Voice-Data-Video System Drawings and Specifications (100 OUT OF 100) Already GRADED A.
Voice-Data-Video System Drawings and Specifications (100 OUT OF 100) Already GRADED A. Chapter 1: Project Professionals, Design Phases, and the Construction Process A typical commercial construction project begins with a( n ) __________ seeking to develop a new or existing property to meets specific needs. A. Architect B. Engineer C. General Contractor ( GC ) D. Owner Owner Chapter 1: Project Professionals, Design Phases, and the Construction Process The __________ is responsible for all inspections, the final building occupancy approval sign-off, and the commissioning of all building systems. A. Architect B. Engineer C. General Contractor ( GC ) D. Owner General Contractor ( GC ) Chapter 1: Project Professionals, Design Phases, and the Construction Process Voice-Data-Video System Drawings and Specifications (100 OUT OF 100) Already GRADED A The __________ phase gives the owner the first opportunity to see the potential design and get an approximation of the costs A. Bidding B. Construction document C. Design development D. Schematic design Schematic design Chapter 1: Project Professionals, Design Phases, and the Construction Process The __________ are the fully completed design that complies with building codes and industry standards and are ready for bidding and, ultimately, the construction of the facility A. Addendum B. Construction documents C. Drawings D. Specifications Construction documents Chapter 1: Project Professionals, Design Phases, and the Construction Process The bidding method is often used for the electrical and VDV system portions of a project. A. Competing B. Cost-plus C. Labor-only D. Negotiated/design-assist Labor-only Chapter 1: Project Professionals, Design Phases, and the Construction Process The __________ bidding method can often save time, provide flexibility, and avoid the risk of removing completed or partially completed work and starting over. A. Competitive B. Cost-plus C. Labor-only D. Negotiated/design-assist Cost-plus Chapter 1: Project Professionals, Design Phases, and the Construction Process Most often, the product selection for private work is specified by __________. A. Cost B. Industry standards C. Specific OEMs D. Performance Specific OEMS Chapter 1: Project Professionals, Design Phases, and the Construction Process A( n ) __________ is a document that project managers use to resolve conflicts early in the process to attempt to eliminate costly corrective measures A) Addendum B) Construction change directive C) Punch list D) Request for information ( RFI ) Request for information ( RFI ).
Written for
- Institution
- Voice-Data-Video System Drawings and Specification
- Course
- Voice-Data-Video System Drawings and Specification
Document information
- Uploaded on
- June 2, 2024
- Number of pages
- 56
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
voice data video system drawings and specification
-
voice data video system exam graded a
-
voice data video system exam
-
voice data video system exam latest update
-
voice data video system exam 100 out of
Also available in package deal