Which of the following OSHA regulations govern suspended personnel platforms? - ANSWER OSHA 1926.1431 According to ASME B30.3 The prohibited zone for power lines that are 60 kV is - ANSWER 15 ft According to ASME B30.3, load hoist rotation resistant wire rope has a design factor of - ANSWER 5 to 1 According to ASME B30.3 when Lifting a suspended personnel platform design factor for the rigging hardware is - ANSWER 5 to 1 According to ASME B30.3 Load hoist ropes that are not rotation resistant must have a design factor of - ANSWER 5 to 1 The OSHA construction standard for rigging equipment is - ANSWER 1926.251 According to ASME B30.3 on who's recommendations should a preventative maintenance program be set up? - ANSWER Crane manufacturer When using cable or nylon spreaders it is important to remember: - ANSWER The lower the spreader angle the greater the tension According to OSHA when testing a man basket how long must the test pick be maintained? - ANSWER 5 minutes According to ASME B30.3 What is the minimum pitch diameter for load hoisting sheaves? - ANSWER Not less than 18 times rope diameter

Show more Read less
Institution
NCCCO Mobile Crane
Course
NCCCO Mobile Crane









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
NCCCO Mobile Crane
Course
NCCCO Mobile Crane

Document information

Uploaded on
November 5, 2024
Number of pages
12
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

TOWER CRANE QUESTIONS AND ANSWERS
2025
Which,of,the,following,OSHA,regulations,govern,suspended,personnel,platforms?,-
,ANSWER,OSHA,1926.1431



According,to,ASME,B30.3,The,prohibited,zone,for,power,lines,that,are,60,kV,is,-,ANSWER,15,ft


According,to,ASME,B30.3,,load,hoist,rotation,resistant,wire,rope,has,a,design,factor,of,-
,ANSWER,5,to,1



According,to,ASME,B30.3,when,Lifting,a,suspended,personnel,platform,design,factor,for,the,riggi
ng,hardware,is,-,ANSWER,5,to,1


According,to,ASME,B30.3,Load,hoist,ropes,that,are,not,rotation,resistant,must,have,a,design,fact
or,of,-,ANSWER,5,to,1


The,OSHA,construction,standard,for,rigging,equipment,is,-,ANSWER,1926.251


According,to,ASME,B30.3,on,who's,recommendations,should,a,preventative,maintenance,progra
m,be,set,up?,-,ANSWER,Crane,manufacturer


When,using,cable,or,nylon,spreaders,it,is,important,to,remember:,-
,ANSWER,The,lower,the,spreader,angle,the,greater,the,tension



According,to,OSHA,when,testing,a,man,basket,how,long,must,the,test,pick,be,maintained?,-
,ANSWER,5,minutes



According,to,ASME,B30.3,What,is,the,minimum,pitch,diameter,for,load,hoisting,sheaves?,-
,ANSWER,Not,less,than,18,times,rope,diameter

, According,to,ASME,B30.3,what,is,the,minimum,pitch,diameter,for,load,block,sheaves?,-
,ANSWER,Not,less,than,16,times,rope,diameter



According,to,ASME,B30.3,what,is,the,minimum,pitch,diameter,for,boom,hoist,sheaves?,-
,ANSWER,Not,less,than,15,times,rope,diameter



According,to,OSHA,when,lifting,personnel,the,cranes,hook,must,be,the,type,that,-
,ANSWER,Can,be,closed,and,locked



According,to,OSHA,when,working,over,water,with,a,man,basket,are,the,people,inside,required,t
o,wear,a,belt/harness?,-,ANSWER,No,harness,or,belt,required


According,to,ASME,B30.3,when,working,near,powerlines,where,should,caution,stickers,be,install
ed?,-,ANSWER,Operator,station,and,at,the,base,of,the,crane


According,to,OSHA,a,frequent,inspection,is:,-,ANSWER,Daily,to,monthly


According,to,OSHA,a,periodic,inspection,is:,-,ANSWER,Monthly,to,annually


Cranes,idle,for,more,than,six,months,must,have,inspections,performed:,-
,ANSWER,Frequent,and,periodic



Cranes,idle,for,less,than,six,months,must,have,inspections,performed:,-,ANSWER,Frequent


Cranes,lifting,personnel,platform,must,have,the,platform,and,rigging,inspected:,-
,ANSWER,Prior,to,each,shift



Crane,hooks,must,not,be,twisted,in,excess,of:,-,ANSWER,10,degrees

Reviews from verified buyers

Showing all reviews
8 months ago

4.0

1 reviews

5
0
4
1
3
0
2
0
1
0
Trustworthy reviews on Stuvia

All reviews are made by real Stuvia users after verified purchases.

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TargeterWings NURSING
View profile
Follow You need to be logged in order to follow users or courses
Sold
18
Member since
1 year
Number of followers
0
Documents
240
Last sold
2 weeks ago
YOU

I know how frustrating it can get with all those assignments mate. Nursing Being my main profession line, i have essential guides that are A graded, I am a very friendly person so don

4.5

4 reviews

5
2
4
2
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions