VA DEQ SWM Inspector Exam Latest Version 2024/2025 Expert-Verified Q&As
A locality VSMP must be at least as stringent as what state permit? - The construction GP A SWM Plan must be approved by who prior to land disturbance? - the VSMP Program Authority all SWPPP requirements may be met by - incorporating other plans into reference, or by developing missing elements. At what % impervious cover are streams substantially affected? - 25% BMPs use these three mechanisms to control pollution: - Infiltration, settling, and vegetative uptake Co-located practices - During construction, a facility functions for ESC, and is later constructed into a stormwater BMP. Define LDA - Land disturbing activity; any man-made change to the land surface that potentially changes its runoff characteristics; includes clearing, grading, and excavation. DEQ is responsible for enforcing the ______ while locality _______ are responsible for enforcing local ordinances. - Construction GP, VSMP Does a SWM plan address runoff during or after construction? - post-construction
Document information
- Uploaded on
- June 18, 2024
- Number of pages
- 7
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers