,Boilermaker NCCER Question and answers 100%
jk jk jk jk jk
correct 2023/2024
jk jk
A jkQUANTITATIVE jkANALYSIS jkOF jkTRAINING jkOUTCOMES
jkANDkjSTRATEGIES jkIN jkTHE jkCONSTRUCTION jkINDUSTRY
ABSTRACT jkOF jkDISSERTATION
A jkdissertation jksubmitted jkin jkpartial jkfulfillment jkof jkthe
jkrequirements jkfor jkthe jkdegree jkof jkDoctor jk of jkPhilosophy
jk in jk thejkCollege jkof jkEngineering
at jkthe jkUniversity jkof jkKentucky
By
jkYinggang
jkWang
Lexington, jk Kentucky
Director
Dr. jkPaul jkM. jkGoodrum
jkAssociate jk Professor jk of jk Civil
jk Engineering
Lexington,
jk Kentuckyk2
j 008
Copyright jk© jkYinggang jkWang jk2008
, ABSTRACT jkOF jkDISSERTATION
A jkQUANTITATIVE jkANALYSIS jk OF jk TRAINING jk OUTCOMES
jk ANDkS
j TRATEGIES jkIN jkTHE jk CONSTRUCTION jkINDUSTRY
The jkshortage jkof jkskilled jkworkers jkis jkone jkof jkthe jkgreatest jkchallenges jkfacing j k the
jk construction jkindustry. jkThe jkConstruction jkUsers jkRoundtable jk(CURT) jksurveyed
jkfacility kjowners j k on j k their j k workforce j k availability j k in j k the j k summer j k of j k 2001 j k and
j k found j k that j k 82 j k percent kjof jkthe jkrespondents jkreported jkexperiencing jkwork jkforce
jkshortages jkon jktheir jkprojects, jkand jk78 jkpercent jkindicated jkthat jkthe jktrend jkhad jkworsened
jkover jkthe jkprevious jkthree j k years. j k One jkpromising jksolution jkto jkrelieve jkthe jkshortage
jkof jkskilled jkworkers jkis jkto jkprovide jkadequate jkand jkeffective jktraining. jkMany jkresearch
jkefforts jkon jkconstruction jkworker jktraining jkhave jkbeen jkconducted j k in j k the j k past
j k decade j k in j k order j k to j k address j k the j k need j k and j k benefits j k of j k construction kjcraft
jktraining. jk jk jk jkHowever, jka jkquantitative jkanalysis jkof jkconstruction jkcraft jktraining’s
jkbenefits jkand j k costs jkfrom jkthe jkperspective jkof jkworker, jkproject jkand j k company jkhas
jkrarely jkbeen jkcarried jkout. jk jk jk jkProviding jkquantifiable jkanalysis jkregarding jkthe jkbenefits
jkand jkcosts jkof jktraining jkcan jkhelp jkto jksolve jkthe jkdebate jkexisting jkin jkthe jkindustry
jkregarding jkthe jkvalue jkof jkcraft jklabor jktraining jkand jkimprove jkthe jkeffectiveness jkof jkcraft
jktraining jkprograms.
The jkresearch jkinvestigated jkexisting jkmajor jkdatasets jkrelevant jkwith jkconstruction
jkcraft jktraining jkdeveloped jkby jkprevious jkresearch. jkMeanwhile, jkas jkpart jkof jkthis jkresearch,
jka jkcraft jkdirector jktraining jksurvey jkwas jkadministrated jkto jkmeasure jktraining jkbenefits jkin
jkproductivity, jkturnover, jkabsenteeism jksafety jkand jkrework, jkas jkwell jkas jkinformation jksuch
jkas jkcore jktraining jksubjects jkand jkcommon jkbarriers jkfor jktraining. jk jk jk jkThe jkprimary
jkobjective jkof jkthe jkstudy jkis jkto jkqualify jkthe jkoutcomes jkand jkeffectiveness jkof jkstrategies
jkfor jkconstruction jkcraft jktraining. jkFour jksecondary jkobjectives jkare jkcompleted jkto jkhelp
jkachieve jkthe jkprimary jk goal:
(I) Identify j k the j k major j k characteristics j k of j k construction j k training j k and
j k major j k factorskjaffecting jkconstruction jktraining;
(II) Quantitatively jkmeasure jkthe jkoutcomes jkof jkconstruction j k training j k on
j k thekjindividual jkand jkproject/company jklevel;
(III) Develop j k benefit-cost j k ratio j k models j k based j k on j k the j k survey
j k administrated j k by j k thejkstudy jkas jkwell jkas jkexisting jkindustry jkdata; jkand
, (IV) Perform jka jkskill jkaffinity jkanalysis jkto jkidentify jkreal jkmultiskilling jkpatterns
jkamong jkcraft jkworkers jkin jkorder jkto jkadopt jkmultiskilling jktraining jkstrategies
jkin jkthe jkconstruction jkindustry.
KEYWORDS: jkConstruction, jkWorkforce, jkCraft jkTraining, jkTrade, jkMultiskilling
Yinggang jkWang
Studentent’s jk Signature
March jk20, jk2008
Date