100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

Nicet Level 1 water-based systems Practice Exam Questions And Well Elaborated Solutions

Rating
-
Sold
-
Pages
5
Grade
A+
Uploaded on
30-10-2024
Written in
2024/2025

Nicet Level 1 water-based systems Practice Exam Questions And Well Elaborated Solutions During an inspection, which of the following would be identified as a sprinkler which shall be replaced? - answer -Corrosion What are the inspection requirements for hangers and seismic braces installed in concealed spaces? - answer -Periodic inspection is not required Gauges shall be replaced every _____ or tested every _____ by comparison with a calibrated gauge - answer -5 years/ 5 years Where air pressure supervision is connected to a constantly attended location gauges shall be inspected ______? - answer -Monthly Sprinklers installed in areas that are inaccessible for safety consideration, due to process operations ____ be ____ during each scheduled shutdown? - answer - Shall/ Inspected What type of valve is designed for the purpose of reducing downstream water pressure under both residual and static conditions - answer -Pressure reducing valve PIV and OS&Y shall be backed a __________ from the fully open position to prevent jamming. - answer -1/4 turn Gauges not accurate to within _______ percentage of the full scale shall be recalibrated or replaced? - answer -3 percent When there is a _________ reduction in full flow pressure, when compared to original acceptance test, the cause of the reduction shall be identified and corrected. - answer -10 Percent An informational sign shall be placed at the _______ supplying the antifreeze loop, dry system, pre action system, or auxiliary systems control valve. - answer - System Control Riser Information signs should indicate which of the following? - answer -Location if the area served by system, the presence and location of antifreeze or other auxiliary systems, the presence and location of heat tape Which of the following signs require a quarterly inspection to verify that it is securely attached to the sprinkler riser? - answer -Hydraulic Design Information sign Which of the following would be an acceptable material for the information sign to be made of? - answer -Rigid plastic/ Metal How often shall the system information sign be tested? - answer -Testing is not required for the information sign What is a purpose of a control valve - answer -Control Flow to water based fire protection system The gauge on the quick opening device shall indicate _____ as compared to the gauge on the system side of the dry pipe valve? - answer -the same pressure What type of test shall be provided when a valve is returned to service to determine that the valve is open? - answer -Valve status test What is a fire service main? - answer -A pipe and its appurtenances on private property/ Pipe between a source of water and the base of the system riser Name the system that utilizes a plate through which a passes a specific amount of foam concentrate at a specific pressure. - answer -Orifice Plate Proportioning Sprinklers shall be tested for sensitivity and functionality at ______ PSI - answer - 5 What specialized equipment is needed to test waterflow alarm devices on a wet pipe system? - answer -None Sprinklers subject to overspray accumulation shall be protected by using? - answer -A thin paper bag What type of testing requires the use of a refractometer? - answer -Antifreeze System What type of device is used to test flow rates? - answer -Pilot Gauge Identify what type of sprinkler is designed to be installed in such a way that the water stream is directed downward against the deflector? - answer -Pendent sprinkler A class 1 standpipe system is a system that provides ________ hose connections to water supply used by fire departments. - answer -2 1/2 in What type of precautions should shall take place prior to entering confined spaces such as tanks, valve pits, or trenches? - answer -Legally required All penetrations into the area of cold storage shall be inspected. If an ice obstruction is found during the inspection, what requirement shall be employed? - answer -Additional pipe shall be examined to ensure no ice blockage exists. Internal examination of sprinkler pipe shall be performed at what areas while conducting an obstruction investigation and prevention? - answer -Systems valve, riser, and cross main NFPA 25 chapter 15 outlines the procedure to follow for impairment of a water based system. Besides this code requirement other action shall be followed based on the impairment? - answer -Attachment of a tag Normally closed valves shall be secured by the means of a seal or , be ________ in accordance with the applicable NFPA standard. - answer -Electrically supervised What is the frequency for testing the hose connections for pressure reducing and relief valves? - answer -60 Months In systems where the sole water supply is through a backflow preventer and/ or pressure reducing valves, the main drain test of at least one system downstream of the device shall be conducted ________? - answer -Quarterly Hose connections should be inspected, tested, and maintained in accordance with NFPA 25 Chapter ______ and Chapter____? - answer -6,13 When is the proper time for the employee's to receive training on the company fall arrest system? - answer -Before using the fall arrest system What is the maximum allowed scissor lift speed? - answer -1 foot per second If an explosive actuated tool misfires, you should? - answer -Wait 30 seconds and then refire When using compressed air for cleaning, it should be rated at less than ______ PSI? - answer -30 What is the minimum width allowed for the ladder stairs? - answer -12 Inches Hearing protection is required when the noise level reaches 90 DBA for a duration of _________? - answer -8 hours How far above the point of support is a ladder required to extend when used to access the roof? - answer -3 Feet When are hard hats required on the job sites? - answer -When there is a potential for injury from falling objects

Show more Read less
Institution
Nicet Level 1 Water-based Systems
Course
Nicet Level 1 water-based systems









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Nicet Level 1 water-based systems
Course
Nicet Level 1 water-based systems

Document information

Uploaded on
October 30, 2024
Number of pages
5
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

Nicet Level 1 water-based systems Practice Exam
Questions And Well Elaborated Solutions
During an inspection, which of the following would be identified as a sprinkler
which shall be replaced? - answer -Corrosion

What are the inspection requirements for hangers and seismic braces installed in
concealed spaces? - answer -Periodic inspection is not required

Gauges shall be replaced every _____ or tested every _____ by comparison with a
calibrated gauge - answer -5 years/ 5 years

Where air pressure supervision is connected to a constantly attended location
gauges shall be inspected ______? - answer -Monthly

Sprinklers installed in areas that are inaccessible for safety consideration, due to
process operations ____ be ____ during each scheduled shutdown? - answer -
Shall/ Inspected

What type of valve is designed for the purpose of reducing downstream water
pressure under both residual and static conditions - answer -Pressure reducing
valve

PIV and OS&Y shall be backed a __________ from the fully open position to
prevent jamming. - answer -1/4 turn

Gauges not accurate to within _______ percentage of the full scale shall be
recalibrated or replaced? - answer -3 percent

When there is a _________ reduction in full flow pressure, when compared to
original acceptance test, the cause of the reduction shall be identified and
corrected. - answer -10 Percent

, An informational sign shall be placed at the _______ supplying the antifreeze
loop, dry system, pre action system, or auxiliary systems control valve. - answer -
System Control Riser

Information signs should indicate which of the following? - answer -Location if
the area served by system, the presence and location of antifreeze or other auxiliary
systems, the presence and location of heat tape

Which of the following signs require a quarterly inspection to verify that it is
securely attached to the sprinkler riser? - answer -Hydraulic Design Information
sign

Which of the following would be an acceptable material for the information sign
to be made of? - answer -Rigid plastic/ Metal

How often shall the system information sign be tested? - answer -Testing is not
required for the information sign
What is a purpose of a control valve - answer -Control Flow to water based fire
protection system

The gauge on the quick opening device shall indicate _____ as compared to the
gauge on the system side of the dry pipe valve? - answer -the same pressure

What type of test shall be provided when a valve is returned to service to
determine that the valve is open? - answer -Valve status test

What is a fire service main? - answer -A pipe and its appurtenances on private
property/ Pipe between a source of water and the base of the system riser

Name the system that utilizes a plate through which a passes a specific amount of
foam concentrate at a specific pressure. - answer -Orifice Plate Proportioning


Sprinklers shall be tested for sensitivity and functionality at ______ PSI - answer -
5

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TheExamMaestro Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
120
Member since
1 year
Number of followers
5
Documents
3136
Last sold
8 hours ago
Exam Vault

Exam Vault is your trusted destination for high-quality exam materials and study resources. We provide a wide rage of tests and prep guides to help you succeed, whether you're preparing for academic exams, certifications, or professional assessments

3.8

13 reviews

5
7
4
2
3
1
2
0
1
3

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions