EXAM_SOLUTIONS GUARANTEED SUCCESS 2024/2025 ACADEMIC YEAR
©SOPHIABENNETT 9/3/24 2024/2025
, ©SOPHIABENNETT EXAM SOLUTIONS_2024/2025 Tuesday, September 3, 2024 10:30 AM
Facilities Management Final Exam
Practice Questions and Answers | 100%
Pass
One of the outcomes of developing a facility with appropriate quality and good budget
control is ________ maintenance, renovation, and operation costs.
A) The benefit of predictable
B) Negligible
C) The virtual elimination of
D) Near-term high - Answer✔️✔️-A
A hotels property operation and maintenance account includes:
A) Maintenance department labor and fringe benefit costs, maintenance supplies and
expendables, and contract maintenance costs.
B) Steam generation costs, maintenance supplies and expendables, and maintenance
department labor and fringe benefit costs.
C) Maintenance supplies and expendables, maintenance department labor and fringe
benefit costs, and electricity.
D) Maintenance department labor and fringe benefit costs, facility fuel costs, and
contract maintenance costs. - Answer✔️✔️-D
A hotel's capital expenditures, as a percentage of revenue, __________ from year to
year.
A) Vary negligibly
Page | 1
, ©SOPHIABENNETT EXAM SOLUTIONS_2024/2025 Tuesday, September 3, 2024 10:30 AM
B) stay the same
C) Vary widely, but predictably
D) Are not even broadly predictable - Answer✔️✔️-C
What is a reserve for replacement account?
A) It is a percentage of revenue set aside for replacement and repair.
B) It is an account that covers a reserve costs.
C) It is a percentage of the utility account that covers heating costs.
D) It is an account set aside for designing facilities - Answer✔️✔️-A
Compared with high-rise buildings, spread-out low-rise facilities are more likely to incur
costs for:
A) Premature equipment failure
B) Renovation needs.
C) Transportation equipment to enable staff members to get around the premises.
D) All of the above - Answer✔️✔️-C
As a buildings equipment reaches its expected service life, management can expect:
A) The maintenance department to make the equipment last indefinitely.
B) The equipment to totally break down under peak loads, necessitation immediate
replacement.
C) More frequent equipment failures.
D) A measurable increase in efficiency just before total breakdown. - Answer✔️✔️-C
A piece of equipment near the end of its expected life is probably not worth repairing
unless the:
A) Piece of equipment is expensive
Page | 2