100% VERIFIED ANSWERS A+ GRADED
FREE
Where xan xair xconditioning xunit xis xinstalled xon xthe xroof xof xa xschool, xa xconvenience xreceptacle
x________. x- xMust xbe xinstalled xon xthe xsame xlevel xand xwithin x25 xfeet xof xthe xunit
The xwater xpump xmotor xfor xa xcoin-operated xcar xwash xwould xbe xconsidered xto xbe xa x______ xload. x-
xnoncontinuous
Which xof xthe xfollowing xinstallations xare xnot xcovered xby xthe xNEC?
x-Reliant/HL&P xpower xlines xand xequipment xlocated xin xproperty xeasemenets xalong xstreets x
-Sprint xtowers xused xfor xcell xphone xsignal xtransmission
-Bolivar xferry xboats
-Southwest xAirlines xjets xsuch xas x737,s x- xnone xof xthese
Is xit xpermitted xby xthe xNEC xto xinstall xa x40-amp xreceptacle xon xa xcircuit xprotected xby xa x50-A xcircuit
xbreaker?
Y/N x- xNo
A xcontinuous xload xis xany xload xthat xoperates xfor x_______. x- x3 xhours xor xmore
Improper xelectrical xterminations xlead xto xincresed_______.
-Voltage xdropped xacross xthe xterminations
-circut xresistance
-circuit xcurent x- x1 xand x2 xonly