Work Package - The work defined at the lowest level of the work breakdown structure for which cost and duration can be estimated and managed. Acceptance Criteria - A set of conditions that is required to be met before deliverables are accepted. Accuracy - Within the quality management system, accuracy is an assessment of correctness. Activity List - A documented tabulation of schedule activities that shows the activity description, activity identifier, and a sufficiently detailed scope of work description so project team members understand what work is to be performed.