ICC / UST EXAM LATEST UPDATED
Corrosion Specialist - ANSWER designs and certifies cathodic protection systems.
Secondary containment must be designed to hold at least the following volumes: -
ANSWER A. When there is just one primary, the secondary contains 100% of the
primary's useful capacity.
B. 150% of the largest container if there are several primary containers in a single
secondary
The cathodic protection tester will test the cathodic protection system within __
months of installation and every __ year afterwards. ANSWER: 6 months
Three years.
Spill containers must meet the following requirements: - ANSWER A. If composed
of metal, the outer wall must be protected against galvanic corrosion.
B. Must have a minimum capacity of 5 gallons (19L).
C. Must have a drain valve that permits the collected spill to drain into the primary
container, or provide ways to keep the spill container empty.
Overfill prevention will notify the transfer operator when the tank is 90% filled.
When the tank is filled to no more than __% capacity (answer 95%), the flapper
valves must ensure a positive shut off.
Primary pressurized pipe must be hydrostatically tested for tightness at __% of the
design operating pressure (ANSWER 150%).
, Date that all UST systems must have Line Leak Detector installed: November 9,
2004.
Secondary containment testing shall be done on ____, __months, and every ___
months or ____ years afterwards. - Installation
Six months.
36 months or three years.
Owners/ops must report SCT results to the local agency within ____ days of
completion - answer 30 days.
All monitoring equipment must be examined, calibrated, operated, maintained, and
certified every ____ month. - ANSWER Twelve months.
A person conducting UST monitoring equipment certification must apply a
tag/sticker to each component, including ___ and ___. - Answer: Date certified,
replaced, or fixed.
The license number of the contractor or tank tester
LLD must detect the discharge of __ gph and ___ PSI within ___ hour. ANSWER:
3 gph
10 PSI
Suction pipework must be examined every ___ years (answer: three years).
Owners/operators of UST shall send a copy of the ELD results to the local agency
within ___ days of completion of the test - ANSWER 60 days.
Corrosion Specialist - ANSWER designs and certifies cathodic protection systems.
Secondary containment must be designed to hold at least the following volumes: -
ANSWER A. When there is just one primary, the secondary contains 100% of the
primary's useful capacity.
B. 150% of the largest container if there are several primary containers in a single
secondary
The cathodic protection tester will test the cathodic protection system within __
months of installation and every __ year afterwards. ANSWER: 6 months
Three years.
Spill containers must meet the following requirements: - ANSWER A. If composed
of metal, the outer wall must be protected against galvanic corrosion.
B. Must have a minimum capacity of 5 gallons (19L).
C. Must have a drain valve that permits the collected spill to drain into the primary
container, or provide ways to keep the spill container empty.
Overfill prevention will notify the transfer operator when the tank is 90% filled.
When the tank is filled to no more than __% capacity (answer 95%), the flapper
valves must ensure a positive shut off.
Primary pressurized pipe must be hydrostatically tested for tightness at __% of the
design operating pressure (ANSWER 150%).
, Date that all UST systems must have Line Leak Detector installed: November 9,
2004.
Secondary containment testing shall be done on ____, __months, and every ___
months or ____ years afterwards. - Installation
Six months.
36 months or three years.
Owners/ops must report SCT results to the local agency within ____ days of
completion - answer 30 days.
All monitoring equipment must be examined, calibrated, operated, maintained, and
certified every ____ month. - ANSWER Twelve months.
A person conducting UST monitoring equipment certification must apply a
tag/sticker to each component, including ___ and ___. - Answer: Date certified,
replaced, or fixed.
The license number of the contractor or tank tester
LLD must detect the discharge of __ gph and ___ PSI within ___ hour. ANSWER:
3 gph
10 PSI
Suction pipework must be examined every ___ years (answer: three years).
Owners/operators of UST shall send a copy of the ELD results to the local agency