Who shall issue notices and orders? - Answer Building official

IRC Amendments R104.3



who shall make the required inspections? - Answer Building official

IRC Amendments R104.4



A permit is required for work including but not limited to repairs for substantial cutting of walls - Answer
IRC Amendments R105.2.2 Repairs



The building official shall issue or deny a permit within ___ days of filing - Answer 30 days

IRC Amendments R105.3.1 Action on Application



How many days does a building inspector have to act on a permit application

a.) 180 days

b.) 90 days

c.) 30 days

d.) 60 days - Answer c.) 30 days

IRC Amendments R105.3.1 Action on Application

, Every permit issued shall become invalid unless the work authorized by such permit is commended
within ___ days. The building official can grant one or more extensions for periods not more than ____
days - Answer 180 days, 90 days

IRC Amendments R105.3.2 Time Limitation on Application



A permit may be suspended or revoked for all of the following reasons, except

a.) where it is issued in error

b.) on the basis of incomplete information

c.) where issued in violation of jurisdictional ordinance

d.) where other permits by the contractor have been voided - Answer d.) where other permits by the
contractor have been voided

IRC Amendments R105.6



Submittal documents consisting of construction documents, and other data shall be submitted in ____ or
more sets with each application for a permit - Answer two sets

IRC Amendments R107.1 Submittal Documents



Townhouse buildings greater than 35,000 square feet require a ______ - Answer registered design
professional

IRC Amendments R107.1.6 Townhouse buildings greater than 35,000 square feet



On which drawing will you find the building location and lot lines? - Answer Site plan/plot plan

IRC Amendments R107.2 Site Plan or Plot Plan



Who should the building official notify inspections for on-site construction? - Answer permit holder

R109.1 Type of inspections



What is required for a certificate of occupancy

1a) building permit number

b.) assessed value of the structure

Document information

Uploaded on
January 9, 2025
Number of pages
13
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$10.69

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TestSolver9
3.5
(165)
Sold
958
Followers
128
Items
30723
Last sold
2 days ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions