FDOT Asphalt Paving Level 2 Exam (2 Version) Questions & Answers with rationale) (Latest updated What makes up a quality asphalt mixture? - Answer- A quality asphalt mixture is determined by the constructability, if it conforms to Specifications, and if it satisfies functional requirements. CQC - Answer- contractor quality control Superpave - Answer- Asphalt mix design system since 1998 QCP - Answer- Quality control plan QCM - Answer- Quality control Manual QC - Answer- Quality Control (Contracting Testing and Inspection) VT - Answer- Verification Testing (FDOT or CEI Verification) CEI - Answer- Construction Engineering and Inspection RT - Answer- Resolution Testing (FDOT) IV - Answer- Independent Verification Testing IA - Answer- Independent Assurance Testing The decision-making authority on a job needs to be given to who? - Answer- Needs to be given to the level closet to the work as specified in the specifications. It ensure a quick handle on situations and issues. The governing order of project documents from high (1) to low (7) starts with the highest being - Answer- Special Provisions The governing order of project documents from high to low (2) - Answer- Technical Special Provisions The governing order of project documents from high to low (3) - Answer- Plans

Show more Read less
Institution
FDOT Asphalt Paving
Course
FDOT Asphalt Paving









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
FDOT Asphalt Paving
Course
FDOT Asphalt Paving

Document information

Uploaded on
November 4, 2024
Number of pages
7
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

  • fdot asphalt paving

Content preview

FDOT Asphalt Paving Level 2 Exam (2
Version) Questions & Answers with
rationale) (Latest updated
What makes up a quality asphalt mixture? - Answer- A quality asphalt mixture is
determined by the constructability, if it conforms to Specifications, and if it satisfies
functional requirements.

CQC - Answer- contractor quality control

Superpave - Answer- Asphalt mix design system since 1998

QCP - Answer- Quality control plan

QCM - Answer- Quality control Manual

QC - Answer- Quality Control (Contracting Testing and Inspection)

VT - Answer- Verification Testing (FDOT or CEI Verification)

CEI - Answer- Construction Engineering and Inspection

RT - Answer- Resolution Testing (FDOT)

IV - Answer- Independent Verification Testing

IA - Answer- Independent Assurance Testing

The decision-making authority on a job needs to be given to who? - Answer- Needs to
be given to the level closet to the work as specified in the specifications. It ensure a
quick handle on situations and issues.

The governing order of project documents from high (1) to low (7) starts with the highest
being - Answer- Special Provisions

The governing order of project documents from high to low (2) - Answer- Technical
Special Provisions

The governing order of project documents from high to low (3) - Answer- Plans

The governing order of project documents from high to low (4) - Answer- Road design,
structures, and traffic operations standards

, The governing order of project documents from high to low (5) - Answer- Developmental
Specifications

The governing order of project documents from high to low (6) - Answer- Supplemental
Specifications

The governing order of project documents from high to low (7) - Answer- Standard
Specifications

What are the key components in a pre-paving conferences? - Answer- Key Personnel
(Paving superintendent)
Contractor Input
Agency Input
QC Plan Review
Discuss more specific key topics or issues
Meeting Minutes
Action items (what to do in situations, who to call)

What are the key components in a pre-construction conferences? - Answer- Agency
Input (FDOT)
Contractor Input (Including the Prime)
Project Personnel (Upper - Middle management)
Testing
Safety
Utilities
Cities or Municipalities (HOA, school boards)
Suppliers

What causes the compactive effort increase? - Answer- Crushed aggregate content
Nominal maximum size
Hardness of the aggrergate
Angularity of aggregate
Less natural sand
High dust content mixes
Gradation of the mix greatly affects compaction
Superpave mixes

What kind of Performance Graded binders are there? - Answer- PG 67-22 (old AC-30)
PG 52-82
PG 58-22
PG 76-22 (PMA) Polymer modified asphalt
PG 76-22 (ARB) Asphalt rubber binder
PG 82-22 (PMA) polymer modified asphalt

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
ApassExams Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
29
Member since
2 year
Number of followers
10
Documents
1710
Last sold
4 months ago
Nursing Perfection Study Station

Just For You...Yes You....EXCELLENT HOMEWORK HELP AND TUTORING ,ALL KIND OF QUIZ AND EXAMS WITH GUARANTEE OF A Am an expert on major courses especially; psychology, Nursing, Human resource Management and Mathematics Assisting students with quality work is my first priority. I ensure scholarly standards in my documents and that's why I'm one of the BEST GOLD RATED TUTORS in STUVIA. I assure a GOOD GRADE if you will use my work

3.0

2 reviews

5
1
4
0
3
0
2
0
1
1

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions