S-12 SPRINKLER PRACTICE TEST
QUESTIONS AND ANSWERS
Personally fSupervised f- f✔✔Inspection, ftesting, fservicing, fand fother fmaintenance fof
fsprinkler fsystems fmust fbe f--
whenever fthe fbuilding/structure fis faltered f- f✔✔When fshould frequired ffire fprotection
fsystems fbe fextended for faltered fto fmaintain fand fcontinue fprotection?
6 f- f✔✔How fmany fextra fsprinkler fheads fshould fbe fkept fon fthe fpremises ffor fprompt
freplacement fof ffused for fdamaged fsprinklers?
Any fheads fwhich fhave fopened for fbeen fdamaged f- f✔✔Which ftypes fof fsprinkler
fheads frequire freplacement?
3 fyears f- f✔✔A fdetailed frecord fof finspections, ftests, fand fmaintenance fshould fbe fkept
ffor fat fleast f--
Hydrostatic fPressure fTest f- f✔✔To fdemonstrate fsuitability ffor fFire fDept. fuse,
fconnections fto fsprinkler fsystems fshall fbe fsubject fto fa f---
Master fFire fSuppression fPiping fContractor fin fthe fpresence fof fa fFire fDept.
fRepresentative f- f✔✔A fhydrostatic fpressure ftest fshall fbe farranged fby fthe f--.
The fbuilding fowner for fowner's frepresentative f- f✔✔Who fis fresponsible ffor fhiring fa
fMaster fFire fSuppression fPiping fContractor?
To fmaintain fthe fsprinkler fsystem f& fDetermine fthe fqualifications/competencies fof fthe
fCoF fHolder fwho fperforms fthe finspection, ftesting, fand fmaintenance fof fthe fsystem. f-
f✔✔What fare fthe fowner's fresponsibilities?
Maintains frecords fof fall fsystem finspections, ftests, fservicing, fand fother fmaintenance
ffor fthe fOOS fprotection fsystem. f- f✔✔What fdoes fthe fImpairment fCoordinator fdo?
The fbuilding fowner fshall fassign fan fimpairment fcoordinator fwhen fa ffire fprotection
fsystem fis fOOS f- f✔✔Who fassigns fan fImpairment fCoordinator?
When fa ffire fprotection fsystem fis fscheduled fto fbe fplaced fout fof fservice ffor finspection,
ftesting, fetc. f& fnot faffecting fmore fthan f1 ffloor f- f✔✔Planned fRemoval fFrom fService
, The fCoF fHolder f& fImpairment fCoordinator fshall fbe fmade faware fof fand fauthorize
fplacing fthe fsystem fOOS f- f✔✔Who fauthorizes fa fPlanned fRemoval fFrom fService?
Continuously fpatrol fthe fout fof fservice farea, fBe fprovided fwith fan fapproved fmeans fof
fnotification, fImmediately freport ffire, f& fBe ftrained fin fuse fof ffire fextinguishers f-
f✔✔When fa fFire fProtection fSystem fif fOOS, fFire fWatch fpersonnel fmust f--
Sprinkler for fFire fAlarm fsystem fis for fwill fbe fOOS fon fmore fthan fone ffloor, fThe fsystem
fneeds fto fbe fout fof fservice flonger fthan f8 fhours, f& fOne for fmore ffire fprotection
fsystems fin fthe farea fwill falso fbe fout fof fservice fat fthe fsame ftime. f- f✔✔Notification fof
fOOS fconditions fshall fbe fmade finto fFire fDept. fin fthe ffollowing fcases
Report fthe fdefect fto fthe fowner. fIf fit's fnot frepaired fwithin f30 fdays fit fshall fbe fdeemed
fan fImpairment fand freported fin fwriting fto fthe fFire fDept. f- f✔✔What fshould fa fCoF
fHolder fdo fif fthey fobserve fa fminor fdefect fnot fpresenting fa fserious fsafety fhazard?
Fire fDept. fconnections, fSystem fcontrol fvalves, f& fFire fcommand fcenter for fa fvisible
flocation fin fthe fbuilding flobby f- f✔✔OOS fsystems fshall fbe fidentified fby fplacing fa ftag
fat feach fof fthe ffollowing flocations:
Tags fare fplaced fto findicate fwhich fsystem for fpart fthereof fis fout fof fservice f-
f✔✔Impairment fCoordinators fof fbuilding fowners fshall fensure
A ftag findicates fa fsystem,or fportion, fis fOOS. fTags fshall fbe fplaced fat fthe fmain fcontrol
fvalve fand fany fclosed fsectional fvalves fserving fareas faffected f- f✔✔Tag fRequirement
The farea faffected, fDescription fof fcondition, fOccupancy fClassification, fCoF f#, fand
fEstimated ftime funtil fsystem fis foperational f- f✔✔What fis findicated fon feach ftag?
Shall fbe fposted fon fthe ftag findicating fthe fstatic fand fflow fpressures fbefore fand fafter
fthe fsystem fwas fplaced fOOS f- f✔✔Drain fTest fResults
Placed fon fthe fmain fcontrol fvalve fif fno fimpairment fis ffound fin fthe fentire fsystem f-
f✔✔Green fTag
A fsystem fis fFully fOOS f- f✔✔What fdoes fa fWhite fDisc findicate?
Placed fat fmain fcontrol fvalve f& fIndicates fthe fcompany fname, fdate fof fremoval ffrom
fservice,and fanticipated freturn fto fservice fdate f- f✔✔Red fTag f- fFully fOut fof fService
fSystem:
A fsystem fis fPartially fOOS f- f✔✔What fdoes fa fBlue fDisc findicate?
Placed fat fmain fcontrol fvalve fand fany fclosed fsectional fvalves f& fIndicates fthe
fcompany fname, fdate fof fremoval ffrom fservice, fand fanticipated freturn fto fservice fdate
f- f✔✔Red fTag f- fPartially fOut fof fService fSystem:
QUESTIONS AND ANSWERS
Personally fSupervised f- f✔✔Inspection, ftesting, fservicing, fand fother fmaintenance fof
fsprinkler fsystems fmust fbe f--
whenever fthe fbuilding/structure fis faltered f- f✔✔When fshould frequired ffire fprotection
fsystems fbe fextended for faltered fto fmaintain fand fcontinue fprotection?
6 f- f✔✔How fmany fextra fsprinkler fheads fshould fbe fkept fon fthe fpremises ffor fprompt
freplacement fof ffused for fdamaged fsprinklers?
Any fheads fwhich fhave fopened for fbeen fdamaged f- f✔✔Which ftypes fof fsprinkler
fheads frequire freplacement?
3 fyears f- f✔✔A fdetailed frecord fof finspections, ftests, fand fmaintenance fshould fbe fkept
ffor fat fleast f--
Hydrostatic fPressure fTest f- f✔✔To fdemonstrate fsuitability ffor fFire fDept. fuse,
fconnections fto fsprinkler fsystems fshall fbe fsubject fto fa f---
Master fFire fSuppression fPiping fContractor fin fthe fpresence fof fa fFire fDept.
fRepresentative f- f✔✔A fhydrostatic fpressure ftest fshall fbe farranged fby fthe f--.
The fbuilding fowner for fowner's frepresentative f- f✔✔Who fis fresponsible ffor fhiring fa
fMaster fFire fSuppression fPiping fContractor?
To fmaintain fthe fsprinkler fsystem f& fDetermine fthe fqualifications/competencies fof fthe
fCoF fHolder fwho fperforms fthe finspection, ftesting, fand fmaintenance fof fthe fsystem. f-
f✔✔What fare fthe fowner's fresponsibilities?
Maintains frecords fof fall fsystem finspections, ftests, fservicing, fand fother fmaintenance
ffor fthe fOOS fprotection fsystem. f- f✔✔What fdoes fthe fImpairment fCoordinator fdo?
The fbuilding fowner fshall fassign fan fimpairment fcoordinator fwhen fa ffire fprotection
fsystem fis fOOS f- f✔✔Who fassigns fan fImpairment fCoordinator?
When fa ffire fprotection fsystem fis fscheduled fto fbe fplaced fout fof fservice ffor finspection,
ftesting, fetc. f& fnot faffecting fmore fthan f1 ffloor f- f✔✔Planned fRemoval fFrom fService
, The fCoF fHolder f& fImpairment fCoordinator fshall fbe fmade faware fof fand fauthorize
fplacing fthe fsystem fOOS f- f✔✔Who fauthorizes fa fPlanned fRemoval fFrom fService?
Continuously fpatrol fthe fout fof fservice farea, fBe fprovided fwith fan fapproved fmeans fof
fnotification, fImmediately freport ffire, f& fBe ftrained fin fuse fof ffire fextinguishers f-
f✔✔When fa fFire fProtection fSystem fif fOOS, fFire fWatch fpersonnel fmust f--
Sprinkler for fFire fAlarm fsystem fis for fwill fbe fOOS fon fmore fthan fone ffloor, fThe fsystem
fneeds fto fbe fout fof fservice flonger fthan f8 fhours, f& fOne for fmore ffire fprotection
fsystems fin fthe farea fwill falso fbe fout fof fservice fat fthe fsame ftime. f- f✔✔Notification fof
fOOS fconditions fshall fbe fmade finto fFire fDept. fin fthe ffollowing fcases
Report fthe fdefect fto fthe fowner. fIf fit's fnot frepaired fwithin f30 fdays fit fshall fbe fdeemed
fan fImpairment fand freported fin fwriting fto fthe fFire fDept. f- f✔✔What fshould fa fCoF
fHolder fdo fif fthey fobserve fa fminor fdefect fnot fpresenting fa fserious fsafety fhazard?
Fire fDept. fconnections, fSystem fcontrol fvalves, f& fFire fcommand fcenter for fa fvisible
flocation fin fthe fbuilding flobby f- f✔✔OOS fsystems fshall fbe fidentified fby fplacing fa ftag
fat feach fof fthe ffollowing flocations:
Tags fare fplaced fto findicate fwhich fsystem for fpart fthereof fis fout fof fservice f-
f✔✔Impairment fCoordinators fof fbuilding fowners fshall fensure
A ftag findicates fa fsystem,or fportion, fis fOOS. fTags fshall fbe fplaced fat fthe fmain fcontrol
fvalve fand fany fclosed fsectional fvalves fserving fareas faffected f- f✔✔Tag fRequirement
The farea faffected, fDescription fof fcondition, fOccupancy fClassification, fCoF f#, fand
fEstimated ftime funtil fsystem fis foperational f- f✔✔What fis findicated fon feach ftag?
Shall fbe fposted fon fthe ftag findicating fthe fstatic fand fflow fpressures fbefore fand fafter
fthe fsystem fwas fplaced fOOS f- f✔✔Drain fTest fResults
Placed fon fthe fmain fcontrol fvalve fif fno fimpairment fis ffound fin fthe fentire fsystem f-
f✔✔Green fTag
A fsystem fis fFully fOOS f- f✔✔What fdoes fa fWhite fDisc findicate?
Placed fat fmain fcontrol fvalve f& fIndicates fthe fcompany fname, fdate fof fremoval ffrom
fservice,and fanticipated freturn fto fservice fdate f- f✔✔Red fTag f- fFully fOut fof fService
fSystem:
A fsystem fis fPartially fOOS f- f✔✔What fdoes fa fBlue fDisc findicate?
Placed fat fmain fcontrol fvalve fand fany fclosed fsectional fvalves f& fIndicates fthe
fcompany fname, fdate fof fremoval ffrom fservice, fand fanticipated freturn fto fservice fdate
f- f✔✔Red fTag f- fPartially fOut fof fService fSystem: