Corrosion Specialist - ACCURATE ANSWERS✔✔ designs and
certifies cathodic protection system
Secondary containment shall be constructed to contain at least the
following volumes: - ACCURATE ANSWERS✔✔ A. 100% of usable
capacity of primary where there is only one primary is within the
secondary
B. 150% of the largest container if there are multiple primary containers
in a single secondary
Cathodic protection tester will test cathodic protection system within __
months of installation and every __ years thereafter - ACCURATE
ANSWERS✔✔ 6 months
3 years
Spill container shall meet the following requirements: - ACCURATE
ANSWERS✔✔ A. If made of metal, exterior wall shall be protected
from galvanic corrosion
B. Shall have minimum capacity of 5 gallons (19 L)
C. Shall have drain valve which allows drainage of the collected spill
into the primary container or provide means to keep spill cont empty
, Overfill prevention shall alert transfer operator when tank is __% full -
ACCURATE ANSWERS✔✔ 90%
Flapper Valves shall provide positive shut off when tank is filled to no
more than __% capacity - ACCURATE ANSWERS✔✔ 95%
Primary pressurized piping shall be tested for tightness hydrostatically at
__% of design operating pressure - ACCURATE ANSWERS✔✔ 150%
Date that all UST systems must have Line Leak Detector installed -
ACCURATE ANSWERS✔✔ November 9,2004
Secondary containment testing shall be done upon ____, __months, and
every ___ months or ____ years thereafter - ACCURATE
ANSWERS✔✔ Installation
6 months
36 months or 3 years
Owners/ops shall submit SCT results to local agency within ____ days
of completion - ACCURATE ANSWERS✔✔ 30 days
All monitoring equipment shall be tested, calibrated, operated,
maintained, and certified every ____ months. - ACCURATE
ANSWERS✔✔ 12 months