Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 41 pages
Exam (elaborations)

Traffic Supervisor Exam Questions with 100% correct answers

Document preview thumbnail
Preview 4 out of 41 pages

Traffic Supervisor Exam Questions with 100% correct answers Is a shadow vehicle used in all traffic zones? A. True B. False - answers False The shadow vehicle is occupied whenever workers are in the work area. A. True B. False - answers False What class one light is the shadow vehicle equipped with? A. Flashing Yellow Light B. Oscillating Yellow Light C. Yellow Strobe Light D. All of the above - answers All of the above When may cones be substituted for drums? A. Daytime traffic control minimum height 18" B. Daytime traffic control minimum height 28" C. Daytime traffic control minimum height 36" D. Daytime traffic control minimum height 42" - answers Daytime traffic control minimum height 28" When may cones be substituted for drums? A. Daytime traffic control minimum height 18" B. Daytime traffic control minimum height 28" C. Daytime traffic control minimum height 36" D. Daytime traffic control minimum height 42" - answers Daytime traffic control minimum height 28" When cones are substituted for drums for nighttime closers, what is the minimum cone height requirement? A. 18" B. 28" C. 36" D. 42" - answers 42" When cones are substituted for drums at nighttime closer, what is the maximum cone spacing? A. 20' B. 30' C. 40' D. 50' - answers 40' What type of flashing warning lights are required when there is a nighttime lane closer? A. ROAD WORK AHEAD B. LANE CLOSED AHEAD C. A & B D. NONE OF THE ABOVE - answers ROAD WORK AHEAD & LANE CLOSED AHEAD If there is a lane closure of greater than three days, what is required? A. Work zone dotted lines, 4' in length separated by 10' gaps, shall be provided to identify the merge. B. The appropriate color work zone edge lines shall be applied along the taper and tangent sections. C. All the above D. None of the above - answers The appropriate color work zone edge lines shall be applied along the taper and tangent sections. Work zone pavement marking that conflict with final traffic lanes shall be temporary paint. A. True B. False - answers False What are the extra advance warning signs? A. Lane Close Ahead B. Watch for Stopped Traffic C. Road Work Ahead D. All the above - answers Lane Change Ahead & Watch for Stopped Traffic & Road Work Ahead Is the advisory speed plaque used in all traffic zones? A. True B. False - answers False When the approach speed limit is 40 mph or less, 36" warning signs may be used. A. True B. False - answers True Road Work Ahead signs shall be provided on entrance ramps or roadways entering the work limits. A. True B. False - answers True End Road Work signs are only required for lane closures of more than ______ day. A. 1 B. 2 C. 3 D 4 - answers 1 Sign spacing should be adjusted to avoid conflict with existing signs, minimum spacing to existing signs shall be 200' for speeds of 45 mph or less and a minimum of 400' for speeds 50 mph or greater. A. True B. False - answers True The minimum acceptable length for the merge taper shall be determined by _________ the width of the offset by the merge taper rate. A. Subtracting B. Adding C. Divide D. Multiplying - answers Multiplying The tangent (recovery area) section betwe


Document information

Uploaded on
May 10, 2024
Number of pages
41
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers
$18.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
STUDENTSCORE
4.3
(3)
Sold
13
Followers
6
Items
1379
Last sold
1 month ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions

Whoops! We can’t load your doc right now. Try again or contact support.