CTS-I Practice Exam Questions and Correct Answers
Before developing a project plan, it is important to (CH3) have a clear understanding of the scope of work A scope statement should include: (CH3) Both in-scope and out-of-scope items The key elements of a project should be driven by: (CH3) the client's need What is a dependency within a project task schedule? (CH3) A task that cannot begin before another task has been completed Project budget refers to what? (CH3) The amount of labor and materials the project manager has allocated to complete the project. A primary reason for attending construction meetings is to: (CH3) Identify changes to the original design that will affect the av installation. In the event of a change in the placement of air-conditioning ducts in a boardroom, which of the following documents should the AV integrator submit first? (CH3) RFI Which of the following documents should an AV integrator submit in the event that a manufacturer has discontinued a projector model? (CH3) RFC The ANSI/INFOCOMM 2M-2010 Standard Guide for AV Systems Design and Coordination Process lays out a procedure for determining the_________ (CH3) project communication that needs to take place on a given project. After which of the following activities is an AV project completed? (CH3) System closeout activities are completed Which set of drawings should you reference to view the ductwork that goes through the building? Mechanical Drawings Which set of drawings should you reference to locate a power outlet for a video display? Electrical Drawings Which of the following must the as-built drawings show? Details of the system as finally installed OFOI Owner Furnished Owner Installed (you will not need to install) What does an elevation flag on a plan drawing indicate? Related elevation drawings What type of drawing would you use to find out exactly how the projector should be mounted to the ceiling? Detail Drawing Which of the following is the AV team likely to perform during new construction? • Install sprinkler system • Run cables and install mounts - Answer • Mount drop ceiling • Build the firewall What is the primary reason an AV installer should attend weekly construction meetings? ID changes that affect the AV installation Which of the following is the most important consideration during the installation of AV systems in a client-occupied space? Avoiding disruptions to your client's business What is the first step in conducting a technical site survey? Reviewing AV drawings with the AV designer What are best practices when evaluating facility conditions of a space that is ready for installation? • Note areas that may impact logistics • Make sure the site is clean and dust free • Take pictures and document all existing conditions • Note if you will need an extension ladder Which statement accurately describes what you should do when de-installing existing equipment? Call an electronic waste recycling contractor after confirming with client they are not keeping old equipment. If existing components have to be reused in a system, what is a critical task that the installer must perform? Test the equipment to makes sure it is operational Which organization's general safety codes and regulations must you follow when visiting a job site? The AHJ (authority having jurisdiction) What will a stakeholder analysis help you identify? The client's concerns and fears (likes and dislikes) about the AV system
Written for
- Institution
- CTS-I
- Course
- CTS-I
Document information
- Uploaded on
- October 15, 2024
- Number of pages
- 9
- Written in
- 2024/2025
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
cts i practice exam questions and correct answers
-
before developing a project plan it is important
-
a scope statement should include ch3 both in s
Also available in package deal