100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

QSP COURSE QUESTIONS WITH CORRECT ANSWERS

Rating
-
Sold
-
Pages
5
Grade
A+
Uploaded on
28-12-2024
Written in
2024/2025

QSP COURSE QUESTIONS WITH CORRECT ANSWERS When does risk level one has to sample? - ANSWER -When required for non-visible pollutants. ATS instruments shall record which of the following? - ANSWER -Flow, turbidity, and pH Which factor(s) of RUSLE can be based on site-specific analysis rather than maps? - ANSWER -K and LS Failure to obtain coverage under the permit for storm water discharges to waters of the US is a violation of the - ANSWER -Clean Water Act and California Water Code For traditional construction projects the LRP may be - ANSWER -The person who possesses real properly interest in the land upon which the construction activities will occur for the regulated site What does NTU measure? - ANSWER -a measurement of optical properties of a liquid that cause light rays to be scattered and absorbed rather than transmitted in straight lines through a sample. Inspection Records have to be kept until the project is complete or three years, whichever comes first. - ANSWER -False Which factor(s) of RUSLE must be changed to recalculate risk when the construction duration has changed? - ANSWER -R BMP stands for - ANSWER -Best Management Practice Do type 1 LUPs typically have a high potential to impact storm quality? - ANSWER -No What does RUSLE stand for? - ANSWER -Revised Universal Soil Loss Equation A discharger must notify the Regional Water Boards if there are planned changes in the construction activity that - ANSWER -May result in non-compliance A qualifying storm event is - ANSWER -A rain even that produces 1/2 inch or more of precipitation with a period of 48 hours or more between rain events. Continuous monitoring (no less than 15-min intervals) of ATS is required for: - ANSWER - Rain Event Action Plan must be developed by a QSD - ANSWER -False The CGP allows for not monitoring under what conditions? - ANSWER -Dangerous weather conditions, unsafe storm event, and outside of scheduled operations. What is the difference between erosion and sedimentation? - ANSWER -Erosion is the dislodging and transport of soil and sedimentation is the deposition of material. CSMP stands for - ANSWER -Construction Site Monitoring Program What weather forecast would trigger a reap? - ANSWER -50% chance of rain, within 48 hours. During routine inspection a LUP discharger observes a non-stormwater discharge and therefore must prepare a non storm water report. - ANSWER -UNSURE* but: False (no non-stormwater report exists?) What BMP does the permit discourage? - ANSWER -Plastic cover (maybe sediment basin?) What factors are used for RUSLE? - ANSWER -R, K, LS, C, P Which two best represent an ATS "mode of operation"? - ANSWER -Flow through and Batch treatment What does NPDES stand for? - ANSWER -National Pollutant Discharge Elimination System When shall a discharger conduct a construction site evaluation and run-on evaluation? - ANSWER -Whenever the results from a storm event daily average indicate that the discharge is below the lower NAL for pH, exceeds the upper NAL for pH, or exceeds the turbidity NAL. You only have to cover waste containers prior and during a rain event. - ANSWER - False (at the end of each day) Does this permit constitute a waiver of water quality certification under CWA section 401? - ANSWER -ANSWER unknown (yes, no, sometimes, when the site looks good) Run-on and Run-off controls are not required for? - ANSWER -Risk level 1 projects and type 1 LUP projects The SWPPP shall be available? - ANSWER -At the project site. Which BMP category should be used as the primary line of defense of erosion preventing? - ANSWER -Soil stabilization. Bioassessment monitoring is an assessment of - ANSWER -measure of the number and diversity of benthic macroinvertebrates in a water body. Which of the following are examples of erosion control? - ANSWER -Protective blankets, wildflowers, and straw ATS stands for - ANSWER -Active Treatment System For each day of discharge from a qualifying event, the absolute minimum number of pH and turbidity effluent samples is - ANSWER -Three The primary goal of BMP implementation is to? - ANSWER -Prevent or reduce the discharge of pollutants Other reputable sources may be substituted for NOAA weather forecasts - ANSWER - False If required, when should risk level 1 sites conduct discharge sampling? - ANSWER - During business hours Who is responsible for identifying the monitoring locations in the SWPPP? - ANSWER - the QSD Construction general permit order DWQ- regulates storm water discharges from? - ANSWER -All linear utility projects and construction sites that disturb over 1 acre * Are sediment control BMPs a primary or secondary means of preventing storm water contamination - ANSWER -Secondary Are LUP projects subject to the post-construction standards in the construction general permit? - ANSWER -Yes * All permit registration documents (PRDs) must be certified by ________ - ANSWER -a legally responsible person (LRP) or legally authorized approved signatory Quarterly non-storm water discharge monitoring inspections are not required for - ANSWER -Linear underground/overhead projects (LUP) sites ATS records must be kept for three years after project completion. - ANSWER -True When is receiving water monitoring required for a risk level 3 site? - ANSWER -When there is a direct discharge to receiving waters* and effluent is outside the pH range of 6.0-9.0 or turbidity exceeds 500 NTU.

Show more Read less
Institution
QSP COURSE
Course
QSP COURSE









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
QSP COURSE
Course
QSP COURSE

Document information

Uploaded on
December 28, 2024
Number of pages
5
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

. QSP COURSE QUESTIONS WITH CORRECT ANSWERS

When does risk level one has to sample? - ANSWER -When required for non-visible
pollutants.

ATS instruments shall record which of the following? - ANSWER -Flow, turbidity, and
pH

Which factor(s) of RUSLE can be based on site-specific analysis rather than maps? -
ANSWER -K and LS

Failure to obtain coverage under the permit for storm water discharges to waters of the
US is a violation of the - ANSWER -Clean Water Act and California Water Code

For traditional construction projects the LRP may be - ANSWER -The person who
possesses real properly interest in the land upon which the construction activities will
occur for the regulated site

What does NTU measure? - ANSWER -a measurement of optical properties of a liquid
that cause light rays to be scattered and absorbed rather than transmitted in straight
lines through a sample.

Inspection Records have to be kept until the project is complete or three years,
whichever comes first. - ANSWER -False

Which factor(s) of RUSLE must be changed to recalculate risk when the construction
duration has changed? - ANSWER -R

BMP stands for - ANSWER -Best Management Practice

Do type 1 LUPs typically have a high potential to impact storm quality? - ANSWER -No

What does RUSLE stand for? - ANSWER -Revised Universal Soil Loss Equation

A discharger must notify the Regional Water Boards if there are planned changes in the
construction activity that - ANSWER -May result in non-compliance

A qualifying storm event is - ANSWER -A rain even that produces 1/2 inch or more of
precipitation with a period of 48 hours or more between rain events.

Continuous monitoring (no less than 15-min intervals) of ATS is required for: -
ANSWER -

Rain Event Action Plan must be developed by a QSD - ANSWER -False

, The CGP allows for not monitoring under what conditions? - ANSWER -Dangerous
weather conditions, unsafe storm event, and outside of scheduled operations.

What is the difference between erosion and sedimentation? - ANSWER -Erosion is the
dislodging and transport of soil and sedimentation is the deposition of material.

CSMP stands for - ANSWER -Construction Site Monitoring Program

What weather forecast would trigger a reap? - ANSWER -50% chance of rain, within 48
hours.

During routine inspection a LUP discharger observes a non-stormwater discharge and
therefore must prepare a non storm water report. - ANSWER -UNSURE* but: False (no
non-stormwater report exists?)

What BMP does the permit discourage? - ANSWER -Plastic cover (maybe sediment
basin?)

What factors are used for RUSLE? - ANSWER -R, K, LS, C, P

Which two best represent an ATS "mode of operation"? - ANSWER -Flow through and
Batch treatment

What does NPDES stand for? - ANSWER -National Pollutant Discharge Elimination
System

When shall a discharger conduct a construction site evaluation and run-on evaluation?
- ANSWER -Whenever the results from a storm event daily average indicate that the
discharge is below the lower NAL for pH, exceeds the upper NAL for pH, or exceeds the
turbidity NAL.

You only have to cover waste containers prior and during a rain event. - ANSWER -
False (at the end of each day)

Does this permit constitute a waiver of water quality certification under CWA section
401? - ANSWER -ANSWER unknown (yes, no, sometimes, when the site looks good)

Run-on and Run-off controls are not required for? - ANSWER -Risk level 1 projects and
type 1 LUP projects

The SWPPP shall be available? - ANSWER -At the project site.

Which BMP category should be used as the primary line of defense of erosion
preventing? - ANSWER -Soil stabilization.

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TheExamMaestro Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
121
Member since
1 year
Number of followers
5
Documents
3167
Last sold
1 week ago
Exam Vault

Exam Vault is your trusted destination for high-quality exam materials and study resources. We provide a wide rage of tests and prep guides to help you succeed, whether you're preparing for academic exams, certifications, or professional assessments

3.8

13 reviews

5
7
4
2
3
1
2
0
1
3

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions