Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 20 pages
Exam (elaborations)

UST Service Technician Questions & 100% Correct Answers

Document preview thumbnail
Preview 3 out of 20 pages

Type A Fire Extinguisher ~~ Puts out paper, wood, cloth, rubbish fires. Type B Fire Extinguisher ~~ Puts out flammable and combustible liquids. Type C Fire Extinguisher ~~ Puts out electrical fires. According to CCR, Title 23 UST Regulations, what is the frequency that the monitor system certification must be performed? ~~ 12 month If visual monitoring is utilized as the means of release detection for a single walled tank, it must be conducted on a _____ basis. ~~ daily The purpose of spill and overfill protection equipment is to minimize the potential for a release during _____. 2 | P a g e | © copyright 2024/2025 | Grade A+ Master01 | September, 2024/2025 | Latest update ~~ fuel deliveries Which of the following is a potential symptom of toxic petroleum exposure? a. dizziness b. tremors c. eye irritation d. all the above ~~ d. all the above Under-dispenser containment is required for _____ underground storage tank systems. ~~ all All of the following are true for Automatic Tank Gauging except for... a. ATG system consists of a probe installed in a tank b. ATG systems are required to be installed in all UST systems c. ATG systems have a control panel that can provide information on product level and temperature 3 | P a g e | © copyright 2024/2025 | Grade A+ Master01 | September, 2024/2025 | Latest update d. ATG systems can be programmed to calculate the changes in product volume to determine if a tank is leaking ~~ b. ATG systems are required to be installed in all UST systems According to CCR Title 23, UST regulations, spill containment must meet all of the following requirements except: a. be installed on vent risers b. have a minimum capacity of 5 gallons c. collect any hazardous substance d. be equipped with a a drain valve or other means to keep the spill container empty ~~ a. be installed on vent risers Suction piping may not require leak detection if it has only one check valve located where? ~~ directly below the suction pump Service technician performing work on monitoring equipment must be trained by _____

Content preview

1 | P a g e | © copyright 2024/2025 | Grade A+




UST Service Technician Questions & 100%
Correct Answers
Type A Fire Extinguisher

✓ ~~> Puts out paper, wood, cloth, rubbish fires.




Type B Fire Extinguisher

✓ ~~> Puts out flammable and combustible liquids.




Type C Fire Extinguisher

✓ ~~> Puts out electrical fires.




According to CCR, Title 23 UST Regulations, what is the frequency that the

monitor system certification must be performed?

✓ ~~> 12 month




If visual monitoring is utilized as the means of release detection for a single

walled tank, it must be conducted on a _____ basis.

✓ ~~> daily




The purpose of spill and overfill protection equipment is to minimize the

potential for a release during _____.

Master01 | September, 2024/2025 | Latest update

, 2 | P a g e | © copyright 2024/2025 | Grade A+



✓ ~~> fuel deliveries




Which of the following is a potential symptom of toxic petroleum exposure?




a. dizziness

b. tremors

c. eye irritation

d. all the above

✓ ~~> d. all the above




Under-dispenser containment is required for _____ underground storage tank

systems.

✓ ~~> all




All of the following are true for Automatic Tank Gauging except for...




a. ATG system consists of a probe installed in a tank

b. ATG systems are required to be installed in all UST systems

c. ATG systems have a control panel that can provide information on

product level and temperature




Master01 | September, 2024/2025 | Latest update

, 3 | P a g e | © copyright 2024/2025 | Grade A+



d. ATG systems can be programmed to calculate the changes in product

volume to determine if a tank is leaking

✓ ~~> b. ATG systems are required to be installed in all UST systems




According to CCR Title 23, UST regulations, spill containment must meet all of

the following requirements except:




a. be installed on vent risers

b. have a minimum capacity of 5 gallons

c. collect any hazardous substance

d. be equipped with a a drain valve or other means to keep the spill

container empty

✓ ~~> a. be installed on vent risers




Suction piping may not require leak detection if it has only one check valve

located where?

✓ ~~> directly below the suction pump




Service technician performing work on monitoring equipment must be

trained by _____.




Master01 | September, 2024/2025 | Latest update

Document information

Uploaded on
September 13, 2024
Number of pages
20
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$11.59

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Axpert
3.8
(126)
Sold
560
Followers
167
Items
29274
Last sold
2 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions