100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

PCC Level 1 Questions and Answers

Rating
-
Sold
-
Pages
7
Grade
A+
Uploaded on
27-10-2024
Written in
2024/2025

PCC Level 1 Questions and Answers The end of the temperature sensing portion of the temperature measuring device is submerged a minimum of ___ into the freshly mixed concrete. 3 inches The temperature measuring device shall be capable of accurately measuring the temperature of freshly mixed concrete to _____ throughout a range of _____ . 1 °F , 30-120°F Previous Play Next Rewind 10 seconds Move forward 10 seconds Unmute 0:00 / 0:15 Full screen Brainpower Read More The temperature measuring device shall be verified ______, or whenever there is a question of ______. annually, accuracy The temperature of concrete may be measured in a wheelbarrow. T or F? T The temperature of concrete may be measured in a wall form. T or F? T A composite sample of concrete is required even if the only purpose for obtaining the sample is to determine temperature. T or F? F What must be done to the sample container prior to sampling the concrete? Dampened with water What must be done to the concrete surrounding the temperature measuring device after the device is submerged in fresh concrete? Gently press the concrete around the temperature measuring device at the surface of the concrete. How long must the temperature measuring device remain in the freshly mixed concrete? 2-5 minutes After the temperature of the concrete is read, what is then required? Reporting of temperature The temperature of the concrete is reported to the nearest _____. 1°F According to Test Method C1064, what is one reason to take the concrete temperature? Verify conformance to a specified requirement for concrete temperature. A maximum temperature of freshly mixed concrete is specified in Test Method C1064. T or F? F The sample of concrete used for temperature determination must be rodded 25 times. T or F? F Sampling by this practice covers procedures for obtaining representative samples, on which tests are to be performed to determine ____ with quality requirements of the specification under which the concrete is furnished. Compliance This practice covers sampling from five types of equipment which are... Stationary mixers, paving mixers, revolving drum mixers, continuous mixers, and open top mixers. The elapsed time between obtaining the first and final portions of a composite sample shall not exceed ___. 15 minutes Portions of a composite sample shall be thoroughly remixed before beginning tests on the sample. T or F? T Start the tests for slump, temperature, and air content within how many minutes after obtaining the final portion of the composite sample? 5 minutes Start molding specimens for strength tests within how many minutes after fabricating the composite sample? 15 minutes The concrete sample must be protected from contamination and _____. Rapid evaporation The minimum size sample for making strength test specimens is _____. 1 cubic foot When sampling from a stationary mixer, the batch must be sampled at _____ or more regularly spaced intervals during discharge of the middle portion of the batch 2 When sampling from a paving mixer, obtain samples from at least ____ different portions of the pile and combine them into one composite sample for testing purposes. 5 When sampling from a revolving drum truck mixer, concrete must be sampled at a minimum of _____ regularly spaced intervals during discharge of the middle portion of this batch. 2 Concrete samples from a truck mixer must be obtained before any water or admixtures are added to the mixer at the jobsite. T or F? F The composite sample from a truck mixer must be obtained form the ____ portion of the batch. Middle When the concrete contains aggregate larger than that permitted for a particular test method, the sample of concrete must be ______ before making the test. Wet sieved The slump test is applicable to plastic concrete with a maximum aggregate size of ____. 1.5" When the concrete contains aggregate larger than allowed for the slump test, the large aggregate must be ____. Removed by wet sieving the sample The mold for making the slump test is in the shape of ____. The frustum of a cone The height of a slump mold is _____. 12 in The interior surface of the slump mold is allowed to have minor irregularities. T or F? F The sample of concrete for use in making the slump test is in accordance with practice ____. C172 The slump mold should be in dry condition prior to slump test. T or F? F The surface on which the slump mold will be placed must be __________. Flat, moist, nonabsorbent, and rigid The slump mold is filled in _____ layers. 3 layers Each layer should fill approximately _____ the volume of the mold. 1/3 The approximate concrete depth (in vert distance) after placing the first layer is ____. 2-5/8" Rod each layer ___ times uniformly over the cross section with the rounded end of the rod. 25 How deep should the tamping rod penetrate into each layer? Rod each layer throughout its depth; on the second and final layers, the rod should penetrate into the previous layer approximately 1 in. [25 mm] When rodding the bottom layer, the tamping rod must be _____ to uniformly distribute the strokes. Slightly inclined What must be done if the concrete drips below the top of the slump mold while the top layer is being rodded? Add additional concrete to keep and excess of concrete above the top of the mold at all times. Prior to lifting the mold, concrete must be removed from _____. The area surrounding the base of the mold After the final rodding, the sides of the slump mold should be tapped lightly with the tamping rod. T or F? F When raising the slump mold, it should not be rotated or twisted, True or False? T How much time is allowed for lifting the slump mold? 3-7 seconds The measurement for slump is made from the tip of the mold to what point of the concrete specimen? Displaced original center of the top surface of the specimen The slump of the concrete is measured and reported to the nearest ____. 1/4 inch How much time is allowed to conduct the slump test from beginning to completion? 2.5 minutes For use in the slump test, the tampering and or both ends must be hemispherical The outside diameter or side dimension of the vibrating element must be _____ - _____. 0.75-1.50" What is the minimum thickness of a metal strike off plate? 1/4 inch What is the minimum thickness for a glass or acrylic strike off plate? 1/2 inch What is the specified weight of the mallet used on measures that are 0.5 cubic foot or smaller? 1.25 +- 0.50 lb Measures other than air meter bowls used for this test must conform to ASTM _____. C29 Air meter bowls used for this test must conform to ASTM _____ and be calibrated for volumee according to ASTM _____. C231 , C29 The concrete sample must be obtained in accodance with what ASTM method? C172 Density= (accuracy?) Net weight of concrete (lb)/Volume of concrete (ft^3) tenth of lb/cubic foot Concrete yield (in what units?)= Total mass of materials batched from ticket/(Measured density of concrete lb/ft3 • 27 ft3/yd3) yd^3 Relative yield (make sure you either meet or exceed spec)= Actual yield/design yield greater than 1 means you met/exceeded spec, less than one means you did not meet it Measured air content= (theoretical denity-actual density)/theoretical density • 100% or (big#-little#)/big#•100

Show more Read less
Institution
Pcc
Course
Pcc









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Pcc
Course
Pcc

Document information

Uploaded on
October 27, 2024
Number of pages
7
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

PCC Level 1 Questions and Answers
The end of the temperature sensing portion of the temperature measuring device is
submerged a minimum of ___ into the freshly mixed concrete. - answer 3 inches

The temperature measuring device shall be capable of accurately measuring the
temperature of freshly mixed concrete to _____ throughout a range of _____ . - answer
1 °F , 30-120°F

The temperature measuring device shall be verified ______, or whenever there is a
question of ______. - answer annually, accuracy

The temperature of concrete may be measured in a wheelbarrow. T or F? - answer T

The temperature of concrete may be measured in a wall form. T or F? - answer T

A composite sample of concrete is required even if the only purpose for obtaining the
sample is to determine temperature. T or F? - answer F

What must be done to the sample container prior to sampling the concrete? - answer
Dampened with water

What must be done to the concrete surrounding the temperature measuring device after
the device is submerged in fresh concrete? - answer Gently press the concrete
around the temperature measuring device at the surface of the concrete.

How long must the temperature measuring device remain in the freshly mixed concrete?
- answer 2-5 minutes

After the temperature of the concrete is read, what is then required? - answer
Reporting of temperature

The temperature of the concrete is reported to the nearest _____. - answer 1°F

According to Test Method C1064, what is one reason to take the concrete temperature?
- answer Verify conformance to a specified requirement for concrete temperature.

A maximum temperature of freshly mixed concrete is specified in Test Method C1064. T
or F? - answer F

The sample of concrete used for temperature determination must be rodded 25 times. T
or F? - answer F

, Sampling by this practice covers procedures for obtaining representative samples, on
which tests are to be performed to determine ____ with quality requirements of the
specification under which the concrete is furnished. - answer Compliance

This practice covers sampling from five types of equipment which are... - answer
Stationary mixers, paving mixers, revolving drum mixers, continuous mixers, and open
top mixers.

The elapsed time between obtaining the first and final portions of a composite sample
shall not exceed ___. - answer 15 minutes

Portions of a composite sample shall be thoroughly remixed before beginning tests on
the sample. T or F? - answer T

Start the tests for slump, temperature, and air content within how many minutes after
obtaining the final portion of the composite sample? - answer 5 minutes

Start molding specimens for strength tests within how many minutes after fabricating the
composite sample? - answer 15 minutes

The concrete sample must be protected from contamination and _____. - answer
Rapid evaporation

The minimum size sample for making strength test specimens is _____. - answer 1
cubic foot

When sampling from a stationary mixer, the batch must be sampled at _____ or more
regularly spaced intervals during discharge of the middle portion of the batch - answer
2

When sampling from a paving mixer, obtain samples from at least ____ different
portions of the pile and combine them into one composite sample for testing purposes. -
answer 5

When sampling from a revolving drum truck mixer, concrete must be sampled at a
minimum of _____ regularly spaced intervals during discharge of the middle portion of
this batch. - answer 2

Concrete samples from a truck mixer must be obtained before any water or admixtures
are added to the mixer at the jobsite. T or F? - answer F

The composite sample from a truck mixer must be obtained form the ____ portion of the
batch. - answer Middle

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Pogba119 Harvard University
View profile
Follow You need to be logged in order to follow users or courses
Sold
48
Member since
1 year
Number of followers
2
Documents
4870
Last sold
1 month ago
NURSING TEST

BEST EDUCATIONAL RESOURCES FOR STUDENTS

3.9

9 reviews

5
4
4
2
3
2
2
0
1
1

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions