MSSC Quality Systems Exam
Questions Complete Solutions New
Update (Verified Answers)
Automated part inspection commonly uses __________. - ✔✔vision systems
Parts labeled ______ should be inspected to determine if they should be reworked or scrapped. - ✔✔hold
_____________ inspections assure that the equipment, personnel and processes being used are providing
the desired results and allow systems to be pinpointed and solutions implemented before the problem
can escalate. - ✔✔In-process
When parts need further inspection they should be labeled as ______. - ✔✔Hold
Red tags are typically attached to parts that are __________. - ✔✔scrapped
The cost of a product's raw materials does not typically determine if __________. - ✔✔the product is non-
conforming
Parts that are labeled as ok To ship must _________. - ✔✔meet compliance
Measurement of product quality attributes can be assisted by performing __________. - ✔✔daily quality
and equipment checks
The sampling plan uses a(n) _________ chart that indicates to an inspector the number of parts to inspect
based on the size of the product batch. - ✔✔frequency
Katelyn Whitman© 2025, All Rights Reserved.
, 2|Page
Certain characteristics of parts are essential for its proper operation. Identifying these characteristics as
_______ helps set up a meaningful quality inspection program. - ✔✔critical
An engineering change notice (ECN) is used to notify changes to __________. - ✔✔a product drawing
The review of audit procedures and instructions are control and planning functions within a(n)
__________. - ✔✔traceability program
A ___________ is used to verify that the proper procedures and processes are being adhered to by plant
personnel. - ✔✔quality audit program
Instrument reliability is examined to determine _____________________. - ✔✔calibration intervals
The calibration of instruments and measurement devices is typically checked as a part of a
_______________. - ✔✔quality audit
Machine time, task time, and quality requirements are information needed to __________. - ✔✔document
each process
Manufacturers would typically have a _______________ performed to make sure its quality system is
being maintained effectively. - ✔✔quality system audit
A(n) ________ should always be someone outside the organization. - ✔✔third party audit group
Auditors should always _____________ if the problem has been corrected. - ✔✔include the problem in
their report
The main objective of a _____________ is to make sure corrective action is taken to eliminate problems
permanently. - ✔✔Material Review Board (MRB)
Electrical equipment should only be worked on ____________. - ✔✔after someone has inspected and
tested the equipment to ensure that is has been properly de-energized