100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

Asphalt Paving Level 2 Questions and Answers (Graded A)

Rating
-
Sold
-
Pages
8
Grade
A+
Uploaded on
07-11-2024
Written in
2024/2025

Asphalt Paving Level 2 Questions and Answers (Graded A)Asphalt Paving Level 2 Questions and Answers (Graded A)Asphalt Paving Level 2 Questions and Answers (Graded A)(T/F:) When the total quantity of hot mix asphalt for the project, as indicated on the plans for Type SP and Type FC mixtures only, is less than 2000 tons, the Engineer will accept the mix on the basis of visual inspection, the Engineer may run acceptance tests to determine the acceptability of the material. - ANSWER-True If the resolution test results compare favorably with the Contractor's QC test results: A. The Lot is accepted at full pay B. The Contractor is required to remove and replace the Lot in question C. The Resolution tests are used for pay for that Lot and the Contractor pays for the testing D. The Contractor's QC results are used for pay for that Lot and the Department pays for the testing E. The Contractor pays for the Resolution testing - ANSWER-(D.) The Contractor's QC results are used for pay for that Lot and the Department pays for testing What materials are approved for use for tack application?

Show more Read less
Institution
Asphalt Paving Level 2
Course
Asphalt Paving Level 2

Content preview

Asphalt Paving Level 2 Questions and
Answers (Graded A)
(T/F:) When the total quantity of hot mix asphalt for the project, as indicated on the
plans for Type SP and Type FC mixtures only, is less than 2000 tons, the Engineer will
accept the mix on the basis of visual inspection, the Engineer may run acceptance tests
to determine the acceptability of the material. - ANSWER-True

If the resolution test results compare favorably with the Contractor's QC test results:
A. The Lot is accepted at full pay
B. The Contractor is required to remove and replace the Lot in question
C. The Resolution tests are used for pay for that Lot and the Contractor pays for the
testing
D. The Contractor's QC results are used for pay for that Lot and the Department pays
for the testing
E. The Contractor pays for the Resolution testing - ANSWER-(D.) The Contractor's QC
results are used for pay for that Lot and the Department pays for testing

What materials are approved for use for tack application?
A. SS-1 or CSS-1, SS-1H or CSS-1H
B. RS-1, RS-2, MC-250, SS-4
C. RS-1h, RS-2, CRS-1h, NTSS-1hm, RA-500
D. All the Above
E. None of the Above - ANSWER-(C.) RS-1h, RS-2, CRS-1h, NTSS-1hm, RA-500

The minimum air temperature (in the shade away from artificial heat) for a 1.5 inch layer
of asphalt is:
A. 40°F
B. 45°F
C. 50°F
D. 65°F and rising - ANSWER-(A.) 40°F

A quality of Asphalt Mix will be:
A. Constructable
B. Conform to specifications
C. Satisfy the functional requirements
D. All the above - ANSWER-(D. All the above) - Constructable, conform to
specifications, and satisfy the functional requirements

Which condition will result in more time available for compaction?
A. SP-19 coarse mix during the day
B. FC-9.5 fine mix at night
C. FC-9.5 coarse mix during the day

, D. SP-12.5 fine mix with PG76-22 - ANSWER-(A.) SP-19 coarse mix during the day

The fallowing statement is true about trucks used to haul asphalt mix:
A. Truck drivers must be certified to haul asphalt mix
B. Truck beds need to be clean and smooth
C. Hole must be present in both sides of truck bed
D. All the above
E. Both B & C - ANSWER-(E. Both B & C) - Truck beds need to be clean and smooth
and hole must be present in both sides of the truck bed

When using a vibratory roller, which is generally correct?
A. Keep the roller frequency high and impact spacing between 10-12 impacts per foot
B. Run low frequency, high amplitude, and 10-12 impacts per foot
C. Vibrate only when the lift of mix is less than 1.25 inches
D. Both A and C
E. Both B and C - ANSWER-(B.) Run low frequency, high amplitude, and 10-12 impacts
per foot

If the desired spread rate is 165 lbs/sq yds for SP mix, what is the construction
tolerance for the layer thickness? - ANSWER--+ 8.3 lbs/sq yds

On the structural layer prior to the friction course, correct any deficiencies before placing
the friction course.
A. Greater than 3/16"
B. Equal to 3/16"
C. Less than 1/8"
D. Greater than 1/8" - ANSWER-Equal to 3/16"

The standard Lot size for FC-5 is:
A. 500 to 1000 tons
B. A day's production
C. 1000 feet
D. 2000 tons
E. 4000 tons - ANSWER-(D.) 2,000 Tons


What do you do? (Spread Rate) - ANSWER-(A.) Spread Rate is in tolerance - document
and continue

Properly operated, the __ should be moving 80%-90% of the time while paving. -
ANSWER-(C.) Augers

Cover Stone for an ARMI layer must be applied at what application rate?
A. 0.6 to 0.8 ft³/yd²
B. 0.26 to 0.33 ft³/yd²
C. 0.34 to 0.57 ft³/yd²

Written for

Institution
Asphalt Paving Level 2
Course
Asphalt Paving Level 2

Document information

Uploaded on
November 7, 2024
Number of pages
8
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
NursingTutor1 West Virginia University
View profile
Follow You need to be logged in order to follow users or courses
Sold
1647
Member since
3 year
Number of followers
1073
Documents
18070
Last sold
12 hours ago
Nursing Tutor

Paper Due? Worry not. Hello. Welcome to NursingTutor. Here you\'ll find verified study materials for your assignments, exams and general school work. All papers here are graded A to help you get the best grade. Also, I am a friendly person so, do not hesitate to send a message in case you have a query. I wish you Luck.

3.8

449 reviews

5
212
4
76
3
90
2
21
1
50

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions