PJM Sample Test Review 2024 Questions and Answers
PJM Sample Test Review 2024 Questions and Answers Real time transmission constraints or contingencies may be alleviated with generators operating ______________ - Correct Answer ️️ -off cost out of merit. Monitoring ___________ may give insights into system constraints. - Correct Answer ️️ -Monitoring LMP's PJM calls for _____________ reserves to recover ace so that tie line schedules are maintained. - Correct Answer ️️ -PJM calls on synchronized reserves If not cancelled by PJM, the minimum generation alert expires at the end of the specified ______________. - Correct Answer ️️ -light load period When PJM declares a hot weather alert, the generation dispatcher should determine if maintenance can be deferred and notify all generating stations and key personnel. - Correct Answer ️️ - During system restoration, the two categories of reserves are dynamic and spinning. - Correct Answer ️️ - During system restoration, frequency should be maintained between 59.75 and 61.00 Hertz. - Correct Answer ️️ - PJM issues a heavy load voltage schedule. Member companies who own generation facilities should ensure voltage regulators on generating units are in service & automatic. - Correct Answer ️️ - A unit being dispatched economically by PJM should set its megawatt output based on the unit's dispatch rate or desired megawatt level. - Correct Answer ️️ - A fossil steam unit is considered fuel limited when it is not capable of running at its maximum capacity for the next 72 hours - Correct Answer ️️ - During system restoration prior to synchronization of a unit, the dispatcher should ensure sufficient load is available to stabilize unit operation. - Correct Answer ️️ - A large unit in an external control area near PJM/PJM West trips. The PJM operator will see ace remain the same, frequency decrease. - Correct Answer ️️ - LMPs will change when marginal generator output changes - Correct Answer ️️ - The two control signals sent by the PJM E M S are regulation and dispatch rate (desired MW output). - Correct Answer ️️ - An all-call is the one-way communication system used to disseminate information to market operation centers. - Correct Answer ️️ - Real time bus prices may be monitored using data viewer. - Correct Answer ️️ - Not offering an available PJM capacity resource into the day ahead market is a violation of PJMs two settlement market rules. - Correct Answer ️️ - A unit that fails to start when scheduled, would be classified as an unplanned outage. - Correct Answer ️️ - Maximum Generation Emergency is declared by PJM when generation is required above the highest incremental economic cost. - Correct Answer ️️ - Maintenance outages are permitted when a unit can be held online until the following Monday, and system reliability is not affected - Correct Answer ️️ - If PJM ace shows over-generation, actual imports are less than scheduled. - Correct Answer ️️ - PJM will request a Supplementary Status Report when a Maximum Generation Emergency Alert is issued. - Correct Answer ️️ - If a fossil steam unit has less than 32 hours of fuel at maximum capacity, it should be bid at maximum emergency. - Correct Answer ️️ - The loss of a large generation unit on the PJM system can be detected by monitoring frequency and PJM ace. - Correct Answer ️️ - A 1000 megawatt unit has tripped in the PJM control area and the PJM
Written for
- Institution
- PJM Generation
- Course
- PJM Generation
Document information
- Uploaded on
- June 5, 2024
- Number of pages
- 17
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
pjm sample test review 2024 questions and answers
Content preview
Also available in package deal