100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

Construction Engineering Exam 1 UNCC (Questions + Answers) Verified 100% Correct!!.

Rating
-
Sold
-
Pages
7
Grade
A+
Uploaded on
23-06-2024
Written in
2023/2024

2 Construction Sectors - 1) Public Sector 2) Private Sector 3 Levels of Engineering Drawings - (NOT FOR CONSTRUCTION) 1) Planning-Level Drawings 2) Conceptual-Level Drawings 3) Final Design Drawings As-Built Drawings - Drawings implying all features are present Bid Documents - All documents used to solicit information, quotations, or proposals from prospective sellers. Code - A systematically arranged body of regulations or rules pertaining to one subject area (Precedent over contract documents! Commercial National Model Code - IBC: International Building Code Competence - Parties must be mentally competent, not a minor, or do not otherwise have the power to enter into the contract Components in Set of Property Drawings - 1) Title Sheet 2) Index, General Notes, Symbols, and Abbreviations 3) Plans 4) Sections 5) Details 6) Various Section/Detail Notations7) Profile View 8) Elevations 9) Shop Drawings Confluence of 3 Pillars for Sustainablity - 1) People 2) Planet 3) Profit Consideration - Anything of value but the amount and type is not relevant Construction Documents - 1) Engineering Design Documents 2) Bid Documents 3) Construction Documents Construction Management Advantages - 1) Constructability reviews and value engineering 2) CM works in owner's interest only 3) Can be fast tracked 4) Competitive bidding 5) Can use multi-prime contracts Construction Management at Risk Advantages - 1) Constructability reviews and value engineering 2) Can be fast-tracked 3) Owner only has 2 contracts Construction Management at Risk Disadvantages - 1) Typically requires sophisticated owner 2) No competitive bidding for general contractor Construction Management Disadvantages - 1) Typically requires sophisticated owner2) Possible supervision confusion 3) Owner may have many contracts Cost-Plus Contracts - Adding a standard markup (set percentage added) to the cost of the product rather than have companies compete for the lowest bid; allowed for faster mobilization because companies made higher profits from producing more/fast

Show more Read less
Institution
Construction Engineering UNCC
Course
Construction Engineering UNCC









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Construction Engineering UNCC
Course
Construction Engineering UNCC

Document information

Uploaded on
June 23, 2024
Number of pages
7
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Brainarium Delaware State University
View profile
Follow You need to be logged in order to follow users or courses
Sold
1824
Member since
2 year
Number of followers
1044
Documents
22260
Last sold
18 hours ago

3.8

317 reviews

5
147
4
60
3
54
2
16
1
40

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions