Power Engineering 3B1 Chapter 11 Exam Questions And Answers 100% Pass Subsidence is accomplished by passing water through a basin or tank of such design that the velocity of the water is reduced to a point, to permit ___________. a. subsidence b. coagulation c. flocculation d. filtering - answerb __________ are chemicals, which cause the fine particles to gather together into a larger mass, which will settle out much more readily. a. Caustic b. Coagulants c. Acids d. Zeolite - answerb ___________ is the further increase in size and volume of the precipitating particles and is done by gentle agitation of the water. a. Subsidence b. Coagulation c. Flocculation d. Filtering - answerc The coagulant, when added to the water, will produce a spongy substance known as _____. a. mud ©THEBRIGHT EXAM SOLUTIONS 10/30/2024 11:32 PM b. floc c. sand d. waste - answerb A water _______ allows the coagulation and settling of suspended solids contained in water, to take place. a. softener b. exchanger c. clarifier d. filter - answerc The clarified water is drawn off through a submerged collector pipe at the ______ of the upflow zone. a. bottom b. top c. side d. middle - answerb External water treatment using continuous methods of subsidence allows: 1. Clarified water to be drawn continuously from the tank 2. Continuous removal of solids from the tank 3. Complete removal of turbidity 4. Removal of colloidal particles without coagulation a. 1,2,3 b. 1,3,4 c. 1,2,4 d. 2,3,4 e. 1,2,3,4 - answerc ©THEBRIGHT EXAM SOLUTIONS 10/30/2024 11:32 PM A ______ consists of a bed of porous material through which the water is passed, either by gravity or under pressure. a. softener b. exchanger c. clarifier d. filter - answerd When filtering water, which will be used for boiler feedwater, __________ is preferred as the use of sand may result in the water picking up silica, which could deposit as scale, in the boiler. a. resin b. gravel c. anthracite d. Zeolite - answerc Pressure gauges, are installed on the inlet and outlet lines and when the pressure difference between them reaches a certain value, usually from ___ to ___ kPa, it means that backwashing is required. a. 5,10 b. 35,55 c. 100 , 200 d. 1,10000 - answerb If filters are used alone, the

Show more Read less
Institution
Power Engineering
Course
Power Engineering









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Power Engineering
Course
Power Engineering

Document information

Uploaded on
November 3, 2024
Number of pages
12
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

©THEBRIGHT EXAM SOLUTIONS
10/30/2024 11:32 PM


Power Engineering 3B1 Chapter 11 Exam
Questions And Answers 100% Pass


Subsidence is accomplished by passing water through a basin or tank of such design that the
velocity of the water is reduced to a point, to permit ___________.
a. subsidence
b. coagulation
c. flocculation

d. filtering - answer✔b
__________ are chemicals, which cause the fine particles to gather together into a larger mass,
which will settle out much more readily.
a. Caustic
b. Coagulants
c. Acids

d. Zeolite - answer✔b
___________ is the further increase in size and volume of the precipitating particles and is done
by gentle agitation of the water.
a. Subsidence
b. Coagulation
c. Flocculation

d. Filtering - answer✔c
The coagulant, when added to the water, will produce a spongy substance known as _____.
a. mud

, ©THEBRIGHT EXAM SOLUTIONS
10/30/2024 11:32 PM

b. floc
c. sand

d. waste - answer✔b
A water _______ allows the coagulation and settling of suspended solids contained in water, to
take place.
a. softener
b. exchanger
c. clarifier

d. filter - answer✔c
The clarified water is drawn off through a submerged collector pipe at the ______ of the upflow
zone.
a. bottom
b. top
c. side

d. middle - answer✔b
External water treatment using continuous methods of subsidence allows:
1. Clarified water to be drawn continuously from the tank
2. Continuous removal of solids from the tank
3. Complete removal of turbidity
4. Removal of colloidal particles without coagulation
a. 1,2,3
b. 1,3,4
c. 1,2,4
d. 2,3,4

e. 1,2,3,4 - answer✔c

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Thebright Florida State University
View profile
Follow You need to be logged in order to follow users or courses
Sold
178
Member since
1 year
Number of followers
6
Documents
12345
Last sold
2 days ago
Topscore Emporium.

On this page, you find verified, updated and accurate documents and package deals.

3.8

35 reviews

5
13
4
10
3
7
2
1
1
4

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions