100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

SOS NERC PREP – RELIABILITY Latest Exam (QUESTIONS WITH VERIFIED ANSWERS) A+ GRADED

Rating
-
Sold
-
Pages
88
Grade
A+
Uploaded on
23-10-2024
Written in
2024/2025

SOS NERC PREP – RELIABILITY Latest Exam (QUESTIONS WITH VERIFIED ANSWERS) A+ GRADED

Institution
SOS NERC PREP – RELIABILITY
Course
SOS NERC PREP – RELIABILITY











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
SOS NERC PREP – RELIABILITY
Course
SOS NERC PREP – RELIABILITY

Document information

Uploaded on
October 23, 2024
Number of pages
88
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

SCORE MORE




SOS NERC PREP – RELIABILITY Latest Exam
(QUESTIONS WITH VERIFIED ANSWERS) A+
GRADED

The Reliability Coordinator just informed you of a slow time error correction which will begin at the top
of the next hour. Your EMS system will not let you change your scheduled frequency. Your Frequency
Bias Setting is -100 MW/.1Hz. What action should you take?



A) Increase Net Interchange Schedule by 20 MWs.



B) Inform the Reliability Coordinator that you cannot participate in the time error correction.



C) Decrease Net Interchange Schedule by 20 MWs.



D) Increase Net Interchange Schedule by 10 MWs.

A) Increase Net Interchange Schedule by 20 MWs.




A Balancing Authority has a sudden loss of a large block of load in its area. This loss will be seen
instantaneously in the change of which of the following values?



1. Actual Net Interchange

2. Scheduled Frequency

3. Scheduled Net Interchange

4. Area Control Error

,SCORE MORE


A) 4 only

B) 1 & 3

C) 1 & 4

D) 3 & 4

C) 1 & 4




Metered Data included in the calculation of ACE are: dynamic schedules, pseudo ties, actual frequency,
and all __________.



A) Tie lines readings

B) Generators output

C) Scheduled frequency indications

D) Transformer load

A) Tie lines readings




Balancing Authority A is currently reading a system frequency of 60.00 Hz. Its Net Actual Interchange is
+100 MW and its Net Scheduled Interchange is +200 MW. If Balancing Authority A's frequency bias
setting is 100 MW/0.1 Hz, what is ACE?



A) -100

B) 0

C) 10

D) 100

A) -100

,SCORE MORE


A Balancing Authority has a Net Interchange Schedule of -250 MWs from 1200 to 1600 on a summer
day. The Net Interchange Actual for those same hours respectively were -230 MW, -275 MW, -250 MW
and -270 MW. What was the Balancing Authority's Inadvertent Interchange for the 4-hour period?



A) 6 MWs out

B) 25 MWs in

C) 25 MWs out

D) 6 MWs in

B) 25 MWs in




For the ACE equation to work properly, dynamic schedules, pseudo ties, frequency, and all
________________ must be metered.



A) Generation

B) Communications

C) Transformers

D) Tie lines

D) Tie lines




If the frequency bias setting is set to a less negative value than the frequency response of a Balancing
Authority and a frequency increase is caused by a sudden loss of load in an external balancing area,
what will be the result?



A) The ACE will be zero and will take no AGC action



B) The ACE will be a negative value and AGC will increase generation



C) The ACE will be a positive value and AGC will lower generation

, SCORE MORE




D)This will not affect the ACE

B) The ACE will be a negative value and AGC will increase generation




If the frequency bias setting is less negative than the frequency response of a Balancing Authority and a
frequency decline is caused by a sudden loss of generation in an external balancing area, what will be
the result?



A) The ACE will be a negative value and AGC will increase generation.



B) This will not affect the ACE.



C) The ACE will be a positive value and AGC will lower generation.



D) The ACE will be zero and will take no AGC action.

C) The ACE will be a positive value and AGC will lower generation.




It is the responsibility of which entity/entities to develop, maintain, and implement load shedding plans?



A) Transmission Operators and Balancing Authorities



B) Reliability Coordinator



C) Load Serving Entities



D) Balancing Authority

A) Transmission Operators and Balancing Authorities

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TOPMARKSOLUTIONS Boston College
View profile
Follow You need to be logged in order to follow users or courses
Sold
155
Member since
3 year
Number of followers
97
Documents
1031
Last sold
1 week ago
TOPMARKSOLUTIONS

I TOPMARKSOLUTIONS have done research wide and far to make sure that I have provided you with the best and legitimate study resources. This resources include ;FINAL EXAMS, MIDTERM EXAMS, QUIZS, WEEKLY BASED KNOWLEDGE CHECKS, TESTBANKS ,ASSIGNMENTS & HOMEWORKS. I deal majorly in NURSING, MATHEMATICS ,BIOS & BUSSINESS

4.7

261 reviews

5
199
4
50
3
5
2
1
1
6

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions