Seminar Test #1 Questions And Guaranteed Answers 100% Verified/2024.
Singular responsibility for both design and construction was first codified: - correct answer by Hammurabi Successful Design-Build requires: - correct answer trust and flexibility between participants Project "fast tracking" can be facilitates in an integrated manner more readily by using the following project delivery method: - correct answer Design Build What year was architecture established as a profession distinct from the science of engineering and construction? - correct answer 1456 During which major period of time were tasks related to project delivery specialized and labor divided? - correct answer Industrial Revolution The emergence of professional societies allowed for the development of: A. all of these B. ethical standards of practice C. promotion and advocacy of professional interests D. greater professional specialization - correct answer A. all of these Specialization or separation within the design and construction industries became prevalent during which period of time (approximately)? - correct answer 1850s Which of these events contributed to the separation of sectors within the design and construction industries? A. rise of professional societies B. IPD model creation C. DBIA formation D. none of these - correct answer D. none of these In which year was the Design-Build Institute of America (DBIA) founded? - correct answer 1993 The mission of DBIA is to promote the value of design-build project delivery and teach the effective integration of design and construction services to ensure success for _____. A. design practitioners B. construction practitioners C. all of these D. owners - correct answer C. all of these A ___ is a comprehensive process including planning, design, construction & other services necessary for organizing, executing & completing a building facility or project. - correct answer Project Delivery System In a multi-prime contractual relationship, who is responsible for the programming, financing, and management of the project? - correct answer Owner Out of these options, why would an owner choose CM-at-risk over other project delivery methods? - correct answer Project delivery faster than traditional Design-Bid-Build. The Implied Warranty of the contract documents by the owner is also referred to as: - correct answer The Spearin Doctrine What influence does the selected Project Delivery Method have on a project? A. Influences ownership, impact of changes and modifications of project cost B. All of the above C. Establishes when the parties become engaged in the project D. Influences contractual relationships among parties - correct answer B. All of the above What percentage of the Design-Build Entity is structurally arranged to be Contractor-led? - correct answer 54% Which of the following is NOT a basic party involved in the Project Delivery Process? - correct answer Sub-Contractors Which project delivery method has a one-contract system that uses an integrated process with two prime players? - correct answer Design-Build Which Project Delivery Method is commonly called the "Traditional" method of delivery? - correct answer Design-Bid-Build Which project delivery method has a two-contract system that uses a linear process with three prime players? - correct answer CM-at-Risk The methodology used to buy design & construction services is called: - correct answer Procurement Which of the following procurement methods eliminates the competitive process because one known source exists or is qualified. - correct answer Sole Source Which of the following acts establishes the procurement process by which architects and engineers (A/Es) are selected for design contracts with federal design and construction agencies? - correct answer Brooks Act 1972 Which of the following best describes QBS? A. with professional services to establish project scope, budget, & schedule B. Competitive process based on qualifications & project approach only C. Contract format options are cost plus, GMP, target price or lump sum D. All of the Above - correct answer D. All of the Above Which process uses a combination of qualifications, technical, & cost criteria? - correct answer Best Value Selection Which procurement method is considered to be "traditional" and is price driven? - correct answer Low Bid What are the two general categories of procurements options? - correct answer Limited Competition and Open Competition Which is NOT a key component of QBS? - correct answer It is a Limited Competition procurement What are the phases of the BVS selection process? - correct answer RFQ, then RFP In Best Value Selection, which of the following is NOT a consideration? - correct answer Neglects giving Owners flexibility while abandoning the competitive environment Expand the acronym CII as presented in Fundamentals Module 7. - correct answer Construction Industry Institute What university did CII partner with for the integral 1999 study that examined 19 factors related to project delivery method selection? - correct answer Penn State According to the Project Delivery Methods study by CII & Penn State, Unit Cost can be reduced by what percentage on average when DB is utilized versus DBB? - correct answer 6.1% According to the Project Delivery Methods study by CII & Penn State, Construction Speed can be reduced by what percentage on average when DB is utilized versus DBB? - correct answer 12% Which organization created a complimentary study on D-B that projected similar results to the CII & Penn State study? - correct answer Reading DB Forum (UK)
Written for
- Institution
- DBIA.
- Course
- DBIA.
Document information
- Uploaded on
- May 11, 2024
- Number of pages
- 10
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
Also available in package deal