100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

Walmart - Stormwater Exam UPDATED ACTUAL Questions and CORRECT Answers

Rating
-
Sold
-
Pages
3
Grade
A+
Uploaded on
26-12-2024
Written in
2024/2025

Walmart - Stormwater Exam UPDATED ACTUAL Questions and CORRECT Answers The 1970's law that set into place the regulation of stormwater is: - CORRECT ANSWER - The Clean Water Act Requirements for managing stormwater activity on a construction site are outlined in the following regulation: - CORRECT ANSWER - NPDE

Show more Read less
Institution
Stormwater
Course
Stormwater








Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Stormwater
Course
Stormwater

Document information

Uploaded on
December 26, 2024
Number of pages
3
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

Walmart - Stormwater Exam UPDATED
ACTUAL Questions and CORRECT
Answers
The 1970's law that set into place the regulation of stormwater is: - CORRECT
ANSWER - The Clean Water Act


Requirements for managing stormwater activity on a construction site are outlined in the
following regulation: - CORRECT ANSWER - NPDES


Which of the following is never an allowable stormwater discharge from a construction site? -
CORRECT ANSWER - Discharge from contaminated groundwater



The Notice of termination can filed when: - CORRECT ANSWER - All construction
activity, inside and outside the building, is complete and permanent stabilization verified


Relative to stormwater permitting, all of the following must occur before construction starts
except: - CORRECT ANSWER - Submit the notice of termination (NOT)


Which erosion control best mgmt practice increases water infiltration, dissipates rainfall energy
and slows overland flow of stormwater - CORRECT ANSWER - Vegetation


Of the following factors that influence erosion rates, the one a contractor has the most control
over is: - CORRECT ANSWER - Groundcover



Temporary stabilization should be implemented - CORRECT ANSWER - Immediately on
all disturbed areas that are likely to or will remain inactive for 14-days or more


The Primary purpose of a construction exit is - CORRECT ANSWER - To remove
sediment from construction site vehicles and minimize trackout

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
MGRADES Stanford University
View profile
Follow You need to be logged in order to follow users or courses
Sold
1090
Member since
1 year
Number of followers
102
Documents
68972
Last sold
1 day ago
MGRADES (Stanford Top Brains)

Welcome to MGRADES Exams, practices and Study materials Just think of me as the plug you will refer to your friends Me and my team will always make sure you get the best value from the exams markets. I offer the best study and exam materials for a wide range of courses and units. Make your study sessions more efficient and effective. Dive in and discover all you need to excel in your academic journey!

3.8

175 reviews

5
75
4
31
3
46
2
8
1
15

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions