100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

Asphalt Paving LEVEL 2 QUESTIONS AND ANSWERS (VERIFIED 100%)

Rating
-
Sold
-
Pages
21
Grade
A+
Uploaded on
14-05-2025
Written in
2024/2025

Asphalt Paving LEVEL 2 QUESTIONS AND ANSWERS (VERIFIED 100%) What is the calculated application rate? (lbs/sq yds) - ANSWER (E.) 164.0 lbs/sq yds Given: Target Spread Rate: 165 lbs/Sq yds Given: Truck Weights (tons): 18.2, 19.63, 17.56, 18.78, 19.55 Given: Lane R1, Lift 1 Given: Start Station: 5+98 End Station: 13+60 Given: Lane Width: 13.5 feet What do you do? (Spread Rate) - ANSWER (A.) Spread Rate is in tolerance - document and continue Properly operated, the __ should be moving 80%-90% of the time while paving. - ANSWER (C.) Augers Cover Stone for an ARMI layer must be applied at what application rate? A. 0.6 to 0.8 ft³/yd² B. 0.26 to 0.33 ft³/yd² C. 0.34 to 0.57 ft³/yd² D. 0.02 to 0.08 ft³/yd² E. Not a specification requirement - ANSWER (B.) 0.26 to 0.33 ft³/yd² (T/F:) Increasing the layer thickness affects the time available for compaction more than increasing the mix temperature. - ANSWER True Using the classroom Project Core Layout Example - Method B from Module 8 - What are the station numbers for Cores 3-2-1 (576 tons) and 3-2-2 (673 tons)? Given Information: Starting Sta. is 10+00, Paving direction is "Up-Station", Spread rate is 165 lbs/yd², lane width is 12 feet - ANSWER (C.) 52+36, 61+18 Calculate the tack spread rate using the chart from Appendix 1. Given Information: Type of Tack RS-1h, Mix being placed on milled surface. Complete the calculations using the given information. What is the calculated application rate? (gal/yd²) Ending Sta.: 103+60; Beginning Sta.: 87+42; End Reading: 26/6; Beginning Reading: 22/1; Width of Application: 12 feet; Temp of Tack (Emulsified): 180°F - ANSWER 0.05 gal/yd² Calculate the tack spread rate using the chart from Appendix 1. Given Information: Type of Tack RS-1h, Mix being placed on milled surface. Complete the calculations using the given information. What do you do? Ending Sta.: 103+60; Beginning Sta.: 87+42; End Reading: 26/6; Beginning Reading: 22/1; Width of Application: 12 feet; Temp of Tack (Emulsified): 180°F - ANSWER (C.) Spread rate is in specification - document and continue Which technique(s) will produce a smoother mat? A. Emptying the truck in front of the paver B. Hot stop and start the paver C. Wait until the 3rd time before acting D. Increase the frequency of testing until the situation improves E. Both A and D - ANSWER (B.) Hot stop and start the paver If two consecutive QC density sublots for a fine graded mix do not meet the requirements of the table 334-5 Master Production Range: A. Make adjustments and continue B. Terminate the Lot C. Wait until the 3rd time before acting D. Increase the frequency of testing until the situation improves E. Both A and D - ANSWER (B.) Terminate the Lot (T/F:) When the total quantity of hot mix asphalt for the project, as indicated on the plans for Type SP and Type FC mixtures only, is less than 2000 tons, the Engineer will accept the mix on the basis of visual inspection, the Engineer may run acceptance tests to determine the acceptability of the material. - ANSWER True If the resolution test results compare favorably with the Contractor's QC test results: A. The Lot is accepted at full pay B. The Contractor is required to remove and replace the Lot in question C. The Resolution tests are used for pay for that Lot and the Contractor pays for the testing D. The Contractor's QC results are used for pay for that Lot and the Department pays for the testing E. The Contractor pays for the Resolution testing - ANSWER (D.) The Contractor's QC results are used for pay for that Lot and the Department pays for testing (T/F:) A process control sample can be taken anywhere, anytime and is not used in the acceptance decision. - ANSWER True Which Statement(s) is true? A. For fine graded mixes, a type SP-12.5 and a type SP-19.0 can be placed at 2 inches thick

Show more Read less
Institution
Asphalt Paving LEVEL 2
Course
Asphalt Paving LEVEL 2

Content preview

Asphalt Paving LEVEL 2 QUESTIONS
AND ANSWERS (VERIFIED 100%)


What is the calculated application rate? (lbs/sq yds) - ANSWER (E.) 164.0 lbs/sq yds

Given: Target Spread Rate: 165 lbs/Sq yds
Given: Truck Weights (tons): 18.2, 19.63, 17.56, 18.78, 19.55
Given: Lane R1, Lift 1
Given: Start Station: 5+98 End Station: 13+60
Given: Lane Width: 13.5 feet

What do you do? (Spread Rate) - ANSWER (A.) Spread Rate is in tolerance - document
and continue

Properly operated, the __ should be moving 80%-90% of the time while paving. -
ANSWER (C.) Augers

Cover Stone for an ARMI layer must be applied at what application rate?
A. 0.6 to 0.8 ft³/yd²
B. 0.26 to 0.33 ft³/yd²
C. 0.34 to 0.57 ft³/yd²
D. 0.02 to 0.08 ft³/yd²
E. Not a specification requirement - ANSWER (B.) 0.26 to 0.33 ft³/yd²

(T/F:) Increasing the layer thickness affects the time available for compaction more
than increasing the mix temperature. - ANSWER True
Using the classroom Project Core Layout Example - Method B from Module 8 - What
are the station numbers for Cores 3-2-1 (576 tons) and 3-2-2 (673 tons)?

,Given Information: Starting Sta. is 10+00, Paving direction is "Up-Station", Spread rate
is 165 lbs/yd², lane width is 12 feet - ANSWER (C.) 52+36, 61+18

Calculate the tack spread rate using the chart from Appendix 1. Given Information:
Type of Tack RS-1h, Mix being placed on milled surface. Complete the calculations
using the given information.

What is the calculated application rate? (gal/yd²)

Ending Sta.: 103+60; Beginning Sta.: 87+42; End Reading: 26/6; Beginning Reading:
22/1; Width of Application: 12 feet; Temp of Tack (Emulsified): 180°F - ANSWER 0.05
gal/yd²

Calculate the tack spread rate using the chart from Appendix 1. Given Information:
Type of Tack RS-1h, Mix being placed on milled surface. Complete the calculations
using the given information.

What do you do?

Ending Sta.: 103+60; Beginning Sta.: 87+42; End Reading: 26/6; Beginning Reading:
22/1; Width of Application: 12 feet; Temp of Tack (Emulsified): 180°F - ANSWER (C.)
Spread rate is in specification - document and continue

Which technique(s) will produce a smoother mat?
A. Emptying the truck in front of the paver
B. Hot stop and start the paver
C. Wait until the 3rd time before acting
D. Increase the frequency of testing until the situation improves
E. Both A and D - ANSWER (B.) Hot stop and start the paver

If two consecutive QC density sublots for a fine graded mix do not meet the

, requirements of the table 334-5 Master Production Range:
A. Make adjustments and continue
B. Terminate the Lot
C. Wait until the 3rd time before acting
D. Increase the frequency of testing until the situation improves
E. Both A and D - ANSWER (B.) Terminate the Lot

(T/F:) When the total quantity of hot mix asphalt for the project, as indicated on the plans
for Type SP and Type FC mixtures only, is less than 2000 tons, the Engineer will accept
the mix on the basis of visual inspection, the Engineer may run acceptance tests to
determine the acceptability of the material. - ANSWER True

If the resolution test results compare favorably with the Contractor's QC test results:
A. The Lot is accepted at full pay
B. The Contractor is required to remove and replace the Lot in question
C. The Resolution tests are used for pay for that Lot and the Contractor pays for the
testing
D. The Contractor's QC results are used for pay for that Lot and the Department pays
for the testing
E. The Contractor pays for the Resolution testing - ANSWER (D.) The Contractor's QC
results are used for pay for that Lot and the Department pays for testing




(T/F:) A process control sample can be taken anywhere, anytime and is not used in the
acceptance decision. - ANSWER True

Which Statement(s) is true?
A. For fine graded mixes, a type SP-12.5 and a type SP-19.0 can be placed at 2
inches thick

Written for

Institution
Asphalt Paving LEVEL 2
Course
Asphalt Paving LEVEL 2

Document information

Uploaded on
May 14, 2025
Number of pages
21
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$15.49
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
TopGradeGuru
1.5
(2)

Also available in package deal

Thumbnail
Package deal
Asphalt paving level 1 & 2.questions and answers verified 100% correct
-
2 2025
$ 28.18 More info

Get to know the seller

Seller avatar
TopGradeGuru Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
11
Member since
1 year
Number of followers
0
Documents
2428
Last sold
1 week ago
GRADEHUB

We provide access to a wide range of professionally curated exams for students and educators. It offers high-quality, up-to-date assessment materials tailored to various subjects and academic levels. With instant downloads and affordable pricing, it's the go-to resource for exam preparation and academic success.

1.5

2 reviews

5
0
4
0
3
0
2
1
1
1

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions