Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 14 pages
Exam (elaborations)

Stormwater EPA Exam with Complete Questions and Answers (Graded A)

Document preview thumbnail
Preview 2 out of 14 pages

Stormwater EPA Exam with Complete Questions and Answers (Graded A)Stormwater EPA Exam with Complete Questions and Answers (Graded A)Stormwater EPA Exam with Complete Questions and Answers (Graded A)Stormwater EPA Exam with Complete Questions and Answers (Graded A) What Generates Stormwater discharge? - ANSWER-Discharge is generated by runoff from land and impervious areas such as paved streets, parking lots, and building rooftops during rainfall and snow events that often contain pollutants in quantities that could adversely affect water quality. Types of Stormwater Sampling - ANSWER-Catch Basin Sampling, Ditch Sampling, Sheet Flow Sampling Where to sample - ANSWER-Pipes (catch basin or outfall), Open Ditch or a sheet flow. Stormwater discharge is representative of your wholes sites pollution. Sampling sites

Content preview

Stormwater EPA Exam with Complete
Questions and Answers (Graded A)

What Generates Stormwater discharge? - ANSWER-Discharge is generated by runoff
from land and impervious areas such as paved streets, parking lots, and building
rooftops during rainfall and snow events that often contain pollutants in quantities that
could adversely affect water quality.


Types of Stormwater Sampling - ANSWER-Catch Basin Sampling, Ditch Sampling,
Sheet Flow Sampling


Where to sample - ANSWER-Pipes (catch basin or outfall), Open Ditch or a sheet flow.
Stormwater discharge is representative of your wholes sites pollution. Sampling sites
must be noted on permit site map


Tools needed for sampling - ANSWER-Bottle, Gloves, IceBox, pen, pH paper, and an
extension rod.


Things you are sampling for - ANSWER-Turbidity(cloudiness), pH, Total Zn, Total
Copper, and Oil Sheen


What pollutants usually sampled for - ANSWER-Stormwater permits require the
development of minimum control measures called what?: MS4's for stormwater permits
and BMPs for industrial stormwater permits


How does stormwater effect construction sites - ANSWER-Stormwater flows over
construction sites, picking up pollutants that can then harm or kill fish/wildlife

, NPDES Stormwater Program requires sites of what size sites to obtain authorization to
discharge stormwater? - ANSWER-One Acre or larger


What is the focus of the NPDES Stormwater Permits? - ANSWER-Stormwater Pollution
Prevention Plans


EPA Construction General Permit (CGP) - ANSWER-Outlines a set of provisions that
construction operators must follow to comply with the requirements of the NPDES
stormwater regulations.


In California who issues NPDES permits for discharges into federal ocean water? -
ANSWER-EPA


In California what entity handles permits for discharges into non-federal waters? -
ANSWER-CalEPA


Timetable to report instances of noncompliance for CGP? - ANSWER-Orally within 24
hours, written within 5 days


What must a written submission of noncompliance contain? - ANSWER-Description of
the noncompliance and its cause, the exact dates and times of noncompliance, and if
the non compliance has been corrected.


What are the basic requirements of a CGP - ANSWER-1) Read entire CGP, 2) Develop
a Stormwater Pollution Prevention Plan (SWPPP), 3) Complete and submit a Notice of
Intent (NOI), 4) Install and maintain erosion and sediment controls throughout the entire
construction project, 5) Implement pollution prevention controls, 6) Conduct inspections
on the site based on established timeframe, 7) Take Corrective action to address any
issue with your stormwater controls or discharges, 8) Keep SWPPP up to date, 9)
Comply with any state, requirements, 10) Keep a copy of permit on site, and 11) Submit

Document information

Uploaded on
October 24, 2024
Number of pages
14
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$15.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
NursingTutor1
3.9
(459)
Sold
1698
Followers
1073
Items
18441
Last sold
1 week ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions