Design-Build Entity Configurations - ACCURATE ANSWER✅✅-
Contractor Led
• A/E Led
• Integrated Firm
• Developer Led
• Joint Venture
The Controlling Entity is: - ACCURATE ANSWER✅✅whoever holds
the Prime Contract
RFP - ACCURATE ANSWER✅✅-Technical Proposal
-drawings, written specifications,
renderings, models
, -Price Proposal
-Stipulated Sum proposed based on
Technical Proposal
Standard Form Design-Build Contracts - ACCURATE ANSWER✅✅-
AIA
• EJCDC
• AGC
• DBIA
What is not addressed in AIA agreements? - ACCURATE
ANSWER✅✅PRICING
Level of design in RFP - ACCURATE ANSWER✅✅Determines who
controls the details of the design
Design Draw-Build - ACCURATE ANSWER✅✅• 35% Design or
Greater
• Typically Low Bid-Based Procurement
Design-Builder is selected on the
basis of price only
Programming - ACCURATE ANSWER✅✅a written statement of
requirements of the building used as the basis for design and the Owner's
budget & Schedule