CM 4100 Assignments with Questions and Answers 100% Correct
CM 4100 Assignments with Questions and Answers 100% Correct A precedence diagram uses nodes to represent Select one: a. Activities b. Activity links c. Resources d. Time - CORRECT ANSWER-Activities A significant difference between "planning" and "scheduling" is, Select one: Scheduling determines what is going to be done, and planning determines how to do. Scheduling determines how to do, and planning determines what to do. Scheduling determines when to do, and planning determines what to do, how to do and by whom. - CORRECT ANSWER-Scheduling determines when to do, and planning determines what to do, how to do and by whom. According to the assumption discussed in this chapter for time-cost analysis, increasing project duration will always lead to Select one: a. Increase of project direct cost b. Decrease of project direct cost c. Increase of project indirect cost d. Decrease of project indirect cost - CORRECT ANSWER-INCREASE OF PROJECT INDIRECT COST After resource constraints are added to a schedule, which of the following is correct about the project duration? Select one: a. Shorter than the duration before resource constraints are added. b. Longer than the duration before resource constraints are added. c. The project duration will not be affected by resource constraints. - CORRECT ANSWER-LONGER THAN THE DURATION BEFORE RESOURCE CONSTRAINTS ARE ADDED B----D c There are four activities, A, B, C, and D (See Figure I ). B depends on A. C depends on A. D depends on B. Which of the following are true? Select one: A is IPA of B. B is IPA of D. A is IPA of D. C is IPA of D. A and B - CORRECT ANSWER-A and B Correct A is IPA of B B is IPA of D Cash flow analysis is about the disbursement and receipt of funds for Select one: a. Labor b. Materials c. Equipment d. Subs e. All of the items listed - CORRECT ANSWER-e. All of the items listed LABOR MATERIALS EQUIPMENT SUBS
Written for
- Institution
- CM 4100
- Course
- CM 4100
Document information
- Uploaded on
- September 17, 2024
- Number of pages
- 7
- Written in
- 2024/2025
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
cm 4100 assignments with questions and answers 100
-
a precedence diagram uses nodes to represent
-
after resource constraints are added to a schedule