PIPEFITTER EXAM ACTUAL EXAM COMPLETE 200 QUESTIONS WITH DETAILED VERIFIED ANSWERS (100% CORRECT ANSWERS) /ALREADY GRADED A+ what is the take out of a 10" short radius weld 90 elbow - ANSWER -10" acetylene bottles have fusible link that melts at what temp - ANSWER -220 degrees or 212 best answer what is the pressure inside of oxygen cylinder - ANSWER -2000lbs/2500lbs where the tags for ox bottles are located - ANSWER -the shoulder of the bottle which direction does a hacksaw blade cut - ANSWER -forward what tubing bend is used in installation of pipe - ANSWER -hickey when handling a newly threaded piece of pipe you must be careful because its - ANSWER -sharp what is the purpose of the foot pedal on a pipe threading machine - ANSWER -safety when welding socket weld fittings what is the process - ANSWER -shoulder all the way then remove 1/16 from shoulder and tack weld which code governs the installation of process piping - ANSWER -B31.3 which valve is not appropriate as a boiler steam outlet valve on high pressure boilers - ANSWER -ball valve who is responsible to qualify a welder - ANSWER -employer 2 | P a g e Crafted for Academic Insight by ©Olivia GreenWays 2025. All rights reserved. what temperature does an oxy cutting torch run at - ANSWER -5438 or 6630 which stamp is required for the assembly of high pressure boilers - ANSWER -"A" stamp high pressure pipe welding and welder must be qualified to section ______ of the ASME code - ANSWER -9 what welding position is commonly used for welding test that will qualify you for all positions - ANSWER -6G what is the hardest welding position to use - ANSWER -6 a stop valve and check valve are installed in the - ANSWER -feed water line when piping up a low water cut off device to a boiler, the device must be piped to what height in relation to the level of the gauge glass - ANSWER -no lower than the visible part of the gauge glass what is the minimum size of the drain pipe and the blow valve required on a low water cut off that has a seperate float chamber - ANSWER -3/4' the valve that offers the least resistance to flow us the ____ valve - ANSWER -gate what type of fitting must be placed in the water piping connection at every angfle to facilitate cleaning and inspection of a water column or low water cut off - ANSWER -cross tee fitting which way should the pressure excerpt on the globe valve seats - ANSWER -below when should you change the packing on a valve with pressure behind it - ANSWER -never what does the packing nut prevent from leaking - ANSWER -the valve stem hanger rods supporting pipe 2 1/2" nps and larger shall not be less than what diameter - ANSWER - 1/2" 3 | P a g e Crafted for Academic Insight by ©Olivia GreenWays 2025. All rights reserved. a water column piped to a high pressure boiler shall be piped with a minimum size connection of - ANSWER -1" when piping up a boiler gauge glass to a water tube boiler, the lowest visible part of the water gauge glass shall be at least how many inches above permissable water level - ANSWER -2" a slow opening valve requires how many complete turns to be opened or closed - ANSWER -5 the ASME power piping code B31.1 limits the size of ansi class 600 socket weld flanges for use in boiler external piping, what is the maximum size limitation - ANSWER -3" cast iron pipe can be used to carry steam at what pressure - ANSWER -250 psig when welding high pressure piping that is within boundaries known as boile

Content preview

1|Page




PIPEFITTER EXAM ACTUAL EXAM COMPLETE
200 QUESTIONS WITH DETAILED VERIFIED
ANSWERS (100% CORRECT ANSWERS)
/ALREADY GRADED A+


what is the take out of a 10" short radius weld 90 elbow - ANSWER ✔✔-10"


acetylene bottles have fusible link that melts at what temp - ANSWER ✔✔-220 degrees or 212 best answer


what is the pressure inside of oxygen cylinder - ANSWER ✔✔-2000lbs/2500lbs


where the tags for ox bottles are located - ANSWER ✔✔-the shoulder of the bottle


which direction does a hacksaw blade cut - ANSWER ✔✔-forward


what tubing bend is used in installation of pipe - ANSWER ✔✔-hickey


when handling a newly threaded piece of pipe you must be careful because its - ANSWER ✔✔-sharp


what is the purpose of the foot pedal on a pipe threading machine - ANSWER ✔✔-safety


when welding socket weld fittings what is the process - ANSWER ✔✔-shoulder all the way then remove

1/16 from shoulder and tack weld


which code governs the installation of process piping - ANSWER ✔✔-B31.3


which valve is not appropriate as a boiler steam outlet valve on high pressure boilers - ANSWER ✔✔-ball

valve


who is responsible to qualify a welder - ANSWER ✔✔-employer



Crafted for Academic Insight by ©Olivia GreenWays 2025. All rights reserved.

,2|Page


what temperature does an oxy cutting torch run at - ANSWER ✔✔-5438 or 6630


which stamp is required for the assembly of high pressure boilers - ANSWER ✔✔-"A" stamp


high pressure pipe welding and welder must be qualified to section ______ of the ASME code - ANSWER

✔✔-9


what welding position is commonly used for welding test that will qualify you for all positions -

ANSWER ✔✔-6G


what is the hardest welding position to use - ANSWER ✔✔-6


a stop valve and check valve are installed in the - ANSWER ✔✔-feed water line


when piping up a low water cut off device to a boiler, the device must be piped to what height in relation

to the level of the gauge glass - ANSWER ✔✔-no lower than the visible part of the gauge glass


what is the minimum size of the drain pipe and the blow valve required on a low water cut off that has a

seperate float chamber - ANSWER ✔✔-3/4'


the valve that offers the least resistance to flow us the ____ valve - ANSWER ✔✔-gate


what type of fitting must be placed in the water piping connection at every angfle to facilitate cleaning

and inspection of a water column or low water cut off - ANSWER ✔✔-cross tee fitting


which way should the pressure excerpt on the globe valve seats - ANSWER ✔✔-below


when should you change the packing on a valve with pressure behind it - ANSWER ✔✔-never


what does the packing nut prevent from leaking - ANSWER ✔✔-the valve stem


hanger rods supporting pipe 2 1/2" nps and larger shall not be less than what diameter - ANSWER ✔✔-

1/2"




Crafted for Academic Insight by ©Olivia GreenWays 2025. All rights reserved.

, 3|Page


a water column piped to a high pressure boiler shall be piped with a minimum size connection of -

ANSWER ✔✔-1"


when piping up a boiler gauge glass to a water tube boiler, the lowest visible part of the water gauge

glass shall be at least how many inches above permissable water level - ANSWER ✔✔-2"


a slow opening valve requires how many complete turns to be opened or closed - ANSWER ✔✔-5


the ASME power piping code B31.1 limits the size of ansi class 600 socket weld flanges for use in boiler

external piping, what is the maximum size limitation - ANSWER ✔✔-3"


cast iron pipe can be used to carry steam at what pressure - ANSWER ✔✔-250 psig


when welding high pressure piping that is within boundaries known as boiler external piping, you must

have what type of asme stamp - ANSWER ✔✔-"PP" stamp


what stamp is required for piping on high pressure boilers - ANSWER ✔✔-"A" stamp


high pressure pipe welding and welders must be qualified to which section of the ASME code - ANSWER

✔✔-9


if a muffler is used on a safety valve, it shall have sufficient outlet area to prevent back pressure from

interfering with the proper operation and discharge capacity of the valve, mufflers shall not be used

under which of the following - ANSWER ✔✔-high temp water boiler safety relief valves


a syphon is used to - ANSWER ✔✔-protect a steam pressure gauge


the purpose of a safety valve is to - ANSWER ✔✔-protect the boiler from excess pressure


the pipe fitters license is governed by chapter 146 og M.G.L. the section of this law is section _____ of the

M.G.L. - ANSWER ✔✔-81


black iron pipe is described in size and _____ - ANSWER ✔✔-schedule




Crafted for Academic Insight by ©Olivia GreenWays 2025. All rights reserved.

Document information

Uploaded on
December 9, 2024
Number of pages
16
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$12.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
OliviaGreenways
4.0
(6)
Sold
40
Followers
2
Items
1815
Last sold
2 days ago

Reviews from verified buyers



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions