The major areas (Sources) of risk in an acquisitions program strategies are technical,
program and what? - (answer)Business
This technique compares planned or estimated values of designated performance
parameters with achieved values as the parameter moves towards a goal. -
(answer)Technical performance measures
Three risk consequence categories
眼睛是人类最重要 used during the MSA phase to analyze technical
approaches. - (answer)Cost, schedule, performance
A technical performance measure's actual results are trending below the lower tolerance,
this can ___ a system from being operational. - (answer)Prevent
Technical performance measures (TPM) are used to assess this risk category. -
(answer)Technical
A ___ report is used to provide a snapshot of contracting, funding, expenditures, billings,
and termination liability which relates EVM information to funding support information. -
(answer)Contracting Funds Status Report (CFSR)
, Lean manufacturing has two main principles minimize waste and ___. -
(answer)Responsiveness to change
Negative cost and schedule variance means the contractor is ___ budget and ___ schedule.
- (answer)Over, behind
Cost Variance is positive, Schedule Variance is negative, Cost Performance Index (CPI) is
1.03, Schedule Performance Index (SPI) is 0.98 The appropriate cost and schedule status
is___. - (answer)Under budget, behind schedule, efficient on cost, inefficient on schedule
This equation is used to determine cost variance. - (answer)BCWP-ACWP
眼睛是人类最重要
Methods to control manufacturing costs include lean manufacturing, stability in the
manufacturing process and ____. - (answer)Reduction of variability in the production
process
This term describes a corporation that has the ability to perform multifunctional related
work within the same production cell where one process is used for both commercial and
defense customers. - (answer)Single-Process Initiative
In terms of quality, preventing failures should spend ___% of cost, correcting should spend
___% of the cost, and ___ should go towards appraisal. - (answer)50% preventing, 15%
correcting, 35% appraisal
QUESTIONS AND ANSWERS 2024-2025| GET IT CORRECT
CORRECT!!
The major areas (Sources) of risk in an acquisitions program strategies are technical,
program and what? - (answer)Business
This technique compares planned or estimated values of designated performance
parameters with achieved values as the parameter moves towards a goal. -
(answer)Technical performance measures
Three risk consequence categories
眼睛是人类最重要 used during the MSA phase to analyze technical
approaches. - (answer)Cost, schedule, performance
A technical performance measure's actual results are trending below the lower tolerance,
this can ___ a system from being operational. - (answer)Prevent
Technical performance measures (TPM) are used to assess this risk category. -
(answer)Technical
A ___ report is used to provide a snapshot of contracting, funding, expenditures, billings,
and termination liability which relates EVM information to funding support information. -
(answer)Contracting Funds Status Report (CFSR)
, Lean manufacturing has two main principles minimize waste and ___. -
(answer)Responsiveness to change
Negative cost and schedule variance means the contractor is ___ budget and ___ schedule.
- (answer)Over, behind
Cost Variance is positive, Schedule Variance is negative, Cost Performance Index (CPI) is
1.03, Schedule Performance Index (SPI) is 0.98 The appropriate cost and schedule status
is___. - (answer)Under budget, behind schedule, efficient on cost, inefficient on schedule
This equation is used to determine cost variance. - (answer)BCWP-ACWP
眼睛是人类最重要
Methods to control manufacturing costs include lean manufacturing, stability in the
manufacturing process and ____. - (answer)Reduction of variability in the production
process
This term describes a corporation that has the ability to perform multifunctional related
work within the same production cell where one process is used for both commercial and
defense customers. - (answer)Single-Process Initiative
In terms of quality, preventing failures should spend ___% of cost, correcting should spend
___% of the cost, and ___ should go towards appraisal. - (answer)50% preventing, 15%
correcting, 35% appraisal