PJM Transmission Exam Study Guide Questions and Answers Already Passed
PJM Transmission Exam Study Guide Questions and Answers Already Passed During System Restoration, what is the optimal Frequency Range? 59.75 - 61 Hz The 500 kV system has normal bus voltages between? 500 to 550 kV When Connecting 2 islands, the operator must match? Voltage, Phase Angle and Frequency What are the Minimum Source Requirements for a 500kV line? (Gen/mile and load/mile) 30 MW Gen/mile of energized 500 kV and 20 MW Load/mile of energized 500 kV When will PJM issue a Minimum Generation Alert? (how many MW under normal operating limits) When expected generation levels fall within 2500 MW of normal operating limits When a thunderstorm is nearing the BES should auto-reclosing be turned on? Yes What does SCADA stand for? Supervisory Control & Data Acquisition What does IROL stand for? Interconnection Reliability Operating Limit What does eDART stand for? Dispatcher Application and Reporting Tool What is eDART used for? (Electronic Disp Reporting Tool) It is used for: Generation Outage Scheduling, Instantaneous Reserve Checks, Generator Reactive Capabilities and to enter and submit switching What direction do VARS flow? From HIGH Voltage to LOW Voltage What direction do MW flow? From HIGH Phase Angle to LOW Phase Angle Which of the following factors are NOT used in forecasting load? 1) Weather Forecast 2) Historical Load Forecast 3) Historical Weather Data 4) Locational Marginal Pricing (LMP) Data 4 What one-way communication system is used to disseminate info to local call centers? All- Call The 3 categories of messages issued by PJM All-Call all EXCEPT: 1) Operational 2) Informational 3) Conflicting Interchange Values 4) Emergency Procedures 3 When should, transmission outages should be submitted to PJM to avoid cancellation and to be considered "on time?' First day of Month Prior to the Outage What report will be requested by PJM when a Max Generation Alert is issued? Supplementary Status Report (SSR) The loss of a large generation unit on the PJM system can be detected by monitoring: Frequency and PJM Area Control Error (ACE) The PJM system is operated such that the contingency flow is less than the: Emergency Rating When ordered a 5% voltage reduction should be taken on: The Distribution System TOs are required to report "Hot Line Work" on what voltage levels? 345 kV and Above Load dump rating of an EHV line is
Written for
- Institution
- PJM Transmission
- Course
- PJM Transmission
Document information
- Uploaded on
- April 24, 2024
- Number of pages
- 48
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
pjm transmission exam study guide questions and an
Also available in package deal