For which of the following building types are WELL Building Standard v1 NOT applicable?
Choose 2
New tenant space in an office building
New core and shell development
New single family residence
New hospital building - CORRECT ANSWER - New single family residence, new
hospital building
How often should a WELL certified project under recertification verify continuous performance
in accordance with the WELL Building Standard? - CORRECT ANSWER - Every 3 years
According to a study completed by the World Green Building Council, it shows Staff costs such
as salaries and benefits account for ____ of most business operational expenses - CORRECT
ANSWER - 90%
The New and Existing Building typology is relevant for office buildings where a minimum of
___ of the total floor area is occupied by the building owner and is operated by the same
management. - CORRECT ANSWER -
Which of the following conditions must be met for a new building project team to schedule the
WELL Performance Verification? - CORRECT ANSWER - Documentation approved, one
month from Certificate of Occupancy, 50% occupancy achieved
What minimum score must an existing 2 story retail building earn in any concept to qualify for
WELL silver certification? - CORRECT ANSWER -5
, What is the role of a WELL AP? - CORRECT ANSWER - Guide projects to a successful
certification or compliance award
Which of the following are characteristics of WELL features?
All features are required to be satisfied for WELL certification
Features can be only Prescriptive standards
Features can be only Performance-based standards
Features can be Performance-based standards or Prescriptive standards - CORRECT
ANSWER - Features can be Performance-based standards or Prescriptive standards
Which of the following are annotated documents that should be turned in for a WELL
certification application?
Lighting drawings and mechanical drawings
Furniture plans and equipment schedules
Lighting drawings and floor plans
Floor plans and lighting specifications - CORRECT ANSWER - Lighting drawings and
mechanical drawings.
What percent of WELL Preconditions must be met in order to achieve Silver Certification for a
Pilot Project? - CORRECT ANSWER - 100%
Which of the following is TRUE about the project administrator? Choose 3
a) The project administrator ensures completeness and accuracy of documents submitted
b) The project administrator can be a WELL Accredited Professional (WELL AP)
c) The project administrator is the primary point of contact on the project
d) The project administrator is responsible for review of all documentation and on-site testing