PJM Generation Dispatcher Sample Exam Questions and Answers Real time transmission constraints or contingencies may be alleviated with generators operating : A. below 60 hertz B. on a new price curve C. on a new cost curve D. off cost ( out of merit) - Correct Answer ️️ -D. off cost ( out of merit ) Monitoring LMP may give insights into : A. system constraints B. system voltage C. system frefuency D. time error - Correct Answer ️️ -A. system constraints PJM calls for which of the following to recover the ACE so that tie line schedules are maintained ? A. IRC ( instantaneous reserve check ) B. synchronized Reserves C. supplemential reserves D. minimun generation calculation - Correct Answer ️️ -B. synchronized Reserves If not cancelled by PJM , the minimum generation alert expires : A. at the end of the specified light load period B. when notified by NERC C. 12 hours after the alert was issued D. after a 24 hour period - Correct Answer ️️ -A. at the end of the specified light load period When PJM declares a hot weather alert , the generation dispatcher should 1. determine if maintenance can be deferred 2. notift transmission operators 3. notify all generating stations and key personnel 4. direct all generating stations to reduce output A. 1 and 2 only B. 1 and 3 only C. 2 and 4 only D. 3 and 4 only - Correct Answer ️️ -B. 1 and 3 only 1. determine if maintenance can be deferred 3. notify all generating stations and key personnel During system restoration, the two categories of reserves are : A. dynamic and secondary B. spinning and quick start C. dynamic and spinning D. spinning and primary - Correct Answer ️️ -C. dynamic and spinning During system restoration, frequency should be maintained between : A. 59.50 and 60.00 hertz B. 59.75 and 61.50 hertz C. 59.75 and 61.00 hertz D. 59.50 and 60.50 hertz - Correct Answer ️️ -C. 59.75 and 61.00 hertz PJM issues a heave load voltage schedule. Member companies who own generation facilities should : A. remove 230 kV capacitors from service B. ensure voltage regulators on generating units are in service on automatic C. inform transmission providers to have marketers in their areas cut transactions D. instruct generating stations to curtail nonessential building loads - Correct Answer ️️ -B. ensure voltage regulators on generating units are in service on automatic A unit being dispatched economically by PJM should set its MW output based on the : A. LMP at generator bus B. LMP in the units zone C. units dispatch rate or desired MW level D. generation owners discretion - Correct Answer ️️ -C. units dispatch rate or desired MW level A fossil steam unit is considered fuel limited when it is not capable of r

Show more Read less
Institution
PJM Generation
Course
PJM Generation









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
PJM Generation
Course
PJM Generation

Document information

Uploaded on
June 5, 2024
Number of pages
Unknown
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

PJM Generation Dispatcher Sample Exam Questions and Answers Real time transmission constraints or contingencies may be alleviated with generators operating : A. below 60 hertz B. on a new price curve C. on a new cost curve D. off cost ( out of merit) - Correct Answer ✔️✔️-D. off cost ( out of merit ) Monitoring LMP may give insights into : A. system constraints B. system voltage C. system frefuency D. time error - Correct Answer ✔️✔️-A. system constraints PJM calls for which of the following to recover the ACE so that tie line schedules are maintained ? A. IRC ( instantaneous reserve check ) B. synchronized Reserves C. supplemential reserves D. minimun generation calculation - Correct Answer ✔️✔️-B. synchronized Reserves If not cancelled by PJM , the minimum generation alert expires : A. at the end of the specified light load period B. when notified by NERC C. 12 hours after the alert was iss ued D. after a 24 hour period - Correct Answer ✔️✔️-A. at the end of the specified light load period When PJM declares a hot weather alert , the generation dispatcher should 1. determine if maintenance can be deferred 2. notift transmission operators 3. notify all generating stations and key personnel 4. direct all generating stations to reduce output A. 1 and 2 only B. 1 and 3 only C. 2 and 4 only D. 3 and 4 only - Correct Answer ✔️✔️-B. 1 and 3 only 1. determine if maintenance can be deferred 3. notify all generating stations and key personnel During system restoration, the two categories of reserves are :

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
BrittieDonald Howard Community College
View profile
Follow You need to be logged in order to follow users or courses
Sold
397
Member since
2 year
Number of followers
162
Documents
20438
Last sold
14 hours ago
BrittieDonald Study Solutions.

Get Help in Your Due Online and Actual Exams, Assignments with Well Researched and Up-to date Study Materials for Guaranteed Success

3.3

78 reviews

5
31
4
13
3
7
2
5
1
22

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions