A CM's role and responsibilities are governed solely by the Owner/CM Agreement.
n n n n n n n n n n n
True False - ANS-True
n n n
There are two basic forms of CM, agency and at-risk. Each form provides for the basic
n n n n n n n n n n n n n n n
n services of construction management practice. However, there are some key differences.
n n n n n n n n n n
n Which of the following do not apply to both CM forms?
n n n n n n n n n n
A) Both forms provide advice to the owner on constructibility, budget and the schedule.
n n n n n n n n n n n n n
B) Both require that the liabilities and risks assumed by the parties be clearly understood,
n n n n n n n n n n n n n n
n coordinated, and stated in the respective contracts.
n n n n n n
C) Both forms allow the CM to function in an advisory role for the entire engagement of
n n n n n n n n n n n n n n n n
n the CM. n
D) Services can vary based on the contractual relationships of the parties and the risks
n n n n n n n n n n n n n n
n that are assumed. - ANS-C) Both forms allow the CM to function in an advisory role for
n n n n n n n n n n n n n n n n
n the entire engagement of the CM.
n n n n n
Construction management had its beginnings in the early to mid-1960's. Which of the
n n n n n n n n n n n n
n following factors contributed to the initial use of this delivery system?
n n n n n n n n n n
,A) The need to reduce the overall time and cost associated with project delivery.
n n n n n n n n n n n n n
B) The increasing cost of money and the unpredictability of project funding streams.
n n n n n n n n n n n n
C) The changing role of the general contractor and the increasing numbers of specialty
n n n n n n n n n n n n n
n trade contractors.
n
D) All of the above. - ANS-D) All of the above.
n n n n n n n n n n
The General Services Administration was the first federal agency to use construction
n n n n n n n n n n n
n management. - ANS-True n n
The General Services Administration, the Department of Health, Education and Welfare
n n n n n n n n n n
n (now HHS), and the Veterans Administration ran into similar difficulties in the use of
n n n n n n n n n n n n n
n construction management. Which of the following was/were common problems for all
n n n n n n n n n n
n three agencies?
n
A) Funding restrictions
n n
B) Claims
n
C) Change conditions
n n
D) All of the above - ANS-D) All of the above
n n n n n n n n n n
CMAA was formed and incorporated 1982 with its primary focus being the growth and
n n n n n n n n n n n n n
n development of the construction management profession. - ANS-True
n n n n n n n
The CMAA Construction Management Standards of Practice is intended as a guide to the
n n n n n n n n n n n n n
n range of services that constitute professional construction management. They seek to
n n n n n n n n n n
,n meet the documented need for definitions of what construction management services are,
n n n n n n n n n n n
n without unduly structuring the methodologies by which those services are provided by
n n n n n n n n n n n
n the CM. - ANS-True
n n n
The goals of the Construction Management Association of America (CMAA) include:
n n n n n n n n n n
A) Setting standards and developing contract documents for construction management
n n n n n n n n n
n practice.
B) Expanding the understanding of the construction management concept and its use in
n n n n n n n n n n n n
n the marketplace.
n
C) Advocacy for construction management in the legislative, regulatory, and judicial
n n n n n n n n n n
n arenas of federal, state, and local governments.
n n n n n n
D) All of the above. - ANS-D) All of the above
n n n n n n n n n n
The fact that an individual is certified or licensed in any other profession does not, per se,
n n n n n n n n n n n n n n n n
n establish him/her as a qualified CM.
n n n n n
True False - ANS-True
n n n
Certification as a CM means the construction management practitioner has "state of the
n n n n n n n n n n n n
n art" knowledge and capability to practice construction management.
n n n n n n n
True False - ANS-False
n n n
Recruiting and training are business matters and normally do not involve ethical
n n n n n n n n n n n
n concerns.
, True False - ANS-False
n n n
Construction management is a concept that is susceptible to overselling.
n n n n n n n n n
True False - ANS-True
n n n
Failure to provide quality services is a business and not an ethical question.
n n n n n n n n n n n n
True False - ANS-False
n n n
Contracting for adequate fees is both a business and an ethical issue.
n n n n n n n n n n n
True False - ANS-True
n n n
The ethics of the CM profession focus primarily on a CM's relationships in dealing with its
n n n n n n n n n n n n n n n
n clients.
True False - ANS-True
n n n
The possible approaches for delivering a project are virtually unlimited. A key reason for
n n n n n n n n n n n n n
n such variations is:
n n
A) The different roles that can be assumed by project participants.
n n n n n n n n n n
B) Different forms of contracts and methods of compensation that can be used.
n n n n n n n n n n n n
C) The different levels of care, responsibility, and risks assumed by the parties involved.
n n n n n n n n n n n n n
D) All of the above. - ANS-D) All of the above
n n n n n n n n n n
WITH 100% CORRECT ANSWERS| 2024|
GRADED A
A CM's role and responsibilities are governed solely by the Owner/CM Agreement.
n n n n n n n n n n n
True False - ANS-True
n n n
There are two basic forms of CM, agency and at-risk. Each form provides for the basic
n n n n n n n n n n n n n n n
n services of construction management practice. However, there are some key differences.
n n n n n n n n n n
n Which of the following do not apply to both CM forms?
n n n n n n n n n n
A) Both forms provide advice to the owner on constructibility, budget and the schedule.
n n n n n n n n n n n n n
B) Both require that the liabilities and risks assumed by the parties be clearly understood,
n n n n n n n n n n n n n n
n coordinated, and stated in the respective contracts.
n n n n n n
C) Both forms allow the CM to function in an advisory role for the entire engagement of
n n n n n n n n n n n n n n n n
n the CM. n
D) Services can vary based on the contractual relationships of the parties and the risks
n n n n n n n n n n n n n n
n that are assumed. - ANS-C) Both forms allow the CM to function in an advisory role for
n n n n n n n n n n n n n n n n
n the entire engagement of the CM.
n n n n n
Construction management had its beginnings in the early to mid-1960's. Which of the
n n n n n n n n n n n n
n following factors contributed to the initial use of this delivery system?
n n n n n n n n n n
,A) The need to reduce the overall time and cost associated with project delivery.
n n n n n n n n n n n n n
B) The increasing cost of money and the unpredictability of project funding streams.
n n n n n n n n n n n n
C) The changing role of the general contractor and the increasing numbers of specialty
n n n n n n n n n n n n n
n trade contractors.
n
D) All of the above. - ANS-D) All of the above.
n n n n n n n n n n
The General Services Administration was the first federal agency to use construction
n n n n n n n n n n n
n management. - ANS-True n n
The General Services Administration, the Department of Health, Education and Welfare
n n n n n n n n n n
n (now HHS), and the Veterans Administration ran into similar difficulties in the use of
n n n n n n n n n n n n n
n construction management. Which of the following was/were common problems for all
n n n n n n n n n n
n three agencies?
n
A) Funding restrictions
n n
B) Claims
n
C) Change conditions
n n
D) All of the above - ANS-D) All of the above
n n n n n n n n n n
CMAA was formed and incorporated 1982 with its primary focus being the growth and
n n n n n n n n n n n n n
n development of the construction management profession. - ANS-True
n n n n n n n
The CMAA Construction Management Standards of Practice is intended as a guide to the
n n n n n n n n n n n n n
n range of services that constitute professional construction management. They seek to
n n n n n n n n n n
,n meet the documented need for definitions of what construction management services are,
n n n n n n n n n n n
n without unduly structuring the methodologies by which those services are provided by
n n n n n n n n n n n
n the CM. - ANS-True
n n n
The goals of the Construction Management Association of America (CMAA) include:
n n n n n n n n n n
A) Setting standards and developing contract documents for construction management
n n n n n n n n n
n practice.
B) Expanding the understanding of the construction management concept and its use in
n n n n n n n n n n n n
n the marketplace.
n
C) Advocacy for construction management in the legislative, regulatory, and judicial
n n n n n n n n n n
n arenas of federal, state, and local governments.
n n n n n n
D) All of the above. - ANS-D) All of the above
n n n n n n n n n n
The fact that an individual is certified or licensed in any other profession does not, per se,
n n n n n n n n n n n n n n n n
n establish him/her as a qualified CM.
n n n n n
True False - ANS-True
n n n
Certification as a CM means the construction management practitioner has "state of the
n n n n n n n n n n n n
n art" knowledge and capability to practice construction management.
n n n n n n n
True False - ANS-False
n n n
Recruiting and training are business matters and normally do not involve ethical
n n n n n n n n n n n
n concerns.
, True False - ANS-False
n n n
Construction management is a concept that is susceptible to overselling.
n n n n n n n n n
True False - ANS-True
n n n
Failure to provide quality services is a business and not an ethical question.
n n n n n n n n n n n n
True False - ANS-False
n n n
Contracting for adequate fees is both a business and an ethical issue.
n n n n n n n n n n n
True False - ANS-True
n n n
The ethics of the CM profession focus primarily on a CM's relationships in dealing with its
n n n n n n n n n n n n n n n
n clients.
True False - ANS-True
n n n
The possible approaches for delivering a project are virtually unlimited. A key reason for
n n n n n n n n n n n n n
n such variations is:
n n
A) The different roles that can be assumed by project participants.
n n n n n n n n n n
B) Different forms of contracts and methods of compensation that can be used.
n n n n n n n n n n n n
C) The different levels of care, responsibility, and risks assumed by the parties involved.
n n n n n n n n n n n n n
D) All of the above. - ANS-D) All of the above