Power Engineering 3B1 Chapter 9 Exam Questions And Answers 100% Pass All new boilers, and boilers which have been repaired on their pressure parts, require a ___________ to be performed upon them. a. acidizing b. de-scaling c. hydrostatic test d. refractory dry out e. soot blowing - answerc On small boilers, a hydrostatic test is done with: a. compressed nitrogen b. water pressure c. steam pressure d. compressed air e. acetic acid - answerb When a hydrostatic pressure test is done on a boiler, the pressure shall be under control at all times, so that the required test pressure is never exceeded by more than: a. 10% b. 6% c. 5% d. 4% ©THEBRIGHT EXAM SOLUTIONS 10/30/2024 11:32 PM e. 0% - answerc All traces of oil or grease must be removed from a boiler by boiling out with. a. a suitable acid b. hot water c. a suitable alkali d. a suitable solvent e. sodium sulphite and hydrazine - answerc After construction of the boiler setting, the refractories will contain a considerable amount of moisture. Referring to this situation, which of the following statements are correct? 1. The refractories should be dried out as fast as possible 2. The refractories should be dried slowly 3. If the refractories are dried too slowly, large cracks will appear 4. If the refractories are dried too quickly, the refractories will crack a. 1,3 b. 2,4 c. 1 d. 2 e. 3 - answerb An alkaline boil out is used on a boiler: a. When the boiler has had oil contamination b. Before overhauls c. After an acid clean d. Before returning the boiler to service after an overhaul e. after an acid clean - answera ©THEBRIGHT EXAM SOLUTIONS 10/30/2024 11:32 PM _____ storage is preferable for boilers that are out of service for an extended period of time or in locations where freezing temperatures. a. Dry b. Short c. Wet d. Long - answera Moisture absorbing material should be placed on trays inside the drums to absorb moisture from the _____. a. metal b. tubes c. air d. fuel - answerc Inert gas, such as nitrogen, is connected to the drum vent to maintain approximately ___ kPa. positive pressure. a. 100 b. 35 c. 325 d. 500 - answerb Wet storage is u

Show more Read less
Institution
Power Engineering
Course
Power Engineering









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Power Engineering
Course
Power Engineering

Document information

Uploaded on
November 3, 2024
Number of pages
15
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

©THEBRIGHT EXAM SOLUTIONS
10/30/2024 11:32 PM


Power Engineering 3B1 Chapter 9 Exam
Questions And Answers 100% Pass


All new boilers, and boilers which have been repaired on their pressure parts, require a
___________ to be performed upon them.
a. acidizing
b. de-scaling
c. hydrostatic test
d. refractory dry out

e. soot blowing - answer✔c
On small boilers, a hydrostatic test is done with:
a. compressed nitrogen
b. water pressure
c. steam pressure
d. compressed air

e. acetic acid - answer✔b
When a hydrostatic pressure test is done on a boiler, the pressure shall be under control at all
times, so that the required test pressure is never exceeded by more than:
a. 10%
b. 6%
c. 5%
d. 4%

, ©THEBRIGHT EXAM SOLUTIONS
10/30/2024 11:32 PM

e. 0% - answer✔c
All traces of oil or grease must be removed from a boiler by boiling out with.
a. a suitable acid
b. hot water
c. a suitable alkali
d. a suitable solvent

e. sodium sulphite and hydrazine - answer✔c
After construction of the boiler setting, the refractories will contain a considerable amount of
moisture. Referring to this situation, which of the following statements are correct?
1. The refractories should be dried out as fast as possible
2. The refractories should be dried slowly
3. If the refractories are dried too slowly, large cracks will appear
4. If the refractories are dried too quickly, the refractories will crack
a. 1,3
b. 2,4
c. 1
d. 2

e. 3 - answer✔b
An alkaline boil out is used on a boiler:
a. When the boiler has had oil contamination
b. Before overhauls
c. After an acid clean
d. Before returning the boiler to service after an overhaul

e. after an acid clean - answer✔a

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Thebright Florida State University
View profile
Follow You need to be logged in order to follow users or courses
Sold
178
Member since
1 year
Number of followers
6
Documents
12345
Last sold
2 days ago
Topscore Emporium.

On this page, you find verified, updated and accurate documents and package deals.

3.8

35 reviews

5
13
4
10
3
7
2
1
1
4

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions