Questions and Answers / Sure A+
A BUILDING HAS 3 DIFFERENT TYPES OF SPRINKLERS. HOW MANY SPRINKLER WRENCHES ARE REQUIRED
TO BE KEPT ON PREMISES - 3 ONE FOR EACH TYPE OF SPRINKLER
A CLASS 1 STANDPIPE SYSTEM IS A SYSTEM THAT PROVIDES "BLANK" HOSE CONNECTIONS TO WATER
SUPPLY USED BY FIRE DEPARTMENTS - 2 1/2" HOSE CONNECTIONS
A PERMANENTLY MARKED INFORMATION SIGN SHALL BE PLACED AT THE "BLANK" SUPPLYING THE
ANTIFREEZE LOOP, DRY SYSTEM, PREACTION SYSTEM, OR AUXILIARY SYSTEMS CONTROL VALVE -
SYSTEM CONTROL RISER
ACCORDING TO NFPA 25, RECORDS FOR INSPECTION, TESTING AND MAINTENANCE SHALL BE
MAINTAINED BY - THE A.H.J
ACCORDING TO OSHA'S LOCKOUT TAGOUT STANDARDS, WHICH OF THE FOLLOWING INDUSTRIES ARE
EXEMPT - ALL OF THE ABOVE. OIL AND GAS DRILLING. ELECTRICAL UTILITIES. ELECTRICAL
UTILIZATION INSTALLATION.
ALL PENETRATIONS INTO THE AREA OF COLD STORAGE SHALL BE INSPECTED. IF AN ICE OBSTRUCTION IS
FOUND DURING THIS INSPECTION, WHAT REQUIREMENT SHALL BE EMPLOYED - ADDITIONAL PIPE
SHALL BE EXAMINED TO ENSURE NO ICE BLOCKAGE EXISTS
DURING AN INSPECTION, WHICH OF THE FOLLOWING WOULD BE IDENTIFIED AS A SPRINKLER WHICH
SHALL BE REPLACED? - CORROSION
DURING TESTING AND MAINTENANCE A FIRE PUMP IS OUT OF SERVICE AND NOT UNDER CONSTANT
ATTENDANCE BY QUALIFIED PERSONNEL. THIS IS CONSIDERED A AN - AN IMPAIRMENT
EQUIPMENT SHOULD BE LOCKED OUT / TAGGED OUT WHEN WHICH OF THE FOLLOWING CONDITIONS
EXIST? AN EMPLOYEE IS REQUIRED TO BYPASS A GUARD OR OTHER SAFETY DEVICE DURING
MAINTENANCE. AN ASSOCIATED DANGER ZONE EXISTS WHEN MACHINERY IS OPERATED. AN EMPLOYEE
IS REQUIRED TO PLACE ANY BODY PART INTO AN AREA OF THE EQUIPMENT WHERE WORK IS ACTUALLY
, BEING PERFORMED UPON THE MATERIAL BEING PROCESSED. ALL OF THE ABOVE. - ANSWER. ALL
OF THE ABOVE.
GAUGES NOT ACCURATE WITHIN "BLANK" PERCENT OF THE FULL SCALE SHALL BE RECALIBRATED OR
REPLACED - 3%
GAUGES SHALL BE REPLACED EVERY "BLANK" OR TESTED EVERY "BLANK" BY COMPARISON WITH A
CALIBRATED GAUGE. - 5 YEARS / 5 YEARS
HEARING PROTECTION IS REQUIRED WHEN THE BOISE LEVEL REACHES 90DBA FOR A DURATION OF -
8 HOURS
HOSE CONNECTIONS SHALL BE INSPECTED, TESTED, AND MAINTAINED IN ACCORDANCE WITH NFPA 25
CHAPTER "BLANK" AND CHAPTER "BLANK" - CHAPTER 6 AND CHAPTER 13
HOSE CONNECTIONS SHALL BE INSPECTED, TESTED, AND MAINTAINED IN ACCORDANCE WITH NFPA 25
CHAPTER 6 AND CHAPTER 13
HOW FAR ABOVE THE POINT OF SUPPORT IS A LDDER REQUIRED TO EXTEND WHEN USING ACCESS TO
THE ROOF - 3 FEET
HOW OFTEN SHALL THE SYSTEM INFORMATION SIGN BE TESTED? - TESTING IS NOT REQUIRED
FOR THE INFORMATION SIGN
IDENTIFY WHAT TYPE OF SPRINKLER IS DESIGNED TO BE INSTALLED IN SUCH A WAY THAT THE WATER
STREAM IS DIRECTED DOWNWARD AGAINST THE DEFLECTOR - PENDANT SPRINKLER
IF AN EXPLOSIVE ACTUATED TOOL MISFIRES, YOU SHOULD - WAIT 30 SECONDS, THEN REFIRE
IN SYSTEMS WHERE THE SOLE WATER SUPPLY IS THROUGH A BACKFLOW PREVENTER AND/OR
PRESSURE REDUCING VALVES, THE MAIN DRAIN TEST OF AT LEAST ONE SYSTEM DOWNSTREAM OF THE
DEVICE SHALL BE CONDUCTED? - QUARTERLY