Answers(RATED A+)
What is the purpose of the QA Program? - ANSWERAll of The Above
Who is responsible for the day to day organization, administration and execution of
the ship's QA program? - ANSWERQuality Assurance Officer (QAO)
Who provides senior command level authority to backup QAO in the performance of
the QAO's duties? - ANSWERXO
Work Center Supervisor's are responsible for ? - ANSWERTrue
Quality Assurance Inspector's (QAI's) are some of the responsible for ? -
ANSWERTrue
When writing a FWP, which symbols are required at the left-hand margin of the
maintenance procedure? - ANSWERAll the above
What is a Controlled Work Package (CWP) - ANSWERAll the above
What system(s) aboard USS Winston S Churchill require use of CWP when
conducting repairs? - ANSWERAll The Above
Ship's craftsman are responsible for ? - ANSWERTrue
The_______ and ________ should inspect any and all TMDE (Gage-cal equipment)
for physical damage and, where possible, ensure the equipment functions as
required? - ANSWERWCS and Craftsman
What are the types of "pre-existing) Maintenance Procedures (MP's) - ANSWERAll
the Above
What are the types of technical work documents ? - ANSWERAll the above
When performing repairs and/or corrective maintenance, when is a TWD required ? -
ANSWERAll the above
State the purpose of a Formal Work Procedure (FWP) - ANSWERAll the Above
What system(s) aboard USS Winston S Churchill (DDG-81) require use of FWP
when conducting repairs? - ANSWERAll the Above
At a minimum, what elements are mandatory when writing a FWP - ANSWERAll the
above