OSHA 10 Hour Study Guide Questions And Answers Already Graded A+
According to 1910.38 Emergency Action Plans, what are the 5 requirements which serve as nonmandatory guidelines to assist employers in complying with the 1910 Subpart E Appendix? - Emergency action plan elements, emergency evacuation, emergency action plan training, fire prevention housekeeping, maintenance of equipment under the fire prevention plan According to 29 CFR 1910.1200, what is the definition of a hazardous chemical? - Any chemical which can cause a physical or a health hazard According to 29 CFR 1910.147(a)(3)(i), what is the purpose of the lockout/tagout standard? - To require employers to establish a program and utilize procedures for affixing appropriate lockout/tagout devices and to otherwise disable machines/equipment to prevent unexpected energization, start up, or release of stored energy is order to prevent injuries to employees. According to 29 CFR 1910.147(c)(1), what three elements must be included in an energy control program? - Energy control procedures, employee training, and periodic inspections According to 29 CFR 1910.176, housekeeping of storage areas shall be what? - Kept free from accumulation of materials that constitute hazards from tripping, fire, explosion, or pest harborage. According to 29 CFR 1910.176, rolling railroad car requirements include: - Cars shall be derailed/bumper blocks shall be provided on spur railroad tracks where a rolling car could contact other cars being worked or enter a building, work, or traffic areas. According to 29 CFR 1910.176(b), how must the storage of bags, containers, bundles, and other such items be made stable and secure against sliding or collapse? - Material should not create a hazard and should be stacked, blocked, interlocked and limited in height. According to 29 CFR 1910.179, what are the requirements for rated load marking? - Shall be plainly marked on each side and legible from the ground.According to 29 CFR 1910.184, what is the definition of a choker hitch? - A sling configuration with one end of the sling passing under the load and through an end attachment, handle, or eye on the other end of the sling According to 29 CFR 1910.184, what is the definition of a sling? - An assembly which connects the load to the material handling equipment
Written for
- Institution
- OSHA 10 Hour
- Course
- OSHA 10 Hour
Document information
- Uploaded on
- July 21, 2024
- Number of pages
- 8
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
Also available in package deal