The National Pollutant Discharge Elimination System, or NPDES, is the
answer.
Answer to the Clean Water Act In 1972, the EPA administered
Answer to the Water Quality Act In 1987, the CWA was amended to control
stormwater emissions under the NPDES program.
Pollution from Point Sources: A ANSWER emissions from easily recognized
sources, such as treatment facilities
The answer to the nonpoint source solution Runoff from agricultural or urban
regions
South Carolina's NPDES: ANSWER A delegated state is SC. SCDHEC is
responsible for administering regulations.
ANSWER Construction General Permit, CGP Phase II, went into force on
September 1, 2006.
Coverage of NPDES Permits: ANSWER: 1 or more acres of disturbed land. In
the SC Coastal Zone, within half a mile of a receiving body of water
ANSWER Notice of Intent (NOI)
OCRM CGP Requirements: ANSWER Coverage is provided seven days
following DHEC's receipt of the NOI
SCDOT CGP Requirements: ANSWER Coverage is provided 10 days
following DHEC's receipt of the NOI
, CGP Requirements for DHEC: 20 days after DHEC receives the completed
NOI, ANSWER Coverage is given.
Before submitting a NOI, the ANSWER Storm Water Pollution Prevention Plan
(SWPPP) was finished and prepared in compliance with Phase II CGP.
Requirements for SWPPP-ANSWER Operator identification
Construction sequence Locations of all BMPs Locations of all state surface
waters
CGP Submission: ANSWER It must adhere to all other permits.
Federal reporting obligations must be met.
After construction is finished, file NOT.
Keep records for three years.
Answer to the pre-construction meeting Ten or more acres
Make sure all co-permittees understand SWPPP.
The preparer and contractors who are not co-permittees need to be present.
ANSWER for Contractor Certification Co-permittees attest that they attended a
Pre-Con meeting and are in charge of overseeing the SWPPP.
All contractors who are not co-permittees are required to attend a Pre-Con
meeting and attest to their accountability to DHEC.
Qualifications for EPSC Inspectors: ANSWER: Those who have completed a
course approved by DHEC.
Inspection Frequency: ANSWER (A) At least once every seven days, or (B) At
least once every fourteen days and within twenty-four hours of the conclusion
of a storm event, if the site is temporarily stabilized; or (C) Once a month.
Locations of Inspections: ANSWER Every location affected by construction
Locations where materials are stored that are subject to precipitation
Structures for controlling sedimentation and erosion in SWPPP
Every discharge site
Locations downstream that are nearby
Construction entrances
answer.
Answer to the Clean Water Act In 1972, the EPA administered
Answer to the Water Quality Act In 1987, the CWA was amended to control
stormwater emissions under the NPDES program.
Pollution from Point Sources: A ANSWER emissions from easily recognized
sources, such as treatment facilities
The answer to the nonpoint source solution Runoff from agricultural or urban
regions
South Carolina's NPDES: ANSWER A delegated state is SC. SCDHEC is
responsible for administering regulations.
ANSWER Construction General Permit, CGP Phase II, went into force on
September 1, 2006.
Coverage of NPDES Permits: ANSWER: 1 or more acres of disturbed land. In
the SC Coastal Zone, within half a mile of a receiving body of water
ANSWER Notice of Intent (NOI)
OCRM CGP Requirements: ANSWER Coverage is provided seven days
following DHEC's receipt of the NOI
SCDOT CGP Requirements: ANSWER Coverage is provided 10 days
following DHEC's receipt of the NOI
, CGP Requirements for DHEC: 20 days after DHEC receives the completed
NOI, ANSWER Coverage is given.
Before submitting a NOI, the ANSWER Storm Water Pollution Prevention Plan
(SWPPP) was finished and prepared in compliance with Phase II CGP.
Requirements for SWPPP-ANSWER Operator identification
Construction sequence Locations of all BMPs Locations of all state surface
waters
CGP Submission: ANSWER It must adhere to all other permits.
Federal reporting obligations must be met.
After construction is finished, file NOT.
Keep records for three years.
Answer to the pre-construction meeting Ten or more acres
Make sure all co-permittees understand SWPPP.
The preparer and contractors who are not co-permittees need to be present.
ANSWER for Contractor Certification Co-permittees attest that they attended a
Pre-Con meeting and are in charge of overseeing the SWPPP.
All contractors who are not co-permittees are required to attend a Pre-Con
meeting and attest to their accountability to DHEC.
Qualifications for EPSC Inspectors: ANSWER: Those who have completed a
course approved by DHEC.
Inspection Frequency: ANSWER (A) At least once every seven days, or (B) At
least once every fourteen days and within twenty-four hours of the conclusion
of a storm event, if the site is temporarily stabilized; or (C) Once a month.
Locations of Inspections: ANSWER Every location affected by construction
Locations where materials are stored that are subject to precipitation
Structures for controlling sedimentation and erosion in SWPPP
Every discharge site
Locations downstream that are nearby
Construction entrances