100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

LEAN MANUFACTURING EXAM 2 QUESTIONS AND ANSWERS

Rating
-
Sold
-
Pages
9
Uploaded on
19-11-2024
Written in
2024/2025

LEAN MANUFACTURING EXAM 2 QUESTIONS AND ANSWERS....

Institution
LEAN MANUFACTURING
Course
LEAN MANUFACTURING









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
LEAN MANUFACTURING
Course
LEAN MANUFACTURING

Document information

Uploaded on
November 19, 2024
Number of pages
9
Written in
2024/2025
Type
Exam (elaborations)
Contains
Unknown

Subjects

Content preview

Voice of the Customer (VOC) is:
Designed to help understand feedback from current and future customers
indicating offerings that satisfy, delight, and dissatisfy them.
A Waste Walk is:
A lean tool that involves walking the area that is being studied to identify waste
and potential improvements that can be made.
Critical to Quality (CTQ) is defined as:
The internal critical quality parameters relate to the wants and needs of the
customer.
Group involvement on a VSM team should always include more than eight
people.
FALSE
Waste walks are a useful tool used to identify potential improvements and are
typically performed by one individual who then reports the findings to the team.
FALSE
Quality Function Deployment is:
A structured methodology and mathematical tool that is used to identify and
quantify customers' requirements and then translate them into key critical
parameters.
A Project Charter is:
Contains the name of the project, the team members and functions, the problem
definition, scope of the project, and the goals to be achieved.
A Spaghetti Diagram is:
A tool that can be used during the waste walk to record the steps in the process
and other information such as distance, time, and so on.

, User Answer CorrectValue Stream Mapping enables a company to visualize the
flow of just material in a process?
FALSE
A Value Stream Map (VSM) is:
Provides an overview of an entire process, starting and finishing at the
customer, and analyzing what is required to meet customer needs.
VSM is similar to process flow charting, but differs in that it includes both the
material and information flows
TRUE
DMAIC is:
A data-driven quality strategy used to improve processes.
VSM was pioneered by Henry Ford but was perfected by Toyota.
TRUE
Applying VSM reduces the risk of "islands of excellence".
FALSE
VSM identifies opportunities for implementation and clues to effective action.
TRUE
Value Stream Mapping is:
A. A tool for tactical implementation
B.A spaghetti Diagram
C. All the Above
d. None of the above
ANSWER---D
What does the following symbol stand for? (Triangle)
Storage
SIPOC stands for:
Supplier, Input, Process, Output, Customer

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Boostertips Chamberlain College Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
261
Member since
3 year
Number of followers
195
Documents
5175
Last sold
1 week ago

3.8

44 reviews

5
19
4
8
3
10
2
2
1
5

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions