When a contractor begin work generated by a change order that does not have a
full negotiated agreement on terms of work, cost, and schedule signed by both
parties, a contract change has been initiated that is _______ . - ACCURATE
ANSWER✅✅Undefinitized
All of the five elements (5Ms) of manufacturing contribute o the cost of
production. Which one of the following is NOT one of the 5Ms? - ACCURATE
ANSWER✅✅Mandates.
According to learning curve theory, when the quantity of an item produced
doubles, the labor hours required to produce the item _______. - ACCURATE
ANSWER✅✅Decreased by a fixed percentage.
,The ____________ has a direct line of communication with the Procuring
Contracting Officer, and the __________ has a direct line of communication with
the Program Manager. - ACCURATE ANSWER✅✅Administrative Contracting
Officer, Program Integrator.
Personal liability for unauthorized commitments is determined by _________. -
ACCURATE ANSWER✅✅The procedures of each agency.
Design changes that are made after the beginning of production tend to be equal in
cost to changes made prior to production. - ACCURATE ANSWER✅✅False
The cost of achieving quality can be broken down into which THREE of the
following areas (Select three answers): - ACCURATE ANSWER✅✅1).
Appraisal
2). Failure
3). Prevention
In determining the correct appropriation for funding the development of a product
improvement, the first/primary consideration is: - ACCURATE
ANSWER✅✅Will it increase the performance capability?
Process proofing ensures that high risk areas, such as assembly methods and
personnel training, are optimized _______________________. - ACCURATE
ANSWER✅✅Before the start-up of full rate production
Which of the following can negatively impact the learning curve, production costs,
and schedule? - ACCURATE ANSWER✅✅Inconsistent product design.
, Manpower, measurement, methods, machinery, and materials are collectively
referred to as the ___________________. - ACCURATE ANSWER✅✅5Ms of
Manufacturing.
Which process is recommended for those products with the highest volume and the
highest standardization on the product continuum? - ACCURATE
ANSWER✅✅Continuous flow.
Lean manufacturing tends to increase manufacturing costs and delay schedules in
the manufacturing process. - ACCURATE ANSWER✅✅False.
Which process is recommended for those products with the lowest volume and the
lowest standardization on the product continuum? - ACCURATE
ANSWER✅✅Jumbled flow
Which of the following is NOT lawful authority and can be a cause of
unauthorized commitments? - ACCURATE ANSWER✅✅Apparent Authority
As production of an item increases, what impact does that typically have on the
unit cost? - ACCURATE ANSWER✅✅Unit cost decreases
What is the typical impact on a program's cost and schedule when unstable
requirements lead to changes late in the system's development? - ACCURATE
ANSWER✅✅Significantly negative impact on cost and schedule.
In determining the correct appropriation for funding the development of a product
Improvement, the first/primary consideration is: - ACCURATE
ANSWER✅✅Will it increase the performance capability?