100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

NICET LEVEL 1 HIGHWAY CONSTRUCTION EXAM STUDY GUIDE

Rating
-
Sold
-
Pages
10
Grade
A+
Uploaded on
06-10-2024
Written in
2024/2025

EMILLYCHARLOTTE 2024/2025 ACADEMIC YAER ©2024 EMILLYCHARLOTTE. ALL RIGHTS RESERVED FIRST PUBLISH SEPTEMBER 2024 Page 1/10 NICET LEVEL 1 HIGHWAY CONSTRUCTION EXAM STUDY GUIDE Acceptance - Answer-The written acceptance by the Department of the Work. acceptance testing - Answer-Testing conducted by the Department to measure the degree of compliance to the Contract actual cost - Answer-The computed cost using calculations provided addendum - Answer-A Contract revision or response to a Contractor inquiry issued after advertisement and before the opening of bids. as-built quantity - Answer-The quantity of a completed Item eligible for payment authorized funding amount - Answer-The amount of funds authorized by the Department for the Contract Bidder - Answer-The individual, firm, partnership, corporation, joint venture, or any acceptable combination thereof that submits a bid to the Department. bridge - Answer-. A structure, other than a culvert, including supports, erected over a depression or an obstruction, such as water, highway, or railway, and having a track or passageway for carrying traffic or other moving loads and having a length 3 measured along the center of the structure of more than 20 EMILLYCHARLOTTE 2024/2025 ACADEMIC YAER ©2024 EMILLYCHARLOTTE. ALL RIGHTS RESERVED FIRST PUBLISH SEPTEMBER 2024 Page 2/10 feet between undercopings of abutments or extreme ends of openings for multiple boxes. Structure dimensions are defined as follows: bridge length - Answer-The overall length measured along the line of survey stationing from back to back of backwalls of abutments, if present, otherwise end to end of the bridge floor; but, in no case less than the total clear opening of the structure bridge width - Answer-The clear width measured at right angles to the longitudinal centerline of the bridge between the bottom of curbs, or in the case of multiple height of curbs, between the bottoms of the lower risers or, if curbs are not used, between inner faces of parapet or railing Change Order. - Answer-A written order issued by the Department to the Contractor after execution of the Contract authorizing one or more of the following: 1. Changes in the Work. 2. Modifications in the basis of payment. 3. Modifications to Contract Time. Commercially Useful Function - Answer-Occurrences in which the subcontractor is responsible for the execution of a distinct element of the work of a contract and carrying out its responsibilities by actually performing, managing, and supervising the work involved, and with respect to materials and supplies used on the contract, prepares the estimate, negotiates price, determines quality and quantity, orders the material, arranges delivery, installs (where applicable), and pays for the material and supplies itself for the project. Completion - Answer-When all of the following have occurred: 1. The Work has been satisfactorily completed in all respects according to the Contract. 2. The Project is ready for use by the Department as required by the Contract. 3. The Contractor has satisfactorily executed and delivered to the RE all EMILLYCHARLOTTE 2024/2025 ACADEMIC YAER ©2024 EMILLYCHARLOTTE. ALL RIGHTS RESERVED FIRST PUBLISH SEPTEMBER 2024 Page 3/10 documents, certificates, and proofs of compliance required by the Contract including the Notice of Completion. construction operations - Answer-Physical work done in the performance of the Contract within the Project Limits. Does not include off-site mobilization, procurement and off-site storage of materials and plants, engineering, performance bond and payment bond, surveys, working drawings, off-site field offices, schedules, certificates, forms, or documents Contract - Answer-The written integrated agreement between the Department and the Contractor setting forth the obligations of the parties, including, but not limited to, the performance of the Work and the basis of payment. It includes the advertisement, Proposal, Certification as to Publication and Notice of Advertisement for Proposal, bid, Appointment of Agent by Nonresident Contractors, Resolution of Award of Contract, Executed Form of Contract, performance and payment bonds, Specifications, Plans, Right-of-Way Plans, permits, boring logs, pavement core records, addenda, Change Orders, and Field Orders, all of which are to be treated as

Show more Read less
Institution
Nicet
Course
Nicet









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Nicet
Course
Nicet

Document information

Uploaded on
October 6, 2024
Number of pages
10
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

EMILLYCHARLOTTE 2024/2025 ACADEMIC YAER ©2024 EMILLYCHARLOTTE. ALL RIGHTS RESERVED
FIRST PUBLISH SEPTEMBER 2024




NICET LEVEL 1 HIGHWAY
CONSTRUCTION EXAM STUDY
GUIDE

Acceptance - Answer✔✔-The written acceptance by the Department of the Work.


acceptance testing - Answer✔✔-Testing conducted by the Department to measure the degree of

compliance to the Contract


actual cost - Answer✔✔-The computed cost using calculations provided


addendum - Answer✔✔-A Contract revision or response to a Contractor inquiry issued after

advertisement and before the opening of bids.


as-built quantity - Answer✔✔-The quantity of a completed Item eligible for payment


authorized funding amount - Answer✔✔-The amount of funds authorized by the Department for the

Contract


Bidder - Answer✔✔-The individual, firm, partnership, corporation, joint venture, or any acceptable

combination thereof that submits a bid to the Department.


bridge - Answer✔✔-. A structure, other than a culvert, including supports, erected over a depression or

an obstruction, such as water, highway, or railway, and having a track or passageway for carrying traffic

or other moving loads and having a length 3 measured along the center of the structure of more than 20




Page 1/10

, EMILLYCHARLOTTE 2024/2025 ACADEMIC YAER ©2024 EMILLYCHARLOTTE. ALL RIGHTS RESERVED
FIRST PUBLISH SEPTEMBER 2024


feet between undercopings of abutments or extreme ends of openings for multiple boxes. Structure

dimensions are defined as follows:


bridge length - Answer✔✔-The overall length measured along the line of survey stationing from back to

back of backwalls of abutments, if present, otherwise end to end of the bridge floor; but, in no case less

than the total clear opening of the structure


bridge width - Answer✔✔-The clear width measured at right angles to the longitudinal centerline of the

bridge between the bottom of curbs, or in the case of multiple height of curbs, between the bottoms of

the lower risers or, if curbs are not used, between inner faces of parapet or railing


Change Order. - Answer✔✔-A written order issued by the Department to the Contractor after execution

of the Contract authorizing one or more of the following: 1. Changes in the Work. 2. Modifications in the

basis of payment. 3. Modifications to Contract Time.


Commercially Useful Function - Answer✔✔-Occurrences in which the subcontractor is responsible for

the execution of a distinct element of the work of a contract and carrying out its responsibilities by

actually performing, managing, and supervising the work involved, and with respect to materials and

supplies used on the contract, prepares the estimate, negotiates price, determines quality and quantity,

orders the material, arranges delivery, installs (where applicable), and pays for the material and supplies

itself for the project.


Completion - Answer✔✔-When all of the following have occurred: 1. The Work has been satisfactorily

completed in all respects according to the Contract. 2. The Project is ready for use by the Department as

required by the Contract. 3. The Contractor has satisfactorily executed and delivered to the RE all




Page 2/10

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
EmillyCharlotte Howard Community College
View profile
Follow You need to be logged in order to follow users or courses
Sold
94
Member since
1 year
Number of followers
4
Documents
11951
Last sold
2 days ago
ALL-MAJOR.

On this page, you find all documents, package deals, and flashcards offered by seller Emilly Charlotte.

3.6

20 reviews

5
7
4
6
3
2
2
2
1
3

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions