What does CMIS stand for? - ✔✔✔ Correct Answer > Consumer
Mold Information Sheet
True / False: Notice signs must be displayed continuously during the
period in which active mold remediation is ongoing. - ✔✔✔ Correct
Answer > True
Not later than ____ calendar days after the project stop-date, the MRC
shall provide the property owner a Certificate of Mold Damage
Remediation . - ✔✔✔ Correct Answer > 10
When are containments not required?
A. <25 Contiguous Ft
B. Building Owner Approval
C. TDLR Approval
, D. Building Unoccupied - ✔✔✔ Correct Answer > D. Building
Unoccupied
What does MAC stand for? - ✔✔✔ Correct Answer > Mold
Assessment Consultant
True / False: MRC and MAC are required to give a copy of the CMIS to
each client and to the property owner, if not the same person, before
starting any mold-related activity. - ✔✔✔ Correct Answer > True
Not later than ____ calendar days after the project stop-date, the MRC
shall provide the property owner with copies of required photographs
of the scene of the mold remediation taken before and after the
remediation. - ✔✔✔ Correct Answer > 7
Who needs to sign the Certificate of Mold Damage Remediation? -
✔✔✔ Correct Answer > MRC and MAC
What 4 types of Toxigenic Mold species are known to produce
mycotoxins? - ✔✔✔ Correct Answer > 1. Stachybotrys
2. Aspergillus
3. Penicillium
4. Fusarium
CONTRACTOR STATE EXAM | NEWEST
ACTUAL EXAM COMPLETE QUESTIONS
AND VERIFIED ANSWERS GRADED A+ |
100% PASS | 2025 UPDATE!
What does CMIS stand for? - ✔✔✔ Correct Answer > Consumer
Mold Information Sheet
True / False: Notice signs must be displayed continuously during the
period in which active mold remediation is ongoing. - ✔✔✔ Correct
Answer > True
Not later than ____ calendar days after the project stop-date, the MRC
shall provide the property owner a Certificate of Mold Damage
Remediation . - ✔✔✔ Correct Answer > 10
When are containments not required?
A. <25 Contiguous Ft
B. Building Owner Approval
C. TDLR Approval
, D. Building Unoccupied - ✔✔✔ Correct Answer > D. Building
Unoccupied
What does MAC stand for? - ✔✔✔ Correct Answer > Mold
Assessment Consultant
True / False: MRC and MAC are required to give a copy of the CMIS to
each client and to the property owner, if not the same person, before
starting any mold-related activity. - ✔✔✔ Correct Answer > True
Not later than ____ calendar days after the project stop-date, the MRC
shall provide the property owner with copies of required photographs
of the scene of the mold remediation taken before and after the
remediation. - ✔✔✔ Correct Answer > 7
Who needs to sign the Certificate of Mold Damage Remediation? -
✔✔✔ Correct Answer > MRC and MAC
What 4 types of Toxigenic Mold species are known to produce
mycotoxins? - ✔✔✔ Correct Answer > 1. Stachybotrys
2. Aspergillus
3. Penicillium
4. Fusarium