PJM Generation Dispatch Exam Questions and Answers
PJM Generation Dispatch Exam Questions and Answers Which of the following statements is correct concerning PJM assuming frequency control of the restoration process? A) PJM assumes control once an external transmission tie has been established. B) Once an Area Control Error can be calculated, PJM will assume control. C) Whenever it becomes too much of a burden for any one Transmission Owner within the RTO D) Whenever the Transmission Owners within the RTO agree to let PJM control the process. - Correct Answer ️️ -C) Whenever it becomes too much of a burden for any one Transmission Owner within the RTO During black start restoration, priority access to cranking power should be given to: A) Hot units that can return to service immediately. B) Combustion turbines in areas where the initial disturbance occurred C)Units with black start capability D) Hydro Units - Correct Answer ️️ -A) Hot units that can return to service immediately. During a restoration, if you are presented with the opportunity to re-connect with the Eastern Interconnection, you should: A)Not pursue this opportunity because you may cause the Eastern Interconnection to become unstable. B) Pursue this opportunity only when you have adequate Dynamic Reserves on your system C) Pursue this opportunity as quickly as possible D) Pursue this opportunity only if you need cranking power for your generating unity - Correct Answer ️️ -C) Pursue this opportunity as quickly as possible Complete (Total System) Blackouts are characterized by which of the following? 1 - Most common type of blackout 2 - May require coordinating multiple islands 3 - Likely to result in Transmission overloads or other issues 4 - Affects a very large geographical area, and many customers 5 - Most commonly caused by human or switching errors A) 1 & 3 B) 2 & 4 C) 3 & 5 D) 1 - Correct Answer ️️ -B) 2 & 4 The first step in a system restoration would be to: A) Immediately notify the media of the event B) Restore as much of the area load as possible C) Restore as much under-frequency load as possible D) Verify that communication is functional with your neighbors - Correct Answer ️️ -D) Verify that communication is functional with your neighbors Why would an offsite power to generating facilities be a priority during the restoration process? A) To provide safe shutdown power for the units B) To meet FERC requirements C) To provide adequate lighting for the plant operators to attempt a restart D) To prepare and expedite the return of the unit - Correct Answer ️️ -D) To prepare and expedite the return of the unit Factors that help determine the sequence of restoration of off-line generation include (Pick 2): -Generation Type -Unloaded Capacity -Unit Availability -Stability of the Generator - Correct Answer ️️ --Generation Type -Unit Availability How often should a Transmission company file an updated restoration report with PJM? 1 - Every 30 minutes 2 - Every hour 3 - Every 10 lines that have been restored 4 - Every 5 lines that have been restored A) 1 & 4 B) 2 & 3 C) 1 & 3 D) 2 & 4 - Correct Answer ️️ -C) 1 & 3 Which of the following statements are true concerning delays in restoring auxiliary power to off-line generation? 1 - The unit could suffer turbine shaft damage 2 - The fuel oil for the unit could congeal 3 - The startup time for the unit will be reduced 4 - The battery life used to maintain critical systems may ru
Written for
- Institution
- PJM Generation
- Course
- PJM Generation
Document information
- Uploaded on
- June 5, 2024
- Number of pages
- 74
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
pjm generation dispatch exam questions and answers
Also available in package deal