CSI CDT Exam Study Guide (questions and answers) 100% solved Owner - CORRECT ANSWER-Principle stakeholder - initiates project, assumes risk, provides funding AHJ - Authorities Having Jurisdiction - CORRECT ANSWER-Protect public health, safety and welfare Design Team - CORRECT ANSWER-Address planning issues, determine design program, identify codes and regulations, produce procurement and construction documents, administer construction contract, *provide QA/QC procedures* Contractor Team - CORRECT ANSWER-Entity that constructs a facility. Uses management abilities to gather labor forces, subs, and material/product/equipment suppliers Supplier Team - CORRECT ANSWER-Furnishes the materials and products for the facility to be constructed. Fabricator, Distributor, Manufacturer, Supplier. Facility Life Cycle - CORRECT ANSWER-The life cycle of a facility, from concept through construction to use and eventual deconstruction. Project Conception Project Delivery Design Construction Documents Procurement (Bidding/Negotiating/Purchasing) Construction Facility Management Project Conception - CORRECT ANSWER-Transforms the needs of owner into clear concept on which project can be designed. Feasibility Study, Programming, Site Selection, Budgeting. Project Delivery - CORRECT ANSWER-Determine delivery method to be used. Factors - qualifications, experience, capacity, project extent, time requirements. Design - CORRECT ANSWER-Two Phases: schematic design and design development. Deliverables include graphic and written design documents and estimates of project cost. Schematic Design - CORRECT ANSWER-Overall relationships and functions. Site plan and area, general size/shape/massing of elements, elevations and exteriors established, conceptual design criteria identified. Deliverables - schematic drawings, probable cost, preliminary schedules Design Development - CORRECT ANSWER-Technical issues of constructibility and integration of systems and components. Deliverables - Tech information, outline specifications, updated schedule, updated cost

Show more Read less
Institution
Cdt
Course
Cdt









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Cdt
Course
Cdt

Document information

Uploaded on
May 30, 2024
Number of pages
15
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Academic1 NURSING
View profile
Follow You need to be logged in order to follow users or courses
Sold
67
Member since
1 year
Number of followers
16
Documents
1000
Last sold
2 months ago

3.4

11 reviews

5
4
4
1
3
3
2
1
1
2

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions