Questions with Verified Answers. a- a- a-
How often does a digger Derrick need to be tested dialectrically
a- a- a- a- a- a- a- a- a- a- a-a-
Every two years
a- a- a-
What kind of work site protection can be implemented in TTC
a- a- a- a- a- a- a- a- a- a- a-
areas Flags, cones, signs
a-a- a- a- a-
While performing your walk around what is important to check
a- a- a- a- a- a- a- a- a- a-
for regarding the dialectic certification
a- That it is not expired,
a- a- a- a-a- a- a- a- a- a- a-
good for 2 years a- a- a-
How many days ahead should you call before you begin digging,
a- a- a- a- a- a- a- a- a- a- a-
what number do you call
a- 2-3 days a- a- a- a-a- a- a- a-
If you have a non dialectic truck how close can you get to a 16kv
a- a- a- a- a- a- a- a- a- a- a- a- a- a- a-
line Ten feet (up to 50kv)
a-a- a- a- a- a- a-
How far away should you keep from a 750 kv line in a non
a- a- a- a- a- a- a- a- a- a- a- a- a- a-
dialectic truck Forty five feet (up to 1million kv)
a- a-a- a- a- a- a- a- a- a-
, What information should you have before you call 811
a- a- a- a- a- a- a- a- a-a- a-
Contact information, location of dig, type of work that is to be
a- a- a- a- a- a- a- a- a- a- a- a-
done
Who comes out to mark locations of underground utilities in
a- a- a- a- a- a- a- a- a- a-
your dig area
a- Utility company
a- a-a- a- a-
Always stay away a minimum of what distance from underground
a- a- a- a- a- a- a- a- a- a-
utilities when digging Minimum of 2ft
a- a- a-a- a- a- a-
What can and cannot be used in a tolerance zone
a- a- a- a- a- a- a- a- a-
To dig
a- a-a- a- Hand tools, vacuum a- a- a-
No power tools, digger Derrick etc
a- a- a- a- a- a-
24 inches each side of conduit
a- a- a- a- a-
What do you call using the right tools for the right job while
a- a- a- a- a- a- a- a- a- a- a- a- a-
partaking in soft excavation or digging by hand
a- a- Prudent a- a- a- a- a- a-a- a- a-
excavation techniques a-