Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 17 pages
Exam (elaborations)

S-12 CITYWIDE SPRINKLER SYSTEMS, S12 SPRINKLER TEST QUESTIONS AND ANSWERS.

Document preview thumbnail
Preview 3 out of 17 pages

S-12 CITYWIDE SPRINKLER SYSTEMS, S12 SPRINKLER TEST QUESTIONS AND ANSWERS.

Content preview

S-12 CITYWIDE SPRINKLER SYSTEMS,
S12 SPRINKLER TEST QUESTIONS AND
ANSWERS

THE d__________ dIS dRESPONSIBLE dTO dMAINTAIN dSPRINKLER dSYS. dAND dTO
dDETERMINE dQUALIFICATIONS. d- d✔✔OWNER


RECORDS dOF dALL dINSPECTIONS dAND dMX dSHALL dBE dMAINTAINED dON
dPREMISES dFOR dA dMIN. dOF d__________ dYEARS. d- d✔✔3


THE dBUILDING dOWNER dSHALL dASSIGN dA(N) d____________ dTO dCOMPLY
dWITH dREQUIREMENTS. d- d✔✔IMPAIRMENT dCOORDINATOR


REGULAR dMX dAND dMINOR dREPAIRS dNOT dAFFECTING dMORE dTHAN
d________ dFLOOR(S) dARE dCONSIDERED dPLANNED dREMOVAL dFROM
dSERVICE. d- d✔✔1


SHUTDOWNS dAFFECTING dMORE dTHAN d_________ dFLOOR(S) dARE
dCONSIDERED dUNPLANNED dOUT dOF dSERVICE dCONDITIONS. d- d✔✔1


NOTIFICATION dTO dFDNY dIS dNOT dREQUIRED, dPROVIDED dSYSTEM dIS
dRETURNED dTO dSERVICE dWITHIN d______ dHOURS. d- d✔✔8


FOR dUNPLANNED dREMOVAL dFROM dSERVICE, dTHE dCOF dHOLDER dSHALL
dIMMEDIATELY dREPORT dCONDITION dTO dTHE d___________ dAND dTHE dFIRE
dDEPT. d- d✔✔OWNER dOF dTHE dBUILDING


IF dA dMINOR dDEFECT dIS dOBSERVED, dIT dSHALL dBE dCORRECTED dWITHIN
d_________ dDAYS dOR dIT dWILL dBE dCONSIDERED dAN dIMPAIRMENT. d- d✔✔30


WHAT dDOES d"OOS" dSTAND dFOR? d- d✔✔OUT dOF dSERVICE

OOS dSYSTEMS dSHALL dBE dIDENTIFIED dBY dPLACING d________ dAT dFIRE
dDEPT. dCONNECTIONS, dSYS. dCONTROL dVALVES, dAND dFIRE dCOMMAND
dCENTER d- d✔✔TAGS


A d_______ dSHALL dBE dREQUIRED dTO dPOST dTAGS dAT dMAIN dCONTROL
dVALVE dAND dANY dSECTIONAL dVALVES. d- d✔✔MASTER dFIRE dSUPPRESSION
dPIPING dCONTRACTOR

,__________ dSHALL dBE dPOSTED dON dTHE dTAG dINDICATING dBOTH dSTATIC
dAND dFLOW dPRESSURES dBEFORE dAND dAFTER. d- d✔✔DRAIN dTEST dRESULTS


GREEN dTAGS dINDICATE dTHAT d__________. d- d✔✔NO dIMPAIRMENT dWAS
dFOUND


GREEN dTAGS dWILL dBE dPLACED dON dTHE d____________. d- d✔✔MAIN
dCONTROL dVALVE


SYSTEMS dPARTIALLY dOR dFULLY dOUT dOF dSERVICE dSHALL dHAVE dA
d____________ dTAG dPLACED dON dTHE dMAIN dCONTROL dVALVE. d- d✔✔RED


A d_________ dDISC dOF d8-9 dINCHES dSHALL dBE dPLACED dON dCONNECTIONS
dTO dINDICATE dTHE dSYSTEM dIS dFULLY dOUT dOF dSERVICE. d- d✔✔WHITE


A d________ dDISC dOF d8-9 dINCHES dSHALL dBE dPLACED dON dCONNECTIONS
dTO dINDICATE dTHE dSYSTEM dIS dPARTIALLY dOUT dOF dSERVICE. d- d✔✔BLUE


THE dIMPAIRMENT dCOORDINATOR dWILL dNOTIFY dTHE d___________ dCARRIER,
dCENTRAL dSTATION dAND dOCCUPANTS. d- d✔✔INSURANCE


PRIOR dTO dRETURNING dA dSYS. dTO dSERVICE, dTHE d___________ dSHALL
dENSURE dTHAT dNECESSARY dTESTS dAND dINSPECTIONS dARE dCONDUCTED. d-
d✔✔IMPAIRMENT dCOORDINATOR


GLYCERIN dNOT dGREATER dTHAN d_________ dPERCENT dOR dGLYCOL dNOT
dGREATHER dTHAN d________ dPERCENT dSHALL dBE dUSED dTO dPROTECT
dFROM dFREEZING. d- d✔✔50, d40


THE dCOF dNUMBER dAND dSIGNATURE dOF dCOF dHOLDER dSHALL dBE dPOSTED
dNEAR dTHE d____________. d- d✔✔MAIN dCONTROL dVALVE


__________ dSHALL dBE dREADILY dAVAILABLE dTO dANY dREPRESENTATIVE dOF
dTHE dFIRE dDEPT. dTHESE dARE dTO dBE dMAINTAINED dON dSITE dFOR d3 dYEARS.
d- d✔✔RECORDS


FAILURE dTO dMAKE dINSPECTIONS dMAY dRESULT dIN d__________ dOF dTHE dCOF
dAND dCOURT dPROCEEDINGS. d- d✔✔REVOCATION


THE dCOF dHOLDER dMAY dINSPECT, dTEST, dAND dPERFORM dROUTINE dMX dIF
dTHEY dHOLD dTHE dFOLLOWING dCERTS: d- d✔✔REFRIGERATION dOPERATING
dENGINEER, dHIGH dPRESSURE dOPERATING dENGINEER, dAND dNYS dHIGH
dPRESSURE dOPERATING dENGINEER.

, A d________ dCAN dINSPECT, dMAINTAIN, dTEST, dAND dREPAIR dALL dFIRE
dSTANDPIPE dAND dSPRINKLER dSYSTEMS. d- d✔✔MASTER dFIRE dSUPPRESSION
dPIPING dCONTRACTOR d(MFSPC)


A dMASTER dPLUMBER d(MP) dWITH dCOF dIS dLIMITED dTO dRESIDENTIAL
dOCCUPANCIES dWITH d_________ dSPRINKLER dHEADS dOR dLESS. d- d✔✔30


ABOUT d______ dPERCENT dOF dFIRES dARE dEXTINGUISHED dOR dCONTROLLED
dWHEN dSPRINKLERS dARE dINSTALLED. d- d✔✔96


WET dPIPE dSYSTEMS dHAVE dWATER dAT dA dMINIMUM dTEMP. dOF d_______ dTO
dPREVENT dTHE dSYSTEM dFROM dFREEZING. d- d✔✔40 dFAHRENHEIT


__________ dVALVES dARE dNO dLONGER dPERMITTED dTO dBE dINSTALLED. d-
d✔✔COLD dWEATHER


________ dSYSTEMS dARE dINSTALLED dWHERE dA dWET dPIPE dSYSTEM dCANNOT
dBE dHEATED dTO dPREVENT dFREEZING. d- d✔✔DRY dPIPE


THE dDROP dIN d________ dCAUSES dA dSPECIAL dDRY dPIPE dVALVE dTO dOPEN. d-
d✔✔AIR dPRESSURE


IN dBUILDINGS dWHERE dLIFE dHAZARD dIS dHIGH d(SCHOOLS, dHOSPITALS) dTHE
dALARM dIS dTRANSMITTED dDIRECTLY dTO dTHE d_________. d- d✔✔FIRE
dDEPARTMENT


DRY dPIPE dVALVES dARE dOF dA d______ dDESIGN. d- d✔✔CLAPPER

DRY dPIPE dVALVES dARE dUSUALLY dSET dAT d________ dPSI dABOVE dTHE
dNORMAL dTRIP dLEVEL. d- d✔✔15-20


AN dACCELERATOR dAND dEXHAUSTER dARE dUSED dTO d_______THE dTIME dTO
dALLOW dWATER dINTO dTHE dSYSTEM. d- d✔✔REDUCE


BOTH dACCLERATOR dAND dEXHAUSTER dARE dACTIVATED dWHEN dA dDROP dOF
d_______ dPSI dIS dDETECTED dIN dTHE dSYSTEM. d- d✔✔2


IN dA dPREACTION dSYSTEM, dTHE d___________ dIS dOPENED dBEFORE dTHE
dSPRINKLER dHEADS. d- d✔✔PREACTION dVALVE


PREACTION dSYSTEM dALARMS dARE dGIVEN dAS dSOON dAS dTHE d_________ dIS
dOPENED. d- d✔✔VALVE


THREE dDEVICES dUSED dTO dTRIP dPREACTION dVALVES dARE dFIXED dTEMP
dDEVICES, dRATE dDEVICES, dAND d___________ dDEVICES. d- d✔✔COMBINATION

Document information

Uploaded on
October 17, 2024
Number of pages
17
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$11.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Gradegurus
4.9
(205)
Sold
230
Followers
2
Items
2319
Last sold
3 days ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions