Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

TMS3723 Assignment 5 2024 - DUE 9 September 2024 STUDY GUIDE AND PRACTICE EXAM 2024/2025 | ACCURATE REAL EXAM QUESTIONS WITH VERIFIED ANSWERS | EXPERT VERIFIED FOR A GUARANTEED PASS | LATEST UPDATE

Rating
-
Sold
-
Pages
22
Uploaded on
03-09-2024
Written in
2024/2025

TMS3723 Assignment 5 2024 - DUE 9 September 2024 STUDY GUIDE AND PRACTICE EXAM 2024/2025 | ACCURATE REAL EXAM QUESTIONS WITH VERIFIED ANSWERS | EXPERT VERIFIED FOR A GUARANTEED PASS | LATEST UPDATE

Institution
TMS3723
Course
TMS3723

Content preview

TMS3723 Assignment 5 2024 - DUE 9 September
2024 STUDY GUIDE AND PRACTICE EXAM
2024/2025 | ACCURATE REAL EXAM QUESTIONS
WITH VERIFIED ANSWERS | EXPERT VERIFIED FOR A
GUARANTEED PASS | LATEST UPDATE

,QUESTION I In the test strategy document your organization declares:
- To adopt a V-model development lifecycle, with three formal levels of testinG. unit,
integration and system testing
- To use a blended risk-based and regression-averse testing strategy for each level of
testing
The following is an excerpt of the "approach" section for the system test plan document
of a new project:
"Testing will only use manual tests. Due to the short period of time for test execution,
the following activities will be performed in parallel with test execution: Test planning,
test analysis and test design. Basic metrics will be taken for test effort (i.e. person-
hours), test cases executed (passed/failed), and incidents (no more metrics, such as
code coverage, will be collected)."
In the system test plan, no deviations from the test strategy are described.
Based only on the given information, which of the following statements is tr -
✔✔ANSW✔✔..D

QUESTION 2
In the next two months some new features will be constantly added to new releases of a
project you are working on as Test Manager.
You have identified as one ofthe main project risks, that the requirements specification
will still be incomplete when your team starts the test design and implementation phase.
Some requirements will most likely be completed too late to allow a proper test
preparation.
You and your test team have already worked on several similar past projects in the
same organization.
Which one of the following options would you expect to be the most effective at
mitigating this risk?
K4 3 credits
A. Don't prepare any test and just run the regression test suite to check that the new
features don't introduce regression
B. Make reasonable assumptions about the missing details and design lightweight tests
that can be easily updated during test execution
C. Don't design any test until the test ex - ✔✔ANSW✔✔..B

QUESTION 3

Consider the following test strategies:
I. Consultative test strategy
Il. Reactive test strategy
Ill. Analytical test strategy
IV. Process-compliant test strategy
Consider also the following examples of test activities:
I. Prioritize the test cases, based on the results of a FMEA analysis, to ensure early
coverage of the most important areas and discovery of the most important defects
during test execution

, 2. Execute usability testing driven by the guidance ofa sample of users (external to the
test team)
3. Perform exploratory testing sessions throughout the system test phase
4. On an Agile project, execute tests that cover the test conditions identified for each
user story of a feature planned for an iteration
Which of the following correctly matches each test strategy with an appropriate
example?
K2 1 credit
B. 1-2; 11-3; 111-4; IV-I
C. 1-3; 11-2; 111-1; IV-4
D. 1-1; 11-2; 111-3; IV-4
E. 1-2; 11-3; 111 - ✔✔ANSW✔✔..E

QUESTION 4

You are the Test Manager of a new project that will have three formal levels of testing:
unit, integration and system testing.
The testing strategy you decide to adopt a blend of risk-based testing and reactive
testing strategies.
Which of the following answers describes the most consistent example of
implementation of this test strategy during the execution of the system tests?
K2 1 credit
A. Your test team executes exploratory tests following a session-based test
management approach throughout the system test phase
B. Your test team executes system tests under the guidance of a sample of users
throughout the system test phase
C. Your test team executes scripted tests designed and implemented before the
execution of the system test phase, to cover the identified product risks. It also performs
exploratory testing sessions throughout the system test phase
D. Your test team autonomously performs some expl - ✔✔ANSW✔✔..C

You are the Test Manager of a new project aimed at developing a software system that
must be certified at level B of the DO-178B standard. The project will follow a V-ModeI
software development life cycle and it will have four formal levels of testing: component,
integration, system and acceptance testing.
You must produce the test plan documentation for this project by providing an adequate
coordination across the four levels of testing in order to assure audit ability. Which of the
following answers would you expect to best describe how to organize the test plan?
K3 2 credits
A. Produce a single master test plan that covers in detail all four levels, describing the
particular activities for all test levels
B. Produce a master test plan that covers three levels (component, integration, system
test) and a separate acceptance test plan
C. Produce a master test plan describing the relationship between the four levels, -
✔✔ANSW✔✔..C

Written for

Institution
TMS3723
Course
TMS3723

Document information

Uploaded on
September 3, 2024
Number of pages
22
Written in
2024/2025
Type
Exam (elaborations)
Contains
Unknown

Subjects

$16.39
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Docwayne5 walden university
View profile
Follow You need to be logged in order to follow users or courses
Sold
188
Member since
2 year
Number of followers
29
Documents
4596
Last sold
19 hours ago
TEACH ME TO

I HEIP STUDENTS WITH ALL TYPE OF EXAMZ LIKE NGN,ATI,HESI,PN COMPREHENSION., FIREFIGHTER ,ECONOMICS .ENGLISH,SPANISH.MATHEMATICS .......TO SCORE A+

4.9

719 reviews

5
668
4
21
3
15
2
4
1
11

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions